0% VAT on solar panels and batteries ends 31 March 2027. What it means for you

07782 219224

Pembrokeshire

Solar panels in Haverfordwest, sized to your roof.

A 12-panel roof in Haverfordwest makes about 6,510 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.

Get my free quote

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation. We call or text within one working day.

Your design call is with Niall or Vince, our residential energy consultants.

or call 07782 219224

  • Free 30-minute video design call
  • Priced before anyone visits
  • Installed by our MCS-certified, fully insured teams
Sunlight in Haverfordwest

Haverfordwest's solar year

From 29.1 kWh per kWp in December to 131.6 in May: a roof in Haverfordwest makes 4.5 times as much in its best month as in its darkest, and 1,023 kWh per kWp across the year.

Map showing Haverfordwest in Pembrokeshire A simplified outline map of Pembrokeshire with neighbouring counties shown faintly, and a pin marking the location of Haverfordwest.
Haverfordwest in Pembrokeshire

Generation per kWp, month by month

Haverfordwest, 1,023 kWh per kWp a year
Haverfordwest, monthly generation per kWp Bar chart, twelve months January to December. Peak May at 132 kWh/kWp. Lowest December at 29.1 kWh/kWp. Full values are in the table below this chart. 151 0 JFMAMJJASOND 132
Show the monthly figures
Haverfordwest, monthly generation per kWp - monthly figures (kWh/kWp)
MonthkWh/kWp
January33.9
February55.8
March89.5
April121
May132
June129
July125
August112
September92.6
October62.8
November40.8
December29.1

Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.

6,510kWh a year, 12 panels
840kWh in May, the peak
190kWh in December

Against Great Britain as a whole: Haverfordwest makes 1,023 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so Haverfordwest is 11% above it.

How Haverfordwest compares

Small towns rarely get published solar figures, so here are the numbers for Haverfordwest. It is one of 4 Pembrokeshire towns we track, and it ranks 4th of 4 for solar yield, a town of 12,789 people in the House of Commons Library settlement data. PVGIS gives its roofs 1,023 kWh per kWp a year, 2.80 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £915 of year one benefit, £247 of it from your own generation and £668 from export at 12p.

These are starting numbers, not a quote. The calculator below opens on Haverfordwest's own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.

Pembrokeshire is the planning authority covering Haverfordwest, which the House of Commons Library classes as a small town.

12 panels
530W panels. Most semi-detached roofs take 10 to 16 on one pitch.
Add a battery?
Installed prices. The named packages are the ones running on our current offers; the Duracell prices are for an installation alongside solar.
Electricity use
Export rate scenario
EV charger?
Estimated benefit, year one
£915
£76 a month · payback 7.0 yrs
System price, installed
£6,360
Simple payback
7.0 yrs
Generates a year
6,506 kWh
Exported
5,570 kWh at 12p
Where the money comes from
Solar you use, Export income, Off-peak shifting,

Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.

Price this for your roof

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation, nobody visits your home. Prefer to talk? 07782 219224

Your design call is with Niall or Vince, our residential energy consultants.

Generation is modelled from PVGIS satellite data for Haverfordwest's own coordinates (51.81016, -4.97117), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.

Local grid

Who runs the grid in Haverfordwest

Haverfordwest is served by National Grid Electricity Distribution (NGED): the town's centre falls inside its South Wales licence area on NESO's boundary map.

What decides the paperwork is the inverter and battery output, not the number of panels. Up to 3.68kW per phase, a system follows G98: NGED is notified within 28 days of commissioning and nothing has to be approved first.

A bigger inverter or battery output needs a G99 application in advance. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.

Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Three Tesla Powerwall battery units mounted side by side on a rendered exterior wall
Three Tesla Powerwall units, wall-mounted and ready to go.
Beyond solar

Adding a heat pump or an EV charger in Haverfordwest

A heat pump in Haverfordwest

A heat pump does most of its work from November to February. Over those four months, 12 panels in Haverfordwest make about 1,020 kWh, against 3,160 kWh from May to August, so winter heating runs mostly on grid electricity and the tariff matters more than the roof.

Grant support in Wales comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).

How heat pumps work

Charging an EV in Haverfordwest

A 12-panel roof in Haverfordwest makes about 840 kWh in May. A typical home uses around 70 kWh of that in daylight (the calculator's typical-use settings), which leaves most of the month's output for an EV or for export.

If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.

EV charging explained

Already got panels?

Solar panel servicing and repair in Haverfordwest

Faults, servicing and ageing inverters follow the same economics in Haverfordwest as anywhere else, and the guides below price them plainly.

FAQs

Common questions about solar in Haverfordwest

What does a solar panel system produce in Haverfordwest?

Each kWp of panels in Haverfordwest makes 1,023 kWh a year on PVGIS figures, so a typical 12-panel system produces around 6,510 kWh, from about 190 kWh in December up to 840 kWh in May.

What would 12 solar panels cost in Haverfordwest?

£6,360 for 12 panels (6.36 kWp), the same as in every other place we cover, because solar is priced at £1,000 per kWp installed rather than by area. A battery adds its own installed price on top. Where Haverfordwest differs is output: about 6,510 kWh a year from that system.

Would a system in Haverfordwest need approval from the network operator?

Haverfordwest is on National Grid Electricity Distribution's network (South Wales licence area). Systems up to 3.68kW per phase of inverter output follow G98: NGED is notified within 28 days of commissioning, with no approval needed first. Anything larger needs a G99 application before installation. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late. Our G98 vs G99 guide explains both routes.

How much would export pay on a system in Haverfordwest?

It is exported. With typical use and no battery, about 5,570 kWh of the 6,510 kWh a 12-panel system makes in Haverfordwest goes to the grid, around £668 a year at 12p. A battery keeps more of it for the evening; the export rates table shows what suppliers pay.

Is solar worth it in Haverfordwest in winter?

It works, but the year is lopsided. 70% of a Haverfordwest roof's output lands between April and September; the four months from November to February give about 1,020 kWh on a 12-panel system. Payback is worked out on the whole year, not the winter.

How Haverfordwest compares with its neighbours

Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.

TownkWh per kWp a yearvs Haverfordwest
Haverfordwest1,023this town
Milford Haven1,095+72 kWh
Pembroke Dock1,080+57 kWh
Pembroke1,086+63 kWh
Carmarthen980−43 kWh
Llanelli1,064+41 kWh
Gorseinon1,040+17 kWh

Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.

Also for Haverfordwest: Solar panels in Haverfordwest from OVO Solar & Battery

All of Pembrokeshire

Also near Haverfordwest

Instant estimate

See a number before you speak to anyone

Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.

Free, no obligation

Get my free quote

Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.

Installations can only go ahead for homeowners, as the system is fixed to the property. Do carry on if you own it, or you are about to.
Flats and apartments usually share a roof, which rules most installations out. Send your details anyway and we will tell you honestly what is possible.
1 Where is your home?
Please add your full postcode
Please add your house number
2 About you
Please add your first name
Please add your last name
Please add a UK number
Please add a valid email
3 Your property
Do you own your home?
Please let us know
Property type
Please choose your property type
4 What are you after?
Please pick one, "not sure" is fine
Roughly is fine
Please choose a timeframe
5 When shall we call?
Best time for you (optional, but it helps)

We never call after 8pm.

We call or text within one working day to book your free 30-minute video design call. Free, no obligation, wherever you are in Haverfordwest. No home visit needed.

Your design call is with Niall or Vince, our residential energy consultants.

Call 07782 219224

By submitting you agree we can contact you about your enquiry. We never sell your details and never pass them to a panel of companies to ring you. See our privacy notice.