Solar panels in Kingswinford, designed on a free call.
A 12-panel roof in Kingswinford makes about 6,040 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
How much a Kingswinford roof makes, month by month
Kingswinford's best month is May, at 117.8 kWh per kWp; December manages 30.6. Over the year that comes to 949 kWh per kWp, level with our Staffordshire county estimate.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 33.3 |
| February | 49.6 |
| March | 83.7 |
| April | 108 |
| May | 118 |
| June | 116 |
| July | 117 |
| August | 103 |
| September | 89.8 |
| October | 61.4 |
| November | 39.8 |
| December | 30.6 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 949, Kingswinford is 3% above it.
How Kingswinford compares
Among the places we publish figures for, Kingswinford is one of 44 Staffordshire towns we track, and it ranks joint 34th of 44 for solar yield. It is a medium town in the House of Commons Library classification, with 52,597 residents, and its roofs see 2.60 peak sun hours a day across the year. That drives the standard 12 panel model to 6,036 kWh of generation, of which around 5,099 kWh is exported at 12p for £612 a year, with £247 saved on electricity you would otherwise buy at 26.32p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Kingswinford's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Any planning application in Kingswinford sits with Dudley, and its official House of Commons Library settlement class is medium town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Generation is modelled from PVGIS satellite data for Kingswinford's own coordinates (52.49371, -2.15891), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.
The network operator for Kingswinford
The distribution network operator (DNO) for Kingswinford is National Grid Electricity Distribution (NGED), which runs the West Midlands licence area.
G98 is the simple route. If the inverter, plus any battery, stays at or under 3.68kW per phase, NGED only has to be told within 28 days after the system is commissioned.
Above that, G99 means applying before the work is booked. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.
Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Kingswinford
A heat pump in Kingswinford
In December, the darkest month here, 12 panels in Kingswinford make about 190 kWh. That is when a heat pump runs hardest, so its running cost in Kingswinford comes down to the tariff and the flow temperature rather than the roof.
The Boiler Upgrade Scheme, open in England and Wales, takes £7,500 off an air source or ground source heat pump, or £2,500 off an air-to-air unit. Homes on oil or LPG with no mains gas get £1,500 more until March 2027 (gov.uk, checked 28 September 2026).
Charging an EV in Kingswinford
Kingswinford's May output, about 750 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.
The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Kingswinford
If a system in Kingswinford is underperforming, start with the guides below: repair benchmarks, service scope, and the inverter question.
Solar in Kingswinford: your questions answered
How much energy would 12 solar panels make in Kingswinford?
Kingswinford averages 2.60 peak sun hours a day, which PVGIS turns into 949 kWh per kWp a year. On a 12-panel, 6.36 kWp roof that is about 6,040 kWh, 69% of it between April and September.
Is solar more expensive in Kingswinford?
Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Kingswinford, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,040 kWh a year here, which is what drives payback.
Who is the network operator in Kingswinford, and do I need a G99 application?
The operator is National Grid Electricity Distribution (NGED). Most home systems use the G98 route, a notification within 28 days of switch-on for up to 3.68kW per phase, so nothing waits on the network. Above that, G99 applies and has to be granted first. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late. Your design call checks which route yours needs.
What could I earn from exporting in Kingswinford?
On the 12p export scenario, a 12-panel system in Kingswinford sends about 5,099 kWh a year to the grid, worth around £612. The export rates table compares what each supplier pays.
How does solar perform in Kingswinford in the winter months?
December is the weakest month in Kingswinford: about 190 kWh from 12 panels, against 750 kWh in May. The panels still generate on bright winter days; they just cover a smaller share of what the house uses.
How Kingswinford compares with its neighbours
How the towns nearest Kingswinford compare on the same PVGIS settings, closest first.
| Town | kWh per kWp a year | vs Kingswinford |
|---|---|---|
| Kingswinford | 949 | this town |
| Brierley Hill | 949 | level |
| Sedgley | 948 | −1 kWh |
| Dudley | 956 | +7 kWh |
| Stourbridge | 949 | level |
| Wombourne | 953 | +4 kWh |
| Cradley Heath | 947 | −2 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
Also for Kingswinford: Solar panels in Kingswinford from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Kingswinford homeowners
Sourced, dated and written by us. The same ground we cover on your free call.
Back contact solar panels, explained for a UK roof
What back contact changes on a roof, compared fairly with TOPCon, with the makers' own claims labelled.
Read the guide →Inside a home battery: capacity, power and losses
Usable capacity, kW output, round trip losses and chemistry, in plain terms.
Read the guide →How solar aware EV charging actually works
The CT clamp, the surplus tracking and the 1.4kW floor that catches people out.
Read the guide →Heat pump running costs versus a gas boiler, assumptions shown
Four numbers decide it: seasonal efficiency, flow temperature, tariff and heat demand.
Read the guide →Why tariff choice moves payback more than kit choice
Identical kit, five times the export income. The tariff decision worked through with August 2026 rates.
Read the guide →MCS, HIES, RECC, NAPIT, TrustMark and Flexi-Orb: which badge does what
Six logos, six different jobs. What each scheme covers, and which are actually required.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.