0% VAT on solar panels and batteries ends 31 March 2027. What it means for you

07782 219224

Lanarkshire

Solar panels in Glasgow, with the numbers shown.

Twelve panels (6.36 kWp) here make about 5,430 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.

Get my free quote

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation. We call or text within one working day.

Your design call is with Niall or Vince, our residential energy consultants.

or call 07782 219224

  • Free 30-minute video design call
  • Priced before anyone visits
  • Installed by our MCS-certified, fully insured teams
Sunlight in Glasgow

Glasgow's solar year

Glasgow's best month is May, at 119 kWh per kWp; December manages 19.1. Over the year that comes to 854 kWh per kWp, 1% above our Lanarkshire county estimate.

Map showing Glasgow in Lanarkshire A simplified outline map of Lanarkshire with neighbouring counties shown faintly, and a pin marking the location of Glasgow.
Glasgow in Lanarkshire

Generation per kWp, month by month

Glasgow, 854 kWh per kWp a year
Glasgow, monthly generation per kWp Bar chart, twelve months January to December. Peak May at 119 kWh/kWp. Lowest December at 19.1 kWh/kWp. Full values are in the table below this chart. 137 0 JFMAMJJASOND 119
Show the monthly figures
Glasgow, monthly generation per kWp - monthly figures (kWh/kWp)
MonthkWh/kWp
January22.4
February42.5
March70.9
April103
May119
June110
July111
August96
September75.3
October52.8
November33.4
December19.1

Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.

5,430kWh a year, 12 panels
760kWh in May, the peak
120kWh in December

Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 854, Glasgow is 8% below it.

How Glasgow compares

Glasgow is one of 18 Lanarkshire towns we track, and it ranks joint 10th of 18 for solar yield. The House of Commons Library settlement classification puts it in the core city class, with a population of 634,814, which makes it one of the largest places we publish figures for. Scale changes nothing about the physics: PVGIS gives a roof here 854 kWh per kWp a year, 2.34 peak sun hours a day averaged across the seasons, and on the 12p scenario about £247 of the year one benefit comes from solar you use yourself, with export income adding £539.

These are starting numbers, not a quote. The calculator below opens on Glasgow's own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.

Glasgow City is the planning authority covering Glasgow, which the House of Commons Library classes as a core city.

12 panels
530W panels. Most semi-detached roofs take 10 to 16 on one pitch.
Add a battery?
Installed prices. The named packages are the ones running on our current offers; the Duracell prices are for an installation alongside solar.
Electricity use
Export rate scenario
EV charger?
Estimated benefit, year one
£786
£65 a month · payback 8.1 yrs
System price, installed
£6,360
Simple payback
8.1 yrs
Generates a year
5,431 kWh
Exported
4,495 kWh at 12p
Where the money comes from
Solar you use, Export income, Off-peak shifting,

Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.

Price this for your roof

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation, nobody visits your home. Prefer to talk? 07782 219224

Your design call is with Niall or Vince, our residential energy consultants.

Modelled for Glasgow at 55.86363, -4.23688 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.

Local grid

Who runs the grid in Glasgow

The distribution network operator (DNO) for Glasgow is SP Energy Networks, which runs the South and Central Scotland licence area.

G98 is the simple route. If the inverter, plus any battery, stays at or under 3.68kW per phase, SP Energy Networks only has to be told within 28 days after the system is commissioned.

A bigger inverter or battery output needs a G99 application in advance. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator.

Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Aerial view of a flat-roof garden building with a black solar panel array, on a residential street
A flat-roof garden building fitted with its own solar array.
Beyond solar

Heat pumps and EV charging in Glasgow

A heat pump in Glasgow

A heat pump does most of its work from November to February. Over those four months, 12 panels in Glasgow make about 750 kWh, against 2,770 kWh from May to August, so winter heating runs mostly on grid electricity and the tariff matters more than the roof.

Scottish homes apply through Home Energy Scotland rather than the Boiler Upgrade Scheme: up to £7,500 in grant for a heat pump, up to £7,500 more as an optional interest-free loan, and a £1,500 uplift for rural and island homes (checked 28 September 2026).

How heat pumps work

Charging an EV in Glasgow

From April to September, 72% of a Glasgow roof's yearly output arrives, peaking at about 760 kWh in May on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.

