0% VAT on solar panels and batteries ends 31 March 2027. What it means for you

07782 219224

Lanarkshire

Solar panels in Motherwell, priced before anyone visits.

About 5,530 kWh a year from 12 panels in Motherwell, £6,360 installed, with your system designed on a free 30-minute video call.

Get my free quote

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation. We call or text within one working day.

Your design call is with Niall or Vince, our residential energy consultants.

or call 07782 219224

  • Free 30-minute video design call
  • Priced before anyone visits
  • Installed by our MCS-certified, fully insured teams
Sunlight in Motherwell

How much a Motherwell roof makes, month by month

PVGIS puts Motherwell at 870 kWh per kWp a year, 3% above our Lanarkshire county estimate. 71% of it arrives between April and September, peaking in May.

Map showing Motherwell in Lanarkshire A simplified outline map of Lanarkshire with neighbouring counties shown faintly, and a pin marking the location of Motherwell.
Motherwell in Lanarkshire

Generation per kWp, month by month

Motherwell, 870 kWh per kWp a year
Motherwell, monthly generation per kWp Bar chart, twelve months January to December. Peak May at 121 kWh/kWp. Lowest December at 20.3 kWh/kWp. Full values are in the table below this chart. 139 0 JFMAMJJASOND 121
Show the monthly figures
Motherwell, monthly generation per kWp - monthly figures (kWh/kWp)
MonthkWh/kWp
January24.2
February43.2
March72.9
April104
May121
June110
July110
August98.5
September78.3
October53.5
November34.4
December20.3

Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.

5,530kWh a year, 12 panels
770kWh in May, the peak
130kWh in December

Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 870, Motherwell is 6% below it.

How Motherwell compares

Among the places we publish figures for, Motherwell is one of 18 Lanarkshire towns we track, and it ranks 2nd of 18 for solar yield. It is a medium town in the House of Commons Library classification, with 47,901 residents, and its roofs see 2.38 peak sun hours a day across the year. That drives the standard 12 panel model to 5,533 kWh of generation, of which around 4,597 kWh is exported at 12p for £552 a year, with £247 saved on electricity you would otherwise buy at 26.32p.

These are starting numbers, not a quote. The calculator below opens on Motherwell's own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.

Planning applications here go through North Lanarkshire; nationally, the House of Commons Library classes Motherwell as a medium town.

12 panels
530W panels. Most semi-detached roofs take 10 to 16 on one pitch.
Add a battery?
Installed prices. The named packages are the ones running on our current offers; the Duracell prices are for an installation alongside solar.
Electricity use
Export rate scenario
EV charger?
Estimated benefit, year one
£798
£67 a month · payback 8.0 yrs
System price, installed
£6,360
Simple payback
8.0 yrs
Generates a year
5,533 kWh
Exported
4,597 kWh at 12p
Where the money comes from
Solar you use, Export income, Off-peak shifting,

Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.

Price this for your roof

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation, nobody visits your home. Prefer to talk? 07782 219224

Your design call is with Niall or Vince, our residential energy consultants.

Modelled for Motherwell at 55.78996, -3.99357 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.

Local grid

The network operator for Motherwell

On NESO's licence-area map, Motherwell is in South and Central Scotland, which SP Energy Networks operates. That makes SP Energy Networks the network operator for any system fitted here.

Most home systems stay within 3.68kW per phase of inverter output, which puts them on G98, a notification to SP Energy Networks within 28 days of switch-on. Panel count does not decide it; the inverter and any battery do.

Larger systems go through G99 instead, applied for before installation. On timing: Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator.

Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Aerial view of a row of red-brick heritage cottages with solar panels spaced along the roof ridge
Solar panels spaced neatly along a row of red-brick heritage cottages.
Beyond solar

Adding a heat pump or an EV charger in Motherwell

A heat pump in Motherwell

Heating demand peaks when solar is weakest. In Motherwell, a 12-panel system makes about 130 kWh in December and 150 kWh in January, a fraction of its 770 kWh in May, which is why a heat pump here is costed on its tariff first.

