0% VAT on solar panels and batteries ends 31 March 2027. What it means for you

07782 219224

Derbyshire

Solar panels in Heanor, priced before anyone visits.

A 12-panel roof in Heanor makes about 6,130 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.

Get my free quote

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation. We call or text within one working day.

Your design call is with Niall or Vince, our residential energy consultants.

or call 07782 219224

  • Free 30-minute video design call
  • Priced before anyone visits
  • Installed by our MCS-certified, fully insured teams
Sunlight in Heanor

How much a Heanor roof makes, month by month

PVGIS puts Heanor at 964 kWh per kWp a year, 2% above our Derbyshire county estimate. 68% of it arrives between April and September, peaking in May.

Map showing Heanor in Derbyshire A simplified outline map of Derbyshire with neighbouring counties shown faintly, and a pin marking the location of Heanor.
Heanor in Derbyshire

Generation per kWp, month by month

Heanor, 964 kWh per kWp a year
Heanor, monthly generation per kWp Bar chart, twelve months January to December. Peak May at 121 kWh/kWp. Lowest December at 32.1 kWh/kWp. Full values are in the table below this chart. 139 0 JFMAMJJASOND 121
Show the monthly figures
Heanor, monthly generation per kWp - monthly figures (kWh/kWp)
MonthkWh/kWp
January33.6
February50.2
March85.5
April109
May121
June114
July119
August108
September89.9
October61
November42.3
December32.1

Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.

6,130kWh a year, 12 panels
770kWh in May, the peak
200kWh in December

Against Great Britain as a whole: Heanor makes 964 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so Heanor is 4% above it.

How Heanor compares

Small towns rarely get published solar figures, so here are the numbers for Heanor. It is one of 28 Derbyshire towns we track, and it ranks joint 13th of 28 for solar yield, a town of 24,678 people in the House of Commons Library settlement data. PVGIS gives its roofs 964 kWh per kWp a year, 2.64 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £870 of year one benefit, £247 of it from your own generation and £623 from export at 12p.

These are starting numbers, not a quote. The calculator below opens on Heanor's own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.

Planning applications here go through Amber Valley; nationally, the House of Commons Library classes Heanor as a small town.

12 panels
530W panels. Most semi-detached roofs take 10 to 16 on one pitch.
Add a battery?
Installed prices. The named packages are the ones running on our current offers; the Duracell prices are for an installation alongside solar.
Electricity use
Export rate scenario
EV charger?
Estimated benefit, year one
£870
£72 a month · payback 7.3 yrs
System price, installed
£6,360
Simple payback
7.3 yrs
Generates a year
6,131 kWh
Exported
5,194 kWh at 12p
Where the money comes from
Solar you use, Export income, Off-peak shifting,

Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.

Price this for your roof

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation, nobody visits your home. Prefer to talk? 07782 219224

Your design call is with Niall or Vince, our residential energy consultants.

Modelled for Heanor at 53.01525, -1.34852 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.

Local grid

The network operator for Heanor

Heanor is served by National Grid Electricity Distribution (NGED): the town's centre falls inside its East Midlands licence area on NESO's boundary map.

What decides the paperwork is the inverter and battery output, not the number of panels. Up to 3.68kW per phase, a system follows G98: NGED is notified within 28 days of commissioning and nothing has to be approved first.

Larger systems go through G99 instead, applied for before installation. On timing: NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.

Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Aerial view of a row of red-brick heritage cottages with solar panels spaced along the roof ridge
Solar panels spaced neatly along a row of red-brick heritage cottages.
Beyond solar

Adding a heat pump or an EV charger in Heanor

A heat pump in Heanor

In December, the darkest month here, 12 panels in Heanor make about 200 kWh. That is when a heat pump runs hardest, so its running cost in Heanor comes down to the tariff and the flow temperature rather than the roof.

In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).

How heat pumps work

Charging an EV in Heanor

Summer is where a car earns its place. In May, 12 panels in Heanor make about 770 kWh, against roughly 70 kWh a typical home uses in daylight that month on our calculator's typical-use settings, so there is surplus a smart charger can put into the car instead of exporting it.

Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.

EV charging explained

FAQs

Common questions about solar in Heanor

How much electricity do solar panels make in Heanor?

About 6,130 kWh a year from 12 panels (6.36 kWp), on PVGIS satellite data for Heanor: 964 kWh per kWp, or 2.64 peak sun hours a day on average. May is the strongest month, at about 770 kWh.

What does a typical solar system cost in Heanor?

Solar is priced at £1,000 per kWp installed wherever you live, so a 12-panel, 6.36 kWp system costs £6,360 in Heanor, exactly as it would anywhere else, before any battery. Location changes what the system makes, not what it costs: here that is about 6,130 kWh a year. The final figure comes from your roof on the design call.

Which DNO covers Heanor, and what does it need from me?

National Grid Electricity Distribution (NGED) covers Heanor. A home system of up to 3.68kW per phase is notified to NGED within 28 days of commissioning under G98, and nothing waits on approval. Larger outputs need a G99 application before work starts. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.

What happens to the solar I do not use in Heanor?

Around £623 a year at 12p per kWh, for the roughly 5,194 kWh a 12-panel system in Heanor exports with typical use. Rates vary by supplier and some need their own tariff; the export rates table is dated and sourced.

How much solar does Heanor get in December?

December is the low point: about 200 kWh from a 12-panel system in Heanor, on PVGIS data, rising to 770 kWh in May. From November to February the same system makes about 1,010 kWh in total, which is why a battery charged off-peak does more of the work in winter.

How Heanor compares with its neighbours

How the towns nearest Heanor compare on the same PVGIS settings, closest first.

TownkWh per kWp a yearvs Heanor
Heanor964this town
Eastwood970+6 kWh
Ripley973+9 kWh
Ilkeston973+9 kWh
Somercotes and Swanwick965+1 kWh
Nuthall and Watnall976+12 kWh
Belper964level

Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.

Also for Heanor: Solar panels in Heanor from OVO Solar & Battery

All of Derbyshire

Instant estimate

See a number before you speak to anyone

Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.

Free, no obligation

Get my free quote

Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.

Installations can only go ahead for homeowners, as the system is fixed to the property. Do carry on if you own it, or you are about to.
Flats and apartments usually share a roof, which rules most installations out. Send your details anyway and we will tell you honestly what is possible.
1 Where is your home?
Please add your full postcode
Please add your house number
2 About you
Please add your first name
Please add your last name
Please add a UK number
Please add a valid email
3 Your property
Do you own your home?
Please let us know
Property type
Please choose your property type
4 What are you after?
Please pick one, "not sure" is fine
Roughly is fine
Please choose a timeframe
5 When shall we call?
Best time for you (optional, but it helps)

We never call after 8pm.

We call or text within one working day to book your free 30-minute video design call. Free, no obligation, wherever you are in Heanor. No home visit needed.

Your design call is with Niall or Vince, our residential energy consultants.

Call 07782 219224

By submitting you agree we can contact you about your enquiry. We never sell your details and never pass them to a panel of companies to ring you. See our privacy notice.