Solar panels in Sedgley, designed on a free call.
Twelve panels (6.36 kWp) here make about 6,030 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
How much a Sedgley roof makes, month by month
Sedgley's best month is July, at 117.7 kWh per kWp; December manages 31.9. Over the year that comes to 948 kWh per kWp, level with our Staffordshire county estimate.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 33.8 |
| February | 48.1 |
| March | 83.1 |
| April | 107 |
| May | 117 |
| June | 116 |
| July | 118 |
| August | 103 |
| September | 89.1 |
| October | 60.9 |
| November | 40.2 |
| December | 31.9 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
For scale: 948 kWh per kWp in Sedgley against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Sedgley 2% above it.
How Sedgley compares
Among the places we publish figures for, Sedgley is one of 44 Staffordshire towns we track, and it ranks joint 36th of 44 for solar yield. It is a medium town in the House of Commons Library classification, with 32,223 residents, and its roofs see 2.60 peak sun hours a day across the year. That drives the standard 12 panel model to 6,029 kWh of generation, of which around 5,093 kWh is exported at 12p for £611 a year, with £247 saved on electricity you would otherwise buy at 26.32p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Sedgley's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Planning applications here go through Dudley; nationally, the House of Commons Library classes Sedgley as a medium town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for Sedgley at 52.53122, -2.12685 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
NGED and your Sedgley connection
National Grid Electricity Distribution (NGED) owns and runs the local electricity network in Sedgley, as part of its West Midlands licence area.
For a typical home the paperwork is light: a system of up to 3.68kW per phase goes through G98, which means NGED is notified within 28 days of switch-on rather than asked beforehand.
Above that, G99 means applying before the work is booked. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.
Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Sedgley
A heat pump in Sedgley
In December, the darkest month here, 12 panels in Sedgley make about 200 kWh. That is when a heat pump runs hardest, so its running cost in Sedgley comes down to the tariff and the flow temperature rather than the roof.
The Boiler Upgrade Scheme, open in England and Wales, takes £7,500 off an air source or ground source heat pump, or £2,500 off an air-to-air unit. Homes on oil or LPG with no mains gas get £1,500 more until March 2027 (gov.uk, checked 28 September 2026).
Charging an EV in Sedgley
Sedgley's July output, about 750 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Sedgley
If a system in Sedgley is underperforming, start with the guides below: repair benchmarks, service scope, and the inverter question.
Solar in Sedgley: your questions answered
How much energy would 12 solar panels make in Sedgley?
Sedgley averages 2.60 peak sun hours a day, which PVGIS turns into 948 kWh per kWp a year. On a 12-panel, 6.36 kWp roof that is about 6,030 kWh, 69% of it between April and September.
Is solar more expensive in Sedgley?
Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Sedgley, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,030 kWh a year here, which is what drives payback.
Who is the network operator in Sedgley, and do I need a G99 application?
The operator is National Grid Electricity Distribution (NGED). Most home systems use the G98 route, a notification within 28 days of switch-on for up to 3.68kW per phase, so nothing waits on the network. Above that, G99 applies and has to be granted first. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late. Your design call checks which route yours needs.
What could I earn from exporting in Sedgley?
On the 12p export scenario, a 12-panel system in Sedgley sends about 5,093 kWh a year to the grid, worth around £611. The export rates table compares what each supplier pays.
How does solar perform in Sedgley in the winter months?
December is the weakest month in Sedgley: about 200 kWh from 12 panels, against 750 kWh in July. The panels still generate on bright winter days; they just cover a smaller share of what the house uses.
How Sedgley compares with its neighbours
How the towns nearest Sedgley compare on the same PVGIS settings, closest first.
| Town | kWh per kWp a year | vs Sedgley |
|---|---|---|
| Sedgley | 948 | this town |
| Coseley | 957 | +9 kWh |
| Dudley | 956 | +8 kWh |
| Wombourne | 953 | +5 kWh |
| Kingswinford | 949 | +1 kWh |
| Tipton | 957 | +9 kWh |
| Bilston | 955 | +7 kWh |
PVGIS v5.2 for each town centroid, identical assumptions throughout. A few kWh either way is weather-year noise; a spread beyond about 30 kWh per kWp is real geography.
Also for Sedgley: Solar panels in Sedgley from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Sedgley homeowners
Sourced, dated and written by us. The same ground we cover on your free call.
How long do solar panels last? 25 to 30 years, in practice
The panels outlast the inverter by a wide margin. Plan for that, not for cleaning.
Read the guide →What a battery gateway actually does
Without a gateway your system shuts down when the grid does. Here is what the box actually does.
Read the guide →Smart charge point regulations, explained
Why your charger arrives pre-set to charge overnight, and why it waits before it starts.
Read the guide →How much does a heat pump cost? The 2026 numbers, before and after the grant
UK median installed cost around £12,908, before the up to £7,500 grant comes off.
Read the guide →Why tariff choice moves payback more than kit choice
Identical kit, five times the export income. The tariff decision worked through with August 2026 rates.
Read the guide →Your MCS certificate: what it shows, when it arrives, and how a Smart Export Guarantee supplier uses it
The document your export payments hang on. Who issues it, what it shows, and how to get a copy.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.