Solar panels in Connah's Quay, sized to your roof.
Twelve panels (6.36 kWp) here make about 6,150 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Connah's Quay's solar year
PVGIS puts Connah's Quay at 967 kWh per kWp a year, 5% above our Flintshire county estimate. 69% of it arrives between April and September, peaking in May.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 34 |
| February | 52.7 |
| March | 85.2 |
| April | 111 |
| May | 124 |
| June | 118 |
| July | 117 |
| August | 106 |
| September | 88.7 |
| October | 59.4 |
| November | 40 |
| December | 32 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Against Great Britain as a whole: Connah's Quay makes 967 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so Connah's Quay is 5% above it.
How Connah's Quay compares
Small towns rarely get published solar figures, so here are the numbers for Connah's Quay. It is one of 8 Flintshire towns we track, and it ranks 2nd of 8 for solar yield, a town of 16,667 people in the House of Commons Library settlement data. PVGIS gives its roofs 967 kWh per kWp a year, 2.65 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £873 of year one benefit, £247 of it from your own generation and £626 from export at 12p.
These are starting numbers, not a quote. The calculator below opens on Connah's Quay's own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.
Flintshire is the planning authority covering Connah's Quay, which the House of Commons Library classes as a small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
The figures use PVGIS for the centre of Connah's Quay (53.2207, -3.06193), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.
Who runs the grid in Connah's Quay
The distribution network operator (DNO) for Connah's Quay is SP Energy Networks, which runs the North Wales, Merseyside and Cheshire licence area.
For a typical home the paperwork is light: a system of up to 3.68kW per phase goes through G98, which means SP Energy Networks is notified within 28 days of switch-on rather than asked beforehand.
Anything bigger is a G99 case and is applied for first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Adding a heat pump or an EV charger in Connah's Quay
A heat pump in Connah's Quay
A heat pump does most of its work from November to February. Over those four months, 12 panels in Connah's Quay make about 1,010 kWh, against 2,950 kWh from May to August, so winter heating runs mostly on grid electricity and the tariff matters more than the roof.
Grant support in Wales comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).
Charging an EV in Connah's Quay
A 12-panel roof in Connah's Quay makes about 790 kWh in May. A typical home uses around 70 kWh of that in daylight (the calculator's typical-use settings), which leaves most of the month's output for an EV or for export.
The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Connah's Quay
Faults, servicing and ageing inverters follow the same economics in Connah's Quay as anywhere else, and the guides below price them plainly.
Common questions about solar in Connah's Quay
What does a solar panel system produce in Connah's Quay?
Each kWp of panels in Connah's Quay makes 967 kWh a year on PVGIS figures, so a typical 12-panel system produces around 6,150 kWh, from about 200 kWh in December up to 790 kWh in May.
How much are solar panels in Connah's Quay?
The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in Connah's Quay before a battery. What Connah's Quay changes is the return, about 6,150 kWh a year from that system, and your design call prices your actual roof.
Would a system in Connah's Quay need approval from the network operator?
Connah's Quay is on SP Energy Networks' network (North Wales, Merseyside and Cheshire licence area). Systems up to 3.68kW per phase of inverter output follow G98: SP Energy Networks is notified within 28 days of commissioning, with no approval needed first. Anything larger needs a G99 application before installation. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator. Our G98 vs G99 guide explains both routes.
How much can I earn from exporting solar in Connah's Quay?
With typical use and no battery, a 12-panel system in Connah's Quay exports about 5,213 kWh a year. At 12p per kWh that is roughly £626; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.
Is solar worth it in Connah's Quay in winter?
It works, but the year is lopsided. 69% of a Connah's Quay roof's output lands between April and September; the four months from November to February give about 1,010 kWh on a 12-panel system. Payback is worked out on the whole year, not the winter.
How Connah's Quay compares with its neighbours
How the towns nearest Connah's Quay compare on the same PVGIS settings, closest first.
| Town | kWh per kWp a year | vs Connah's Quay |
|---|---|---|
| Connah's Quay | 967 | this town |
| Hawarden | 962 | −5 kWh |
| Flint | 962 | −5 kWh |
| Buckley | 958 | −9 kWh |
| Neston | 969 | +2 kWh |
| Mold | 944 | −23 kWh |
| Chester | 948 | −19 kWh |
PVGIS v5.2 for each town centroid, identical assumptions throughout. A few kWh either way is weather-year noise; a spread beyond about 30 kWh per kWp is real geography.
Also for Connah's Quay: Solar panels in Connah's Quay from OVO Solar & Battery
Also near Connah's Quay
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Connah's Quay homeowners
Sourced, dated and written by us. The same ground we cover on your free call.
Back contact solar panels, explained for a UK roof
What back contact changes on a roof, compared fairly with TOPCon, with the makers' own claims labelled.
Read the guide →Sigenergy SigenStor review: the 5-in-1 tower examined
The 5-in-1 tower reviewed by a site that does not sell it, warranty arithmetic included.
Read the guide →What it really costs to charge an EV at home versus in public
Home off-peak charging costs a fraction of the public price. The arithmetic, and the tariff it depends on.
Read the guide →How much does a heat pump cost? The 2026 numbers, before and after the grant
UK median installed cost around £12,908, before the up to £7,500 grant comes off.
Read the guide →EV tariffs compared: the cheapest overnight windows
Overnight rates of 6.99p to 9p against a 26.32p capped average, compared.
Read the guide →What MCS certification actually is, and why your export payments depend on it
The badge that decides whether your solar earns export payments. It cannot be added later.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.