0% VAT on solar panels and batteries ends 31 March 2027. What it means for you

07782 219224

Banffshire

Solar panels in Buckie, designed on a free call.

A 12-panel roof in Buckie makes about 5,430 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.

Get my free quote

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation. We call or text within one working day.

Your design call is with Niall or Vince, our residential energy consultants.

or call 07782 219224

  • Free 30-minute video design call
  • Priced before anyone visits
  • Installed by our MCS-certified, fully insured teams
Sunlight in Buckie

Sunlight in Buckie, in numbers

PVGIS puts Buckie at 853 kWh per kWp a year, 4% above our Banffshire county estimate. 72% of it arrives between April and September, peaking in May.

Map showing Buckie in Banffshire A simplified outline map of Banffshire with neighbouring counties shown faintly, and a pin marking the location of Buckie.
Buckie in Banffshire

Generation per kWp, month by month

Buckie, 853 kWh per kWp a year
Buckie, monthly generation per kWp Bar chart, twelve months January to December. Peak May at 120 kWh/kWp. Lowest December at 17.4 kWh/kWp. Full values are in the table below this chart. 138 0 JFMAMJJASOND 120
Show the monthly figures
Buckie, monthly generation per kWp - monthly figures (kWh/kWp)
MonthkWh/kWp
January23.2
February42.1
March73.3
April104
May120
June108
July111
August94.9
September78.3
October51.6
November29.3
December17.4

Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.

5,430kWh a year, 12 panels
760kWh in May, the peak
110kWh in December

For scale: 853 kWh per kWp in Buckie against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Buckie 8% below it.

How Buckie compares

Small towns rarely get published solar figures, so here are the numbers for Buckie. It is the only Banffshire town we track so far, with county rankings to follow as its neighbours land, a town of 8,974 people in the House of Commons Library settlement data. PVGIS gives its roofs 853 kWh per kWp a year, 2.34 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £786 of year one benefit, £247 of it from your own generation and £539 from export at 12p.

Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on Buckie's own yield.

Planning applications here go through Moray; nationally, the House of Commons Library classes Buckie as a small town.

12 panels
530W panels. Most semi-detached roofs take 10 to 16 on one pitch.
Add a battery?
Installed prices. The named packages are the ones running on our current offers; the Duracell prices are for an installation alongside solar.
Electricity use
Export rate scenario
EV charger?
Estimated benefit, year one
£785
£65 a month · payback 8.1 yrs
System price, installed
£6,360
Simple payback
8.1 yrs
Generates a year
5,425 kWh
Exported
4,488 kWh at 12p
Where the money comes from
Solar you use, Export income, Off-peak shifting,

Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.

Price this for your roof

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation, nobody visits your home. Prefer to talk? 07782 219224

Your design call is with Niall or Vince, our residential energy consultants.

Generation is modelled from PVGIS satellite data for Buckie's own coordinates (57.67634, -2.96489), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.

Local grid

The network operator for Buckie

Scottish and Southern Electricity Networks (SSEN) owns and runs the local electricity network in Buckie, as part of its North Scotland licence area.

What decides the paperwork is the inverter and battery output, not the number of panels. Up to 3.68kW per phase, a system follows G98: SSEN is notified within 28 days of commissioning and nothing has to be approved first.

Above that, G99 means applying before the work is booked. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW.

Sources: NESO DNO licence areas (3 May 2024); SSEN, micro-generation connections page, checked 25 September 2026. G98 vs G99, explained.

Aerial view of a residential UK street where several homes have black solar panels fitted to rear roof pitches
Several homes on the same street, all now fitted with solar.
Beyond solar

Beyond the panels: heating and car charging in Buckie

A heat pump in Buckie

In December, the darkest month here, 12 panels in Buckie make about 110 kWh. That is when a heat pump runs hardest, so its running cost in Buckie comes down to the tariff and the flow temperature rather than the roof.

In Scotland, Home Energy Scotland offers a grant of up to £7,500 towards a heat pump, an optional interest-free loan of up to £7,500 on top, and £1,500 more for rural and island homes (Home Energy Scotland, checked 28 September 2026).

How heat pumps work

Charging an EV in Buckie

Buckie's May output, about 760 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.

The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).

EV charging explained

FAQs

Solar in Buckie: your questions answered

How much electricity do solar panels make in Buckie?

About 5,430 kWh a year from 12 panels (6.36 kWp), on PVGIS satellite data for Buckie: 853 kWh per kWp, or 2.34 peak sun hours a day on average. May is the strongest month, at about 760 kWh.

Is solar more expensive in Buckie?

Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Buckie, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 5,430 kWh a year here, which is what drives payback.

Which DNO covers Buckie, and what does it need from me?

Scottish and Southern Electricity Networks (SSEN) covers Buckie. A home system of up to 3.68kW per phase is notified to SSEN within 28 days of commissioning under G98, and nothing waits on approval. Larger outputs need a G99 application before work starts. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW.

What could I earn from exporting in Buckie?

On the 12p export scenario, a 12-panel system in Buckie sends about 4,488 kWh a year to the grid, worth around £539. The export rates table compares what each supplier pays.

How much solar does Buckie get in December?

December is the low point: about 110 kWh from a 12-panel system in Buckie, on PVGIS data, rising to 760 kWh in May. From November to February the same system makes about 710 kWh in total, which is why a battery charged off-peak does more of the work in winter.

How Buckie compares with its neighbours

Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.

TownkWh per kWp a yearvs Buckie
Buckie853this town
Elgin873+20 kWh
Forres840−13 kWh
Nairn845−8 kWh
Inverurie883+30 kWh
Fraserburgh910+57 kWh
Ellon919+66 kWh

Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.

Also for Buckie: Solar panels in Buckie from OVO Solar & Battery

All of Banffshire

Instant estimate

See a number before you speak to anyone

Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.

Free, no obligation

Get my free quote

Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.

Installations can only go ahead for homeowners, as the system is fixed to the property. Do carry on if you own it, or you are about to.
Flats and apartments usually share a roof, which rules most installations out. Send your details anyway and we will tell you honestly what is possible.
1 Where is your home?
Please add your full postcode
Please add your house number
2 About you
Please add your first name
Please add your last name
Please add a UK number
Please add a valid email
3 Your property
Do you own your home?
Please let us know
Property type
Please choose your property type
4 What are you after?
Please pick one, "not sure" is fine
Roughly is fine
Please choose a timeframe
5 When shall we call?
Best time for you (optional, but it helps)

We never call after 8pm.

We call or text within one working day to book your free 30-minute video design call. Free, no obligation, wherever you are in Buckie. No home visit needed.

Your design call is with Niall or Vince, our residential energy consultants.

Call 07782 219224

By submitting you agree we can contact you about your enquiry. We never sell your details and never pass them to a panel of companies to ring you. See our privacy notice.