Solar panels in Camberley, sized to your roof.
A 12-panel roof in Camberley makes about 6,480 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Camberley's solar year
From 37 kWh per kWp in December to 125.1 in July: a roof in Camberley makes 3.4 times as much in its best month as in its darkest, and 1,019 kWh per kWp across the year.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 40.1 |
| February | 52.4 |
| March | 86.7 |
| April | 114 |
| May | 122 |
| June | 123 |
| July | 125 |
| August | 111 |
| September | 95.5 |
| October | 66.3 |
| November | 46.2 |
| December | 37 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 1,019, Camberley is 10% above it.
How Camberley compares
Among the places we publish figures for, Camberley is one of 47 Surrey towns we track, and it ranks joint 33rd of 47 for solar yield. It is a medium town in the House of Commons Library classification, with 38,270 residents, and its roofs see 2.79 peak sun hours a day across the year. That drives the standard 12 panel model to 6,481 kWh of generation, of which around 5,544 kWh is exported at 12p for £665 a year, with £247 saved on electricity you would otherwise buy at 26.32p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Camberley's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Surrey Heath is the planning authority covering Camberley, which the House of Commons Library classes as a medium town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Generation is modelled from PVGIS satellite data for Camberley's own coordinates (51.33449, -0.73273), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.
Who runs the grid in Camberley
Camberley sits in Scottish and Southern Electricity Networks' Southern England licence area, so SSEN is the network operator (DNO) any solar panels or battery here are registered with.
G98 is the simple route. If the inverter, plus any battery, stays at or under 3.68kW per phase, SSEN only has to be told within 28 days after the system is commissioned.
Anything bigger is a G99 case and is applied for first. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW.
Sources: NESO DNO licence areas (3 May 2024); SSEN, micro-generation connections page, checked 25 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Camberley
A heat pump in Camberley
A heat pump does most of its work from November to February. Over those four months, 12 panels in Camberley make about 1,120 kWh, against 3,060 kWh from May to August, so winter heating runs mostly on grid electricity and the tariff matters more than the roof.
The Boiler Upgrade Scheme, open in England and Wales, takes £7,500 off an air source or ground source heat pump, or £2,500 off an air-to-air unit. Homes on oil or LPG with no mains gas get £1,500 more until March 2027 (gov.uk, checked 28 September 2026).
Charging an EV in Camberley
A 12-panel roof in Camberley makes about 800 kWh in July. A typical home uses around 70 kWh of that in daylight (the calculator's typical-use settings), which leaves most of the month's output for an EV or for export.
Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.
Installed prices, the same in every town
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Camberley
Faults, servicing and ageing inverters follow the same economics in Camberley as anywhere else, and the guides below price them plainly.
Camberley solar questions
What does a solar panel system produce in Camberley?
Each kWp of panels in Camberley makes 1,019 kWh a year on PVGIS figures, so a typical 12-panel system produces around 6,480 kWh, from about 240 kWh in December up to 800 kWh in July.
How much are solar panels in Camberley?
The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in Camberley before a battery. What Camberley changes is the return, about 6,480 kWh a year from that system, and your design call prices your actual roof.
Would a system in Camberley need approval from the network operator?
Camberley is on Scottish and Southern Electricity Networks' network (Southern England licence area). Systems up to 3.68kW per phase of inverter output follow G98: SSEN is notified within 28 days of commissioning, with no approval needed first. Anything larger needs a G99 application before installation. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW. Our G98 vs G99 guide explains both routes.
How much can I earn from exporting solar in Camberley?
With typical use and no battery, a 12-panel system in Camberley exports about 5,544 kWh a year. At 12p per kWh that is roughly £665; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.
Is solar worth it in Camberley in winter?
It works, but the year is lopsided. 68% of a Camberley roof's output lands between April and September; the four months from November to February give about 1,120 kWh on a 12-panel system. Payback is worked out on the whole year, not the winter.
How Camberley compares with its neighbours
How the towns nearest Camberley compare on the same PVGIS settings, closest first.
| Town | kWh per kWp a year | vs Camberley |
|---|---|---|
| Camberley | 1,019 | this town |
| Frimley | 1,018 | −1 kWh |
| Sandhurst | 1,016 | −3 kWh |
| Farnborough | 1,022 | +3 kWh |
| Crowthorne | 1,017 | −2 kWh |
| Yateley | 1,017 | −2 kWh |
| West End and Chobham | 1,025 | +6 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
Also for Camberley: Solar panels in Camberley from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Camberley homeowners
Sourced, dated and written by us. The same ground we cover on your free call.
Are solar panels worth it in 2026? Here is the actual maths
Roughly £1,000 per kWp installed, offsetting electricity at 26.32p a unit. The real arithmetic.
Read the guide →Sigenergy SigenStor review: the 5-in-1 tower examined
The 5-in-1 tower reviewed by a site that does not sell it, warranty arithmetic included.
Read the guide →How solar aware EV charging actually works
The CT clamp, the surplus tracking and the 1.4kW floor that catches people out.
Read the guide →Sizing a heat pump: what a proper survey covers
Sized by calculation, not by rule of thumb. What the survey covers, and what guessing costs.
Read the guide →Will energy prices keep rising, and by how much
The January forecasts jumped fast. What is confirmed, what is guessed, and whether solar is a real hedge.
Read the guide →G98 or G99: which one applies, what the application involves, and how long it takes
The G98 line sits at 3.68kW per phase. Above it, your network operator has to say yes first.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.