Solar panels in Great Wyrley and Cheslyn Hay.
Twelve panels here make about 6,060 kWh a year for £6,360 installed, designed on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
What a roof in Great Wyrley and Cheslyn Hay can generate
PVGIS puts Great Wyrley and Cheslyn Hay at 953 kWh per kWp a year, level with our Staffordshire county estimate. 68% of it arrives between April and September, peaking in May.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 34.5 |
| February | 50.3 |
| March | 84 |
| April | 107 |
| May | 118 |
| June | 114 |
| July | 117 |
| August | 104 |
| September | 88.9 |
| October | 60.4 |
| November | 41.8 |
| December | 33.5 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Against Great Britain as a whole: Great Wyrley and Cheslyn Hay makes 953 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so Great Wyrley and Cheslyn Hay is 3% above it.
How Great Wyrley and Cheslyn Hay compares
Small towns rarely get published solar figures, so here are the numbers for Great Wyrley and Cheslyn Hay. It is one of 44 Staffordshire towns we track, and it ranks joint 29th of 44 for solar yield, a town of 18,138 people in the House of Commons Library settlement data. PVGIS gives its roofs 953 kWh per kWp a year, 2.61 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £862 of year one benefit, £247 of it from your own generation and £615 from export at 12p.
These are starting numbers, not a quote. The calculator below opens on Great Wyrley and Cheslyn Hay's own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.
Great Wyrley and Cheslyn Hay sits within South Staffordshire, its local planning authority, and the House of Commons Library classes it as a small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Generation is modelled from PVGIS satellite data for Great Wyrley and Cheslyn Hay's own coordinates (52.6605, -2.02403), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.
Connecting solar to the Great Wyrley and Cheslyn Hay network
On NESO's licence-area map, Great Wyrley and Cheslyn Hay is in West Midlands, which National Grid Electricity Distribution (NGED) operates. That makes NGED the network operator for any system fitted here.
Below 3.68kW per phase of inverter and battery output, the G98 route applies: the installation is notified to NGED within 28 days of commissioning, with no prior approval.
A bigger inverter or battery output needs a G99 application in advance. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.
Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Adding a heat pump or an EV charger in Great Wyrley and Cheslyn Hay
A heat pump in Great Wyrley and Cheslyn Hay
Solar and a heat pump pull in opposite directions through the year: Great Wyrley and Cheslyn Hay's roofs make 1,020 kWh from November to February on a 12-panel system, and 2,880 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.
Grant support in England comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).
Charging an EV in Great Wyrley and Cheslyn Hay
A 12-panel roof in Great Wyrley and Cheslyn Hay makes about 750 kWh in May. A typical home uses around 70 kWh of that in daylight (the calculator's typical-use settings), which leaves most of the month's output for an EV or for export.
The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).
The packages, priced before anyone visits
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Great Wyrley and Cheslyn Hay
Guidance is nationwide, so the benchmarks hold in Great Wyrley and Cheslyn Hay: repair costs, service scope, and when the inverter is the real fault.
Great Wyrley and Cheslyn Hay solar questions
What could a roof in Great Wyrley and Cheslyn Hay generate?
PVGIS puts a roof in Great Wyrley and Cheslyn Hay at 953 kWh per kWp a year, 2.61 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 6,060 kWh a year, most of it between April and September.
What would 12 solar panels cost in Great Wyrley and Cheslyn Hay?
£6,360 for 12 panels (6.36 kWp), the same as in every other place we cover, because solar is priced at £1,000 per kWp installed rather than by area. A battery adds its own installed price on top. Where Great Wyrley and Cheslyn Hay differs is output: about 6,060 kWh a year from that system.
Do I need permission from the DNO for solar in Great Wyrley and Cheslyn Hay?
Usually not in advance. NGED, the network operator for Great Wyrley and Cheslyn Hay, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late. "See our DNO explainer.
How much would export pay on a system in Great Wyrley and Cheslyn Hay?
It is exported. With typical use and no battery, about 5,124 kWh of the 6,060 kWh a 12-panel system makes in Great Wyrley and Cheslyn Hay goes to the grid, around £615 a year at 12p. A battery keeps more of it for the evening; the export rates table shows what suppliers pay.
Do solar panels work in winter in Great Wyrley and Cheslyn Hay?
Yes, at a lower level. PVGIS gives Great Wyrley and Cheslyn Hay 33.5 kWh per kWp in December and 34.5 in January, so a 12-panel system makes about 210 kWh and 220 kWh in those months, against 750 kWh in May. Winter output mostly covers daytime use rather than exporting.
How Great Wyrley and Cheslyn Hay compares with its neighbours
How the towns nearest Great Wyrley and Cheslyn Hay compare on the same PVGIS settings, closest first.
| Town | kWh per kWp a year | vs Great Wyrley and Cheslyn Hay |
|---|---|---|
| Great Wyrley and Cheslyn Hay | 953 | this town |
| Norton Canes | 957 | +4 kWh |
| Cannock | 954 | +1 kWh |
| Pelsall | 958 | +5 kWh |
| Bloxwich | 958 | +5 kWh |
| Brownhills | 957 | +4 kWh |
| Rushall and Shelfield | 958 | +5 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Great Wyrley and Cheslyn Hay homeowners
Sourced, dated and written by us. The same ground we cover on your free call.
How long does a solar inverter last, and when does replacing it make sense?
The one component you should expect to replace, and the decision tree when it goes.
Read the guide →Does a standalone battery actually pay back?
No panels means one job: buy cheap, use later. The tariff decides whether it pays.
Read the guide →Charging an EV from your own solar
Every surplus kWh is 3.6 to 5 miles. Whether that beats a 7p overnight rate is arithmetic.
Read the guide →Sizing a heat pump: what a proper survey covers
Sized by calculation, not by rule of thumb. What the survey covers, and what guessing costs.
Read the guide →The price cap explained, and what it does to solar payback
The cap limits unit rates, not bills. That changes what solar payback means.
Read the guide →Your MCS certificate: what it shows, when it arrives, and how a Smart Export Guarantee supplier uses it
The document your export payments hang on. Who issues it, what it shows, and how to get a copy.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.