Solar panels in Wishaw, priced before anyone visits.
About 5,480 kWh a year from 12 panels in Wishaw, £6,360 installed, with your system designed on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Sunlight in Wishaw, in numbers
Wishaw's best month is May, at 119.7 kWh per kWp; December manages 19.5. Over the year that comes to 861 kWh per kWp, 2% above our Lanarkshire county estimate.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 23.9 |
| February | 43 |
| March | 72.1 |
| April | 103 |
| May | 120 |
| June | 109 |
| July | 109 |
| August | 97.3 |
| September | 76.8 |
| October | 53 |
| November | 34.2 |
| December | 19.5 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
For scale: 861 kWh per kWp in Wishaw against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Wishaw 7% below it.
How Wishaw compares
Among the places we publish figures for, Wishaw is one of 18 Lanarkshire towns we track, and it ranks 6th of 18 for solar yield. It is a medium town in the House of Commons Library classification, with 30,602 residents, and its roofs see 2.36 peak sun hours a day across the year. That drives the standard 12 panel model to 5,476 kWh of generation, of which around 4,539 kWh is exported at 12p for £545 a year, with £247 saved on electricity you would otherwise buy at 26.32p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Wishaw's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Any planning application in Wishaw sits with North Lanarkshire, and its official House of Commons Library settlement class is medium town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Generation is modelled from PVGIS satellite data for Wishaw's own coordinates (55.77448, -3.92114), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.
SP Energy Networks and your Wishaw connection
On NESO's licence-area map, Wishaw is in South and Central Scotland, which SP Energy Networks operates. That makes SP Energy Networks the network operator for any system fitted here.
Below 3.68kW per phase of inverter and battery output, the G98 route applies: the installation is notified to SP Energy Networks within 28 days of commissioning, with no prior approval.
Larger systems go through G99 instead, applied for before installation. On timing: Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Wishaw
A heat pump in Wishaw
In December, the darkest month here, 12 panels in Wishaw make about 120 kWh. That is when a heat pump runs hardest, so its running cost in Wishaw comes down to the tariff and the flow temperature rather than the roof.
In Scotland, Home Energy Scotland offers a grant of up to £7,500 towards a heat pump, an optional interest-free loan of up to £7,500 on top, and £1,500 more for rural and island homes (Home Energy Scotland, checked 28 September 2026).
Charging an EV in Wishaw
Summer is where a car earns its place. In May, 12 panels in Wishaw make about 760 kWh, against roughly 70 kWh a typical home uses in daylight that month on our calculator's typical-use settings, so there is surplus a smart charger can put into the car instead of exporting it.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Wishaw
If a system in Wishaw is underperforming, start with the guides below: repair benchmarks, service scope, and the inverter question.
Solar in Wishaw: your questions answered
How much energy would 12 solar panels make in Wishaw?
Wishaw averages 2.36 peak sun hours a day, which PVGIS turns into 861 kWh per kWp a year. On a 12-panel, 6.36 kWp roof that is about 5,480 kWh, 71% of it between April and September.
What does a typical solar system cost in Wishaw?
Solar is priced at £1,000 per kWp installed wherever you live, so a 12-panel, 6.36 kWp system costs £6,360 in Wishaw, exactly as it would anywhere else, before any battery. Location changes what the system makes, not what it costs: here that is about 5,480 kWh a year. The final figure comes from your roof on the design call.
Who is the network operator in Wishaw, and do I need a G99 application?
The operator is SP Energy Networks. Most home systems use the G98 route, a notification within 28 days of switch-on for up to 3.68kW per phase, so nothing waits on the network. Above that, G99 applies and has to be granted first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator. Your design call checks which route yours needs.
What happens to the solar I do not use in Wishaw?
Around £545 a year at 12p per kWh, for the roughly 4,539 kWh a 12-panel system in Wishaw exports with typical use. Rates vary by supplier and some need their own tariff; the export rates table is dated and sourced.
How does solar perform in Wishaw in the winter months?
December is the weakest month in Wishaw: about 120 kWh from 12 panels, against 760 kWh in May. The panels still generate on bright winter days; they just cover a smaller share of what the house uses.
How Wishaw compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs Wishaw |
|---|---|---|
| Wishaw | 861 | this town |
| Motherwell | 870 | +9 kWh |
| Larkhall | 864 | +3 kWh |
| Carluke | 846 | −15 kWh |
| Hamilton | 871 | +10 kWh |
| Bellshill | 851 | −10 kWh |
| Shotts | 824 | −37 kWh |
Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.
Also for Wishaw: Solar panels in Wishaw from OVO Solar & Battery
Also near Wishaw
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for Wishaw
Sourced, dated and written by us. The same ground we cover on your free call.
G98 vs G99: the 28-day form and the eight-week wait, in plain English
One number on your quote decides between a formality and an eight week wait.
Read the guide →Does a standalone battery actually pay back?
No panels means one job: buy cheap, use later. The tariff decides whether it pays.
Read the guide →The main home EV chargers, compared on what actually differs
Eight popular UK home chargers on cable, connectivity, warranty and tariff integration.
Read the guide →What MCS certification actually buys you on a heat pump job
The gate on the £7,500 grant, the design standard behind your running costs, and the noise sign-off.
Read the guide →EV tariffs compared: the cheapest overnight windows
Overnight rates of 6.99p to 9p against a 26.32p capped average, compared.
Read the guide →HIES explained: what the badge actually protects, and when
What HIES protects: deposits up to 25 percent capped at 5,000 pounds, and your workmanship guarantee.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.