Solar panels in Exmouth, with the numbers shown.
Twelve panels (6.36 kWp) here make about 6,750 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Exmouth's solar year
From 37.1 kWh per kWp in December to 130.2 in May: a roof in Exmouth makes 3.5 times as much in its best month as in its darkest, and 1,062 kWh per kWp across the year.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 39.6 |
| February | 56.6 |
| March | 92.1 |
| April | 121 |
| May | 130 |
| June | 128 |
| July | 130 |
| August | 116 |
| September | 99.1 |
| October | 67.1 |
| November | 45.8 |
| December | 37.1 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
For scale: 1,062 kWh per kWp in Exmouth against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Exmouth 15% above it.
How Exmouth compares
Among the places we publish figures for, Exmouth is one of 23 Devon towns we track, and it ranks 9th of 23 for solar yield. It is a medium town in the House of Commons Library classification, with 36,204 residents, and its roofs see 2.91 peak sun hours a day across the year. That drives the standard 12 panel model to 6,754 kWh of generation, of which around 5,818 kWh is exported at 12p for £698 a year, with £247 saved on electricity you would otherwise buy at 26.32p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Exmouth's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
East Devon is the planning authority covering Exmouth, which the House of Commons Library classes as a medium town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Generation is modelled from PVGIS satellite data for Exmouth's own coordinates (50.62773, -3.39445), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.
Who runs the grid in Exmouth
The distribution network operator (DNO) for Exmouth is National Grid Electricity Distribution (NGED), which runs the South West England licence area.
For a typical home the paperwork is light: a system of up to 3.68kW per phase goes through G98, which means NGED is notified within 28 days of switch-on rather than asked beforehand.
Anything bigger is a G99 case and is applied for first. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.
Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Exmouth
A heat pump in Exmouth
A heat pump does most of its work from November to February. Over those four months, 12 panels in Exmouth make about 1,140 kWh, against 3,200 kWh from May to August, so winter heating runs mostly on grid electricity and the tariff matters more than the roof.
The Boiler Upgrade Scheme, open in England and Wales, takes £7,500 off an air source or ground source heat pump, or £2,500 off an air-to-air unit. Homes on oil or LPG with no mains gas get £1,500 more until March 2027 (gov.uk, checked 28 September 2026).
Charging an EV in Exmouth
From April to September, 68% of a Exmouth roof's yearly output arrives, peaking at about 830 kWh in May on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.
Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Exmouth
Faults, servicing and ageing inverters follow the same economics in Exmouth as anywhere else, and the guides below price them plainly.
Solar in Exmouth: your questions answered
What does a solar panel system produce in Exmouth?
Each kWp of panels in Exmouth makes 1,062 kWh a year on PVGIS figures, so a typical 12-panel system produces around 6,750 kWh, from about 240 kWh in December up to 830 kWh in May.
What would 12 solar panels cost in Exmouth?
£6,360 for 12 panels (6.36 kWp), the same as in every other place we cover, because solar is priced at £1,000 per kWp installed rather than by area. A battery adds its own installed price on top. Where Exmouth differs is output: about 6,750 kWh a year from that system.
Would a system in Exmouth need approval from the network operator?
Exmouth is on National Grid Electricity Distribution's network (South West England licence area). Systems up to 3.68kW per phase of inverter output follow G98: NGED is notified within 28 days of commissioning, with no approval needed first. Anything larger needs a G99 application before installation. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late. Our G98 vs G99 guide explains both routes.
How much would export pay on a system in Exmouth?
It is exported. With typical use and no battery, about 5,818 kWh of the 6,750 kWh a 12-panel system makes in Exmouth goes to the grid, around £698 a year at 12p. A battery keeps more of it for the evening; the export rates table shows what suppliers pay.
Is solar worth it in Exmouth in winter?
It works, but the year is lopsided. 68% of a Exmouth roof's output lands between April and September; the four months from November to February give about 1,140 kWh on a 12-panel system. Payback is worked out on the whole year, not the winter.
How Exmouth compares with its neighbours
How the towns nearest Exmouth compare on the same PVGIS settings, closest first.
| Town | kWh per kWp a year | vs Exmouth |
|---|---|---|
| Exmouth | 1,062 | this town |
| Dawlish | 1,044 | −18 kWh |
| Teignmouth | 1,032 | −30 kWh |
| Sidmouth | 1,080 | +18 kWh |
| Exeter | 1,060 | −2 kWh |
| Kingsteignton | 1,063 | +1 kWh |
| Newton Abbot | 1,051 | −11 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
Also for Exmouth: Solar panels in Exmouth from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Exmouth homeowners
Sourced, dated and written by us. The same ground we cover on your free call.
How long does a solar inverter last, and when does replacing it make sense?
The one component you should expect to replace, and the decision tree when it goes.
Read the guide →Inside a home battery: capacity, power and losses
Usable capacity, kW output, round trip losses and chemistry, in plain terms.
Read the guide →What it really costs to charge an EV at home versus in public
Home off-peak charging costs a fraction of the public price. The arithmetic, and the tariff it depends on.
Read the guide →Are air source heat pumps any good? What owners actually report
The UK's largest survey found 80% of heat pump owners satisfied, against 70% for gas boilers.
Read the guide →Which tariffs are actually built for battery charging
A battery buys cheap and uses dear. The tariff decides how much that is worth.
Read the guide →Your MCS certificate: what it shows, when it arrives, and how a Smart Export Guarantee supplier uses it
The document your export payments hang on. Who issues it, what it shows, and how to get a copy.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.