Solar panels in Havering, with the numbers shown.
Twelve panels (6.36 kWp) here make about 6,650 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Havering's solar year
From 38.4 kWh per kWp in December to 128.4 in July: a roof in Havering makes 3.3 times as much in its best month as in its darkest, and 1,045 kWh per kWp across the year.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 40.1 |
| February | 53.7 |
| March | 89.4 |
| April | 117 |
| May | 124 |
| June | 125 |
| July | 128 |
| August | 114 |
| September | 98.6 |
| October | 68.7 |
| November | 47.7 |
| December | 38.4 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
For scale: 1,045 kWh per kWp in Havering against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Havering 13% above it.
How Havering compares
Havering is one of 46 Essex towns we track, and it ranks 34th of 46 for solar yield. The House of Commons Library settlement classification puts it in the core city class, with a population of 273,656, which makes it one of the largest places we publish figures for. Scale changes nothing about the physics: PVGIS gives a roof here 1,045 kWh per kWp a year, 2.86 peak sun hours a day averaged across the seasons, and on the 12p scenario about £247 of the year one benefit comes from solar you use yourself, with export income adding £685.
Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on Havering's own yield.
Planning applications in Havering go to its own council, and the House of Commons Library classes it as a core city.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
The figures use PVGIS for the centre of Havering (51.57042, 0.20762), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.
Who runs the grid in Havering
UK Power Networks owns and runs the local electricity network in Havering, as part of its East England licence area.
For a typical home the paperwork is light: a system of up to 3.68kW per phase goes through G98, which means UK Power Networks is notified within 28 days of switch-on rather than asked beforehand.
A bigger inverter or battery output needs a G99 application in advance. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Beyond the panels: heating and car charging in Havering
A heat pump in Havering
A heat pump does most of its work from November to February. Over those four months, 12 panels in Havering make about 1,140 kWh, against 3,130 kWh from May to August, so winter heating runs mostly on grid electricity and the tariff matters more than the roof.
Grant support in England comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).
Charging an EV in Havering
From April to September, 68% of a Havering roof's yearly output arrives, peaking at about 820 kWh in July on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.
The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).
The packages, priced before anyone visits
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Havering
Faults, servicing and ageing inverters follow the same economics in Havering as anywhere else, and the guides below price them plainly.
Solar in Havering: your questions answered
What does a solar panel system produce in Havering?
Each kWp of panels in Havering makes 1,045 kWh a year on PVGIS figures, so a typical 12-panel system produces around 6,650 kWh, from about 240 kWh in December up to 820 kWh in July.
What would 12 solar panels cost in Havering?
£6,360 for 12 panels (6.36 kWp), the same as in every other place we cover, because solar is priced at £1,000 per kWp installed rather than by area. A battery adds its own installed price on top. Where Havering differs is output: about 6,650 kWh a year from that system.
Would a system in Havering need approval from the network operator?
Havering is on UK Power Networks' network (East England licence area). Systems up to 3.68kW per phase of inverter output follow G98: UK Power Networks is notified within 28 days of commissioning, with no approval needed first. Anything larger needs a G99 application before installation. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator. Our G98 vs G99 guide explains both routes.
How much would export pay on a system in Havering?
It is exported. With typical use and no battery, about 5,710 kWh of the 6,650 kWh a 12-panel system makes in Havering goes to the grid, around £685 a year at 12p. A battery keeps more of it for the evening; the export rates table shows what suppliers pay.
Is solar worth it in Havering in winter?
It works, but the year is lopsided. 68% of a Havering roof's output lands between April and September; the four months from November to February give about 1,140 kWh on a 12-panel system. Payback is worked out on the whole year, not the winter.
How Havering compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs Havering |
|---|---|---|
| Havering | 1,045 | this town |
| Barking and Dagenham | 1,040 | −5 kWh |
| Aveley | 1,049 | +4 kWh |
| South Ockendon | 1,050 | +5 kWh |
| Brentwood | 1,049 | +4 kWh |
| Redbridge | 1,035 | −10 kWh |
| Chigwell | 1,032 | −13 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
Also for Havering: Solar panels in Havering from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for Havering
Sourced, dated and written by us. The same ground we cover on your free call.
How long does a solar inverter last, and when does replacing it make sense?
The one component you should expect to replace, and the decision tree when it goes.
Read the guide →Tesla Powerwall 3 against the alternatives, and where each one wins
The strongest single box in the market, and the houses it is still wrong for.
Read the guide →Three phase and EV charging: what actually changes
Three phase buys 22kW charging. Most cars cannot use it, and load balancing usually solves the real problem.
Read the guide →Are heat pumps noisy? The 37 dB(A) answer, in plain terms
The 1 metre boundary rule is gone. A 37 dB(A) sound test replaced it.
Read the guide →Will energy prices keep rising, and by how much
The January forecasts jumped fast. What is confirmed, what is guessed, and whether solar is a real hedge.
Read the guide →Your MCS certificate: what it shows, when it arrives, and how a Smart Export Guarantee supplier uses it
The document your export payments hang on. Who issues it, what it shows, and how to get a copy.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.