0% VAT on solar panels and batteries ends 31 March 2027. What it means for you

07782 219224

Somerset

Solar panels in Frome, designed on a free call.

A 12-panel roof in Frome makes about 6,410 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.

Get my free quote

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation. We call or text within one working day.

Your design call is with Niall or Vince, our residential energy consultants.

or call 07782 219224

  • Free 30-minute video design call
  • Priced before anyone visits
  • Installed by our MCS-certified, fully insured teams
Sunlight in Frome

How much a Frome roof makes, month by month

Frome's best month is July, at 125.2 kWh per kWp; December manages 33.7. Over the year that comes to 1,008 kWh per kWp, 3% below our Somerset county estimate.

Map showing Frome in Somerset A simplified outline map of Somerset with neighbouring counties shown faintly, and a pin marking the location of Frome.
Frome in Somerset

Generation per kWp, month by month

Frome, 1,008 kWh per kWp a year
Frome, monthly generation per kWp Bar chart, twelve months January to December. Peak July at 125 kWh/kWp. Lowest December at 33.7 kWh/kWp. Full values are in the table below this chart. 144 0 JFMAMJJASOND 125
Show the monthly figures
Frome, monthly generation per kWp - monthly figures (kWh/kWp)
MonthkWh/kWp
January37.7
February52.1
March87.8
April115
May123
June121
July125
August110
September94.6
October64
November44.6
December33.7

Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.

6,410kWh a year, 12 panels
800kWh in July, the peak
210kWh in December

For scale: 1,008 kWh per kWp in Frome against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Frome 9% above it.

How Frome compares

Among the places we publish figures for, Frome is one of 21 Somerset towns we track, and it ranks joint 18th of 21 for solar yield. It is a medium town in the House of Commons Library classification, with 28,302 residents, and its roofs see 2.76 peak sun hours a day across the year. That drives the standard 12 panel model to 6,411 kWh of generation, of which around 5,474 kWh is exported at 12p for £657 a year, with £247 saved on electricity you would otherwise buy at 26.32p.

Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Frome's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.

Any planning application in Frome sits with Somerset, and its official House of Commons Library settlement class is medium town.

12 panels
530W panels. Most semi-detached roofs take 10 to 16 on one pitch.
Add a battery?
Installed prices. The named packages are the ones running on our current offers; the Duracell prices are for an installation alongside solar.
Electricity use
Export rate scenario
EV charger?
Estimated benefit, year one
£903
£75 a month · payback 7.0 yrs
System price, installed
£6,360
Simple payback
7.0 yrs
Generates a year
6,411 kWh
Exported
5,474 kWh at 12p
Where the money comes from
Solar you use, Export income, Off-peak shifting,

Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.

Price this for your roof

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation, nobody visits your home. Prefer to talk? 07782 219224

Your design call is with Niall or Vince, our residential energy consultants.

Generation is modelled from PVGIS satellite data for Frome's own coordinates (51.23193, -2.31747), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.

Local grid

The network operator for Frome

On NESO's licence-area map, Frome is in Southern England, which Scottish and Southern Electricity Networks (SSEN) operates. That makes SSEN the network operator for any system fitted here.

Below 3.68kW per phase of inverter and battery output, the G98 route applies: the installation is notified to SSEN within 28 days of commissioning, with no prior approval.

Above that, G99 means applying before the work is booked. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW.

Sources: NESO DNO licence areas (3 May 2024); SSEN, micro-generation connections page, checked 25 September 2026. G98 vs G99, explained.

Aerial view of a row of red-brick heritage cottages with solar panels spaced along the roof ridge
Solar panels spaced neatly along a row of red-brick heritage cottages.
Beyond solar

Heat pumps and EV charging in Frome

A heat pump in Frome

In December, the darkest month here, 12 panels in Frome make about 210 kWh. That is when a heat pump runs hardest, so its running cost in Frome comes down to the tariff and the flow temperature rather than the roof.

In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).

How heat pumps work

Charging an EV in Frome

Frome's July output, about 800 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.

Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.

EV charging explained

FAQs

Solar in Frome: your questions answered

How much electricity do solar panels make in Frome?

About 6,410 kWh a year from 12 panels (6.36 kWp), on PVGIS satellite data for Frome: 1,008 kWh per kWp, or 2.76 peak sun hours a day on average. July is the strongest month, at about 800 kWh.

Is solar more expensive in Frome?

Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Frome, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,410 kWh a year here, which is what drives payback.

Which DNO covers Frome, and what does it need from me?

Scottish and Southern Electricity Networks (SSEN) covers Frome. A home system of up to 3.68kW per phase is notified to SSEN within 28 days of commissioning under G98, and nothing waits on approval. Larger outputs need a G99 application before work starts. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW.

What could I earn from exporting in Frome?

On the 12p export scenario, a 12-panel system in Frome sends about 5,474 kWh a year to the grid, worth around £657. The export rates table compares what each supplier pays.

How much solar does Frome get in December?

December is the low point: about 210 kWh from a 12-panel system in Frome, on PVGIS data, rising to 800 kWh in July. From November to February the same system makes about 1,070 kWh in total, which is why a battery charged off-peak does more of the work in winter.

How Frome compares with its neighbours

The six closest towns we publish, run through the identical PVGIS query as Frome.

TownkWh per kWp a yearvs Frome
Frome1,008this town
Westbury1,029+21 kWh
Warminster1,031+23 kWh
Radstock1,003−5 kWh
Trowbridge1,022+14 kWh
Midsomer Norton1,005−3 kWh
Bradford-on-Avon1,020+12 kWh

Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.

Also for Frome: Solar panels in Frome from OVO Solar & Battery

All of Somerset

Instant estimate

See a number before you speak to anyone

Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.

Free, no obligation

Get my free quote

Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.

Installations can only go ahead for homeowners, as the system is fixed to the property. Do carry on if you own it, or you are about to.
Flats and apartments usually share a roof, which rules most installations out. Send your details anyway and we will tell you honestly what is possible.
1 Where is your home?
Please add your full postcode
Please add your house number
2 About you
Please add your first name
Please add your last name
Please add a UK number
Please add a valid email
3 Your property
Do you own your home?
Please let us know
Property type
Please choose your property type
4 What are you after?
Please pick one, "not sure" is fine
Roughly is fine
Please choose a timeframe
5 When shall we call?
Best time for you (optional, but it helps)

We never call after 8pm.

We call or text within one working day to book your free 30-minute video design call. Free, no obligation, wherever you are in Frome. No home visit needed.

Your design call is with Niall or Vince, our residential energy consultants.

Call 07782 219224

By submitting you agree we can contact you about your enquiry. We never sell your details and never pass them to a panel of companies to ring you. See our privacy notice.