Solar panels in Maidenhead, sized to your roof.
A 12-panel roof in Maidenhead makes about 6,530 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Maidenhead's solar year
From 36.6 kWh per kWp in December to 125.3 in July: a roof in Maidenhead makes 3.4 times as much in its best month as in its darkest, and 1,027 kWh per kWp across the year.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 40.3 |
| February | 52.9 |
| March | 88.2 |
| April | 116 |
| May | 122 |
| June | 124 |
| July | 125 |
| August | 113 |
| September | 96.2 |
| October | 67.2 |
| November | 46.2 |
| December | 36.6 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
For scale: 1,027 kWh per kWp in Maidenhead against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Maidenhead 11% above it.
How Maidenhead compares
Maidenhead is one of 20 Berkshire towns we track, and it ranks joint 7th of 20 for solar yield. The House of Commons Library settlement data classes it as a large town of 70,635 people. At 1,027 kWh per kWp a year, a typical 12 panel system here pays for itself in around 6.9 years on the 12p scenario: £918 of year one benefit against £6,360 installed, £247 of that benefit from cutting 26.32p imports with your own generation.
Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on Maidenhead's own yield.
Windsor and Maidenhead is the planning authority covering Maidenhead, which the House of Commons Library classes as a large town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
The figures use PVGIS for the centre of Maidenhead (51.51994, -0.73051), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.
Who runs the grid in Maidenhead
Maidenhead sits in Scottish and Southern Electricity Networks' Southern England licence area, so SSEN is the network operator (DNO) any solar panels or battery here are registered with.
Below 3.68kW per phase of inverter and battery output, the G98 route applies: the installation is notified to SSEN within 28 days of commissioning, with no prior approval.
A bigger inverter or battery output needs a G99 application in advance. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW.
Sources: NESO DNO licence areas (3 May 2024); SSEN, micro-generation connections page, checked 25 September 2026. G98 vs G99, explained.

Beyond the panels: heating and car charging in Maidenhead
A heat pump in Maidenhead
A heat pump does most of its work from November to February. Over those four months, 12 panels in Maidenhead make about 1,120 kWh, against 3,080 kWh from May to August, so winter heating runs mostly on grid electricity and the tariff matters more than the roof.
Grant support in England comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).
Charging an EV in Maidenhead
A 12-panel roof in Maidenhead makes about 800 kWh in July. A typical home uses around 70 kWh of that in daylight (the calculator's typical-use settings), which leaves most of the month's output for an EV or for export.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
The packages, priced before anyone visits
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Maidenhead
Faults, servicing and ageing inverters follow the same economics in Maidenhead as anywhere else, and the guides below price them plainly.
Solar in Maidenhead: your questions answered
What does a solar panel system produce in Maidenhead?
Each kWp of panels in Maidenhead makes 1,027 kWh a year on PVGIS figures, so a typical 12-panel system produces around 6,530 kWh, from about 230 kWh in December up to 800 kWh in July.
How much are solar panels in Maidenhead?
The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in Maidenhead before a battery. What Maidenhead changes is the return, about 6,530 kWh a year from that system, and your design call prices your actual roof.
Would a system in Maidenhead need approval from the network operator?
Maidenhead is on Scottish and Southern Electricity Networks' network (Southern England licence area). Systems up to 3.68kW per phase of inverter output follow G98: SSEN is notified within 28 days of commissioning, with no approval needed first. Anything larger needs a G99 application before installation. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW. Our G98 vs G99 guide explains both routes.
How much can I earn from exporting solar in Maidenhead?
With typical use and no battery, a 12-panel system in Maidenhead exports about 5,595 kWh a year. At 12p per kWh that is roughly £671; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.
Is solar worth it in Maidenhead in winter?
It works, but the year is lopsided. 68% of a Maidenhead roof's output lands between April and September; the four months from November to February give about 1,120 kWh on a 12-panel system. Payback is worked out on the whole year, not the winter.
How Maidenhead compares with its neighbours
The six closest towns we publish, run through the identical PVGIS query as Maidenhead.
| Town | kWh per kWp a year | vs Maidenhead |
|---|---|---|
| Maidenhead | 1,027 | this town |
| Marlow | 1,026 | −1 kWh |
| Windsor | 1,021 | −6 kWh |
| Slough | 1,028 | +1 kWh |
| Flackwell Heath and Wooburn Green | 1,009 | −18 kWh |
| Twyford | 1,021 | −6 kWh |
| Beaconsfield | 1,011 | −16 kWh |
PVGIS v5.2 for each town centroid, identical assumptions throughout. A few kWh either way is weather-year noise; a spread beyond about 30 kWh per kWp is real geography.
Also for Maidenhead: Solar panels in Maidenhead from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Guides worth reading before your call
Sourced, dated and written by us. The same ground we cover on your free call.
Solar installation day: exactly what happens, hour by hour
The week before, the day itself hour by hour, and the paperwork that follows.
Read the guide →Adding a battery to solar panels you already own
Retrofitting a battery to working solar is straightforward. The paperwork is where people trip up.
Read the guide →Home EV charger types and speeds, explained properly
Granny cable, 7kW wall unit or 22kW three phase. What each adds per hour, and which you need.
Read the guide →Are air source heat pumps any good? What owners actually report
The UK's largest survey found 80% of heat pump owners satisfied, against 70% for gas boilers.
Read the guide →Will energy prices keep rising, and by how much
The January forecasts jumped fast. What is confirmed, what is guessed, and whether solar is a real hedge.
Read the guide →NAPIT, NICEIC and competent person schemes: who tells building control about your solar
Solar work is notifiable. A competent person scheme means your installation team notifies, not you.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.