In Scotland, Home Energy Scotland offers a grant of up to £7,500 towards a heat pump, an optional interest-free loan of up to £7,500 on top, and £1,500 more for rural and island homes (Home Energy Scotland, checked 28 September 2026).

How heat pumps work

Charging an EV in Motherwell

Summer is where a car earns its place. In May, 12 panels in Motherwell make about 770 kWh, against roughly 70 kWh a typical home uses in daylight that month on our calculator's typical-use settings, so there is surplus a smart charger can put into the car instead of exporting it.

Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.

EV charging explained

Already got panels?

Solar panel servicing and repair in Motherwell

The same sourced benchmarks apply in Motherwell as everywhere we cover: honest repair pricing and what a service should include.

FAQs

Common questions about solar in Motherwell

How much electricity do solar panels make in Motherwell?

About 5,530 kWh a year from 12 panels (6.36 kWp), on PVGIS satellite data for Motherwell: 870 kWh per kWp, or 2.38 peak sun hours a day on average. May is the strongest month, at about 770 kWh.

What does a typical solar system cost in Motherwell?

Solar is priced at £1,000 per kWp installed wherever you live, so a 12-panel, 6.36 kWp system costs £6,360 in Motherwell, exactly as it would anywhere else, before any battery. Location changes what the system makes, not what it costs: here that is about 5,530 kWh a year. The final figure comes from your roof on the design call.

Which DNO covers Motherwell, and what does it need from me?

SP Energy Networks covers Motherwell. A home system of up to 3.68kW per phase is notified to SP Energy Networks within 28 days of commissioning under G98, and nothing waits on approval. Larger outputs need a G99 application before work starts. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator.

What happens to the solar I do not use in Motherwell?

Around £552 a year at 12p per kWh, for the roughly 4,597 kWh a 12-panel system in Motherwell exports with typical use. Rates vary by supplier and some need their own tariff; the export rates table is dated and sourced.

How much solar does Motherwell get in December?

December is the low point: about 130 kWh from a 12-panel system in Motherwell, on PVGIS data, rising to 770 kWh in May. From November to February the same system makes about 780 kWh in total, which is why a battery charged off-peak does more of the work in winter.

How Motherwell compares with its neighbours

Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.

TownkWh per kWp a yearvs Motherwell
Motherwell870this town
Hamilton871+1 kWh
Bellshill851−19 kWh
Wishaw861−9 kWh
Blantyre866−4 kWh
Larkhall864−6 kWh
Uddingston860−10 kWh

Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.

Also for Motherwell: Solar panels in Motherwell from OVO Solar & Battery

All of Lanarkshire

Also near Motherwell

Instant estimate

See a number before you speak to anyone

Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.

Free, no obligation

Get my free quote

Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.

Installations can only go ahead for homeowners, as the system is fixed to the property. Do carry on if you own it, or you are about to.
Flats and apartments usually share a roof, which rules most installations out. Send your details anyway and we will tell you honestly what is possible.
1 Where is your home?
Please add your full postcode
Please add your house number
2 About you
Please add your first name
Please add your last name
Please add a UK number
Please add a valid email
3 Your property
Do you own your home?
Please let us know
Property type
Please choose your property type
4 What are you after?
Please pick one, "not sure" is fine
Roughly is fine
Please choose a timeframe
5 When shall we call?
Best time for you (optional, but it helps)

We never call after 8pm.

We call or text within one working day to book your free 30-minute video design call. Free, no obligation, wherever you are in Motherwell. No home visit needed.

Your design call is with Niall or Vince, our residential energy consultants.

Call 07782 219224

By submitting you agree we can contact you about your enquiry. We never sell your details and never pass them to a panel of companies to ring you. See our privacy notice.