Solar panels in Motherwell, priced before anyone visits.
About 5,530 kWh a year from 12 panels in Motherwell, £6,360 installed, with your system designed on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
How much a Motherwell roof makes, month by month
PVGIS puts Motherwell at 870 kWh per kWp a year, 3% above our Lanarkshire county estimate. 71% of it arrives between April and September, peaking in May.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 24.2 |
| February | 43.2 |
| March | 72.9 |
| April | 104 |
| May | 121 |
| June | 110 |
| July | 110 |
| August | 98.5 |
| September | 78.3 |
| October | 53.5 |
| November | 34.4 |
| December | 20.3 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 870, Motherwell is 6% below it.
How Motherwell compares
Among the places we publish figures for, Motherwell is one of 18 Lanarkshire towns we track, and it ranks 2nd of 18 for solar yield. It is a medium town in the House of Commons Library classification, with 47,901 residents, and its roofs see 2.38 peak sun hours a day across the year. That drives the standard 12 panel model to 5,533 kWh of generation, of which around 4,597 kWh is exported at 12p for £552 a year, with £247 saved on electricity you would otherwise buy at 26.32p.
These are starting numbers, not a quote. The calculator below opens on Motherwell's own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.
Planning applications here go through North Lanarkshire; nationally, the House of Commons Library classes Motherwell as a medium town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for Motherwell at 55.78996, -3.99357 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
The network operator for Motherwell
On NESO's licence-area map, Motherwell is in South and Central Scotland, which SP Energy Networks operates. That makes SP Energy Networks the network operator for any system fitted here.
Most home systems stay within 3.68kW per phase of inverter output, which puts them on G98, a notification to SP Energy Networks within 28 days of switch-on. Panel count does not decide it; the inverter and any battery do.
Larger systems go through G99 instead, applied for before installation. On timing: Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Adding a heat pump or an EV charger in Motherwell
A heat pump in Motherwell
Heating demand peaks when solar is weakest. In Motherwell, a 12-panel system makes about 130 kWh in December and 150 kWh in January, a fraction of its 770 kWh in May, which is why a heat pump here is costed on its tariff first.
In Scotland, Home Energy Scotland offers a grant of up to £7,500 towards a heat pump, an optional interest-free loan of up to £7,500 on top, and £1,500 more for rural and island homes (Home Energy Scotland, checked 28 September 2026).
Charging an EV in Motherwell
Summer is where a car earns its place. In May, 12 panels in Motherwell make about 770 kWh, against roughly 70 kWh a typical home uses in daylight that month on our calculator's typical-use settings, so there is surplus a smart charger can put into the car instead of exporting it.
Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Motherwell
The same sourced benchmarks apply in Motherwell as everywhere we cover: honest repair pricing and what a service should include.
Common questions about solar in Motherwell
How much electricity do solar panels make in Motherwell?
About 5,530 kWh a year from 12 panels (6.36 kWp), on PVGIS satellite data for Motherwell: 870 kWh per kWp, or 2.38 peak sun hours a day on average. May is the strongest month, at about 770 kWh.
What does a typical solar system cost in Motherwell?
Solar is priced at £1,000 per kWp installed wherever you live, so a 12-panel, 6.36 kWp system costs £6,360 in Motherwell, exactly as it would anywhere else, before any battery. Location changes what the system makes, not what it costs: here that is about 5,530 kWh a year. The final figure comes from your roof on the design call.
Which DNO covers Motherwell, and what does it need from me?
SP Energy Networks covers Motherwell. A home system of up to 3.68kW per phase is notified to SP Energy Networks within 28 days of commissioning under G98, and nothing waits on approval. Larger outputs need a G99 application before work starts. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator.
What happens to the solar I do not use in Motherwell?
Around £552 a year at 12p per kWh, for the roughly 4,597 kWh a 12-panel system in Motherwell exports with typical use. Rates vary by supplier and some need their own tariff; the export rates table is dated and sourced.
How much solar does Motherwell get in December?
December is the low point: about 130 kWh from a 12-panel system in Motherwell, on PVGIS data, rising to 770 kWh in May. From November to February the same system makes about 780 kWh in total, which is why a battery charged off-peak does more of the work in winter.
How Motherwell compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs Motherwell |
|---|---|---|
| Motherwell | 870 | this town |
| Hamilton | 871 | +1 kWh |
| Bellshill | 851 | −19 kWh |
| Wishaw | 861 | −9 kWh |
| Blantyre | 866 | −4 kWh |
| Larkhall | 864 | −6 kWh |
| Uddingston | 860 | −10 kWh |
Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.
Also for Motherwell: Solar panels in Motherwell from OVO Solar & Battery
Also near Motherwell
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for Motherwell
Sourced, dated and written by us. The same ground we cover on your free call.
How to size a solar and battery system, properly
Usage, storage, connection, array. Four decisions, and the order between them matters.
Read the guide →How much a battery saves by charging on cheap night rates
What charging at 8.5p and using at 26.32p is actually worth over a year.
Read the guide →Charging an EV from your own solar
Every surplus kWh is 3.6 to 5 miles. Whether that beats a 7p overnight rate is arithmetic.
Read the guide →What MCS certification actually buys you on a heat pump job
The gate on the £7,500 grant, the design standard behind your running costs, and the noise sign-off.
Read the guide →EV tariffs compared: the cheapest overnight windows
Overnight rates of 6.99p to 9p against a 26.32p capped average, compared.
Read the guide →NAPIT, NICEIC and competent person schemes: who tells building control about your solar
Solar work is notifiable. A competent person scheme means your installation team notifies, not you.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.