If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.

EV charging explained

Local detail

What else is true of Glasgow

Around 73% of Glasgow's homes are flats, a reflection of the city's tenement-dominated built form, and the council's Local Housing Strategy counts close to 76,000 pre-1919 homes across the city, some 70,000 of them tenement flats. That concentration means a large share of Glasgow roofs are shared between several flats in one block rather than belonging to a single household, which is a real factor in how straightforward adding solar is to arrange before any roof-size question comes into it.

Glasgow sits in SP Energy Networks territory. SP Energy Networks does not publish its own day count for a standard low voltage generation quotation, so the 45 working day standard that applies across the industry is the figure to plan against, with most single home systems using the quicker 28-day G98 route instead. Glasgow City Council is the planning authority and lists 25 conservation areas, from the city centre and Victorian suburbs to a rural village and a former country estate.

The council's Climate Plan targets net zero carbon emissions for the city by 2030, following its 2019 declaration of a Climate and Ecological Emergency. It already runs 33 solar arrays on its own rooftops, and has earmarked landmark buildings including Kelvin Hall, Emirates Arena and the Royal Concert Hall for a further scheme expected to save around £750,000 a year in energy costs.

Planning authority: Glasgow City Council

Sources: glasgow.gov.uk · glasgow.gov.uk

Already got panels?

Solar panel servicing and repair in Glasgow

Faults, servicing and ageing inverters follow the same economics in Glasgow as anywhere else, and the guides below price them plainly.

FAQs

Glasgow solar questions

What does a solar panel system produce in Glasgow?

Each kWp of panels in Glasgow makes 854 kWh a year on PVGIS figures, so a typical 12-panel system produces around 5,430 kWh, from about 120 kWh in December up to 760 kWh in May.

How much are solar panels in Glasgow?

The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in Glasgow before a battery. What Glasgow changes is the return, about 5,430 kWh a year from that system, and your design call prices your actual roof.

Would a system in Glasgow need approval from the network operator?

Glasgow is on SP Energy Networks' network (South and Central Scotland licence area). Systems up to 3.68kW per phase of inverter output follow G98: SP Energy Networks is notified within 28 days of commissioning, with no approval needed first. Anything larger needs a G99 application before installation. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator. Our G98 vs G99 guide explains both routes.

How much can I earn from exporting solar in Glasgow?

With typical use and no battery, a 12-panel system in Glasgow exports about 4,495 kWh a year. At 12p per kWh that is roughly £539; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.

Is solar worth it in Glasgow in winter?

It works, but the year is lopsided. 72% of a Glasgow roof's output lands between April and September; the four months from November to February give about 750 kWh on a 12-panel system. Payback is worked out on the whole year, not the winter.

How Glasgow compares with its neighbours

How the towns nearest Glasgow compare on the same PVGIS settings, closest first.

TownkWh per kWp a yearvs Glasgow
Glasgow854this town
Rutherglen856+2 kWh
Bishopbriggs854level
Cambuslang863+9 kWh
Bearsden851−3 kWh
Renfrew860+6 kWh
Milngavie852−2 kWh

Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.

Also for Glasgow: Solar panels in Glasgow from OVO Solar & Battery

All of Lanarkshire

Instant estimate

See a number before you speak to anyone

Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.

Free, no obligation

Get my free quote

Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.

Installations can only go ahead for homeowners, as the system is fixed to the property. Do carry on if you own it, or you are about to.
Flats and apartments usually share a roof, which rules most installations out. Send your details anyway and we will tell you honestly what is possible.
1 Where is your home?
Please add your full postcode
Please add your house number
2 About you
Please add your first name
Please add your last name
Please add a UK number
Please add a valid email
3 Your property
Do you own your home?
Please let us know
Property type
Please choose your property type
4 What are you after?
Please pick one, "not sure" is fine
Roughly is fine
Please choose a timeframe
5 When shall we call?
Best time for you (optional, but it helps)

We never call after 8pm.

We call or text within one working day to book your free 30-minute video design call. Free, no obligation, wherever you are in Glasgow. No home visit needed.

Your design call is with Niall or Vince, our residential energy consultants.

Call 07782 219224

By submitting you agree we can contact you about your enquiry. We never sell your details and never pass them to a panel of companies to ring you. See our privacy notice.