Solar panels in Frome, designed on a free call.
A 12-panel roof in Frome makes about 6,410 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
How much a Frome roof makes, month by month
Frome's best month is July, at 125.2 kWh per kWp; December manages 33.7. Over the year that comes to 1,008 kWh per kWp, 3% below our Somerset county estimate.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 37.7 |
| February | 52.1 |
| March | 87.8 |
| April | 115 |
| May | 123 |
| June | 121 |
| July | 125 |
| August | 110 |
| September | 94.6 |
| October | 64 |
| November | 44.6 |
| December | 33.7 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
For scale: 1,008 kWh per kWp in Frome against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Frome 9% above it.
How Frome compares
Among the places we publish figures for, Frome is one of 21 Somerset towns we track, and it ranks joint 18th of 21 for solar yield. It is a medium town in the House of Commons Library classification, with 28,302 residents, and its roofs see 2.76 peak sun hours a day across the year. That drives the standard 12 panel model to 6,411 kWh of generation, of which around 5,474 kWh is exported at 12p for £657 a year, with £247 saved on electricity you would otherwise buy at 26.32p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Frome's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Any planning application in Frome sits with Somerset, and its official House of Commons Library settlement class is medium town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Generation is modelled from PVGIS satellite data for Frome's own coordinates (51.23193, -2.31747), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.
The network operator for Frome
On NESO's licence-area map, Frome is in Southern England, which Scottish and Southern Electricity Networks (SSEN) operates. That makes SSEN the network operator for any system fitted here.
Below 3.68kW per phase of inverter and battery output, the G98 route applies: the installation is notified to SSEN within 28 days of commissioning, with no prior approval.
Above that, G99 means applying before the work is booked. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW.
Sources: NESO DNO licence areas (3 May 2024); SSEN, micro-generation connections page, checked 25 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Frome
A heat pump in Frome
In December, the darkest month here, 12 panels in Frome make about 210 kWh. That is when a heat pump runs hardest, so its running cost in Frome comes down to the tariff and the flow temperature rather than the roof.
In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).
Charging an EV in Frome
Frome's July output, about 800 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.
Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Frome
The same sourced benchmarks apply in Frome as everywhere we cover: honest repair pricing and what a service should include.
Solar in Frome: your questions answered
How much electricity do solar panels make in Frome?
About 6,410 kWh a year from 12 panels (6.36 kWp), on PVGIS satellite data for Frome: 1,008 kWh per kWp, or 2.76 peak sun hours a day on average. July is the strongest month, at about 800 kWh.
Is solar more expensive in Frome?
Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Frome, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,410 kWh a year here, which is what drives payback.
Which DNO covers Frome, and what does it need from me?
Scottish and Southern Electricity Networks (SSEN) covers Frome. A home system of up to 3.68kW per phase is notified to SSEN within 28 days of commissioning under G98, and nothing waits on approval. Larger outputs need a G99 application before work starts. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW.
What could I earn from exporting in Frome?
On the 12p export scenario, a 12-panel system in Frome sends about 5,474 kWh a year to the grid, worth around £657. The export rates table compares what each supplier pays.
How much solar does Frome get in December?
December is the low point: about 210 kWh from a 12-panel system in Frome, on PVGIS data, rising to 800 kWh in July. From November to February the same system makes about 1,070 kWh in total, which is why a battery charged off-peak does more of the work in winter.
How Frome compares with its neighbours
The six closest towns we publish, run through the identical PVGIS query as Frome.
| Town | kWh per kWp a year | vs Frome |
|---|---|---|
| Frome | 1,008 | this town |
| Westbury | 1,029 | +21 kWh |
| Warminster | 1,031 | +23 kWh |
| Radstock | 1,003 | −5 kWh |
| Trowbridge | 1,022 | +14 kWh |
| Midsomer Norton | 1,005 | −3 kWh |
| Bradford-on-Avon | 1,020 | +12 kWh |
Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.
Also for Frome: Solar panels in Frome from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Guides worth reading before your call
Sourced, dated and written by us. The same ground we cover on your free call.
Single phase or three phase? The sixty-second check that decides your system size
One look at your fuse board sets the ceiling on how much solar you can connect.
Read the guide →Inside a home battery: capacity, power and losses
Usable capacity, kW output, round trip losses and chemistry, in plain terms.
Read the guide →Smart charge point regulations, explained
Why your charger arrives pre-set to charge overnight, and why it waits before it starts.
Read the guide →Do you need to replace your radiators for a heat pump?
Some change, most do not. The room by room arithmetic that decides which.
Read the guide →Why tariff choice moves payback more than kit choice
Identical kit, five times the export income. The tariff decision worked through with August 2026 rates.
Read the guide →G98 or G99: which one applies, what the application involves, and how long it takes
The G98 line sits at 3.68kW per phase. Above it, your network operator has to say yes first.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.