Solar panels in Petersfield, designed on a free call.
About 6,720 kWh a year from 12 panels in Petersfield, £6,360 installed, with your system designed on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
How much a Petersfield roof makes, month by month
Petersfield's best month is June, at 128.3 kWh per kWp; December manages 36.7. Over the year that comes to 1,056 kWh per kWp, 1% above our Hampshire county estimate.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 40.9 |
| February | 55 |
| March | 92.5 |
| April | 120 |
| May | 127 |
| June | 128 |
| July | 128 |
| August | 114 |
| September | 98.8 |
| October | 67.5 |
| November | 47.4 |
| December | 36.7 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
For scale: 1,056 kWh per kWp in Petersfield against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Petersfield 14% above it.
How Petersfield compares
Small towns rarely get published solar figures, so here are the numbers for Petersfield. It is one of 45 Hampshire towns we track, and it ranks 34th of 45 for solar yield, a town of 15,420 people in the House of Commons Library settlement data. PVGIS gives its roofs 1,056 kWh per kWp a year, 2.89 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £941 of year one benefit, £247 of it from your own generation and £694 from export at 12p.
These are starting numbers, not a quote. The calculator below opens on Petersfield's own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.
Any planning application in Petersfield sits with East Hampshire, and its official House of Commons Library settlement class is small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
The figures use PVGIS for the centre of Petersfield (51.00533, -0.93469), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.
SSEN and your Petersfield connection
The distribution network operator (DNO) for Petersfield is Scottish and Southern Electricity Networks (SSEN), which runs the Southern England licence area.
For a typical home the paperwork is light: a system of up to 3.68kW per phase goes through G98, which means SSEN is notified within 28 days of switch-on rather than asked beforehand.
Above that, G99 means applying before the work is booked. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW.
Sources: NESO DNO licence areas (3 May 2024); SSEN, micro-generation connections page, checked 25 September 2026. G98 vs G99, explained.

Adding a heat pump or an EV charger in Petersfield
A heat pump in Petersfield
Heating demand peaks when solar is weakest. In Petersfield, a 12-panel system makes about 230 kWh in December and 260 kWh in January, a fraction of its 820 kWh in June, which is why a heat pump here is costed on its tariff first.
In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).
Charging an EV in Petersfield
Petersfield's June output, about 820 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
The packages, priced before anyone visits
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Petersfield
If a system in Petersfield is underperforming, start with the guides below: repair benchmarks, service scope, and the inverter question.
Petersfield solar questions
How much energy would 12 solar panels make in Petersfield?
Petersfield averages 2.89 peak sun hours a day, which PVGIS turns into 1,056 kWh per kWp a year. On a 12-panel, 6.36 kWp roof that is about 6,720 kWh, 68% of it between April and September.
Is solar more expensive in Petersfield?
Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Petersfield, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,720 kWh a year here, which is what drives payback.
Who is the network operator in Petersfield, and do I need a G99 application?
The operator is Scottish and Southern Electricity Networks (SSEN). Most home systems use the G98 route, a notification within 28 days of switch-on for up to 3.68kW per phase, so nothing waits on the network. Above that, G99 applies and has to be granted first. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW. Your design call checks which route yours needs.
What could I earn from exporting in Petersfield?
On the 12p export scenario, a 12-panel system in Petersfield sends about 5,779 kWh a year to the grid, worth around £694. The export rates table compares what each supplier pays.
How does solar perform in Petersfield in the winter months?
December is the weakest month in Petersfield: about 230 kWh from 12 panels, against 820 kWh in June. The panels still generate on bright winter days; they just cover a smaller share of what the house uses.
How Petersfield compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs Petersfield |
|---|---|---|
| Petersfield | 1,056 | this town |
| Horndean | 1,111 | +55 kWh |
| Bordon | 1,025 | −31 kWh |
| Waterlooville | 1,125 | +69 kWh |
| Alton | 1,043 | −13 kWh |
| Havant | 1,133 | +77 kWh |
| Emsworth | 1,146 | +90 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
Also for Petersfield: Solar panels in Petersfield from OVO Solar & Battery
Also near Petersfield
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for Petersfield
Sourced, dated and written by us. The same ground we cover on your free call.
G98 vs G99: the 28-day form and the eight-week wait, in plain English
One number on your quote decides between a formality and an eight week wait.
Read the guide →Which battery size band does your home fall into?
Where UK homes actually land, why oversizing costs you, and what shifts the band.
Read the guide →How time of use charging windows actually work
How a cheap overnight window is metered and billed, and what a battery does inside it.
Read the guide →Are heat pumps worth it? The real 2026 numbers
Electricity costs 3.3x gas per kWh. A heat pump is about 3x as efficient. The numbers nearly cancel out.
Read the guide →Why tariff choice moves payback more than kit choice
Identical kit, five times the export income. The tariff decision worked through with August 2026 rates.
Read the guide →G98 or G99: which one applies, what the application involves, and how long it takes
The G98 line sits at 3.68kW per phase. Above it, your network operator has to say yes first.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.