Solar panels in Richmond upon Thames, with the numbers shown.
Twelve panels (6.36 kWp) here make about 6,510 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Richmond upon Thames' solar year
From 35.9 kWh per kWp in December to 126 in July: a roof in Richmond upon Thames makes 3.5 times as much in its best month as in its darkest, and 1,024 kWh per kWp across the year.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 39.4 |
| February | 52.1 |
| March | 87.7 |
| April | 115 |
| May | 122 |
| June | 124 |
| July | 126 |
| August | 111 |
| September | 96.3 |
| October | 67.2 |
| November | 46.6 |
| December | 35.9 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 1,024, Richmond upon Thames is 11% above it.
How Richmond upon Thames compares
Richmond upon Thames is one of 23 Middlesex towns we track, and it ranks joint 15th of 23 for solar yield. The House of Commons Library settlement classification puts it in the core city class, with a population of 194,326, which makes it one of the largest places we publish figures for. Scale changes nothing about the physics: PVGIS gives a roof here 1,024 kWh per kWp a year, 2.81 peak sun hours a day averaged across the seasons, and on the 12p scenario about £247 of the year one benefit comes from solar you use yourself, with export income adding £669.
Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on Richmond upon Thames' own yield.
Planning applications in Richmond upon Thames go to its own council, and the House of Commons Library classes it as a core city.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Generation is modelled from PVGIS satellite data for Richmond upon Thames' own coordinates (51.44602, -0.32393), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.
Who runs the grid in Richmond upon Thames
UK Power Networks owns and runs the local electricity network in Richmond upon Thames, as part of its South East England licence area.
What decides the paperwork is the inverter and battery output, not the number of panels. Up to 3.68kW per phase, a system follows G98: UK Power Networks is notified within 28 days of commissioning and nothing has to be approved first.
Anything bigger is a G99 case and is applied for first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Beyond the panels: heating and car charging in Richmond upon Thames
A heat pump in Richmond upon Thames
A heat pump does most of its work from November to February. Over those four months, 12 panels in Richmond upon Thames make about 1,110 kWh, against 3,080 kWh from May to August, so winter heating runs mostly on grid electricity and the tariff matters more than the roof.
The Boiler Upgrade Scheme, open in England and Wales, takes £7,500 off an air source or ground source heat pump, or £2,500 off an air-to-air unit. Homes on oil or LPG with no mains gas get £1,500 more until March 2027 (gov.uk, checked 28 September 2026).
Charging an EV in Richmond upon Thames
From April to September, 68% of a Richmond upon Thames roof's yearly output arrives, peaking at about 800 kWh in July on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.
Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.
The packages, priced before anyone visits
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Richmond upon Thames
Faults, servicing and ageing inverters follow the same economics in Richmond upon Thames as anywhere else, and the guides below price them plainly.
Solar in Richmond upon Thames: your questions answered
What does a solar panel system produce in Richmond upon Thames?
Each kWp of panels in Richmond upon Thames makes 1,024 kWh a year on PVGIS figures, so a typical 12-panel system produces around 6,510 kWh, from about 230 kWh in December up to 800 kWh in July.
How much are solar panels in Richmond upon Thames?
The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in Richmond upon Thames before a battery. What Richmond upon Thames changes is the return, about 6,510 kWh a year from that system, and your design call prices your actual roof.
Would a system in Richmond upon Thames need approval from the network operator?
Richmond upon Thames is on UK Power Networks' network (South East England licence area). Systems up to 3.68kW per phase of inverter output follow G98: UK Power Networks is notified within 28 days of commissioning, with no approval needed first. Anything larger needs a G99 application before installation. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator. Our G98 vs G99 guide explains both routes.
How much can I earn from exporting solar in Richmond upon Thames?
With typical use and no battery, a 12-panel system in Richmond upon Thames exports about 5,576 kWh a year. At 12p per kWh that is roughly £669; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.
Is solar worth it in Richmond upon Thames in winter?
It works, but the year is lopsided. 68% of a Richmond upon Thames roof's output lands between April and September; the four months from November to February give about 1,110 kWh on a 12-panel system. Payback is worked out on the whole year, not the winter.
How Richmond upon Thames compares with its neighbours
The six closest towns we publish, run through the identical PVGIS query as Richmond upon Thames.
| Town | kWh per kWp a year | vs Richmond upon Thames |
|---|---|---|
| Richmond upon Thames | 1,024 | this town |
| Hounslow | 1,032 | +8 kWh |
| Kingston upon Thames | 1,018 | −6 kWh |
| West Molesey | 1,019 | −5 kWh |
| Sunbury-on-Thames | 1,024 | level |
| Ealing | 1,028 | +4 kWh |
| Ashford Common | 1,024 | level |
Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.
Also for Richmond upon Thames: Solar panels in Richmond upon Thames from OVO Solar & Battery
Also near Richmond upon Thames
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Guides worth reading before your call
Sourced, dated and written by us. The same ground we cover on your free call.
The 0% VAT deadline: what ends on 31 March 2027, and what it costs to miss it
The install deadline is still 31 March 2027. Electricity's 0% VAT was extended to the end of June.
Read the guide →Adding a battery to solar panels you already own
Retrofitting a battery to working solar is straightforward. The paperwork is where people trip up.
Read the guide →How solar aware EV charging actually works
The CT clamp, the surplus tracking and the 1.4kW floor that catches people out.
Read the guide →Sizing a heat pump: what a proper survey covers
Sized by calculation, not by rule of thumb. What the survey covers, and what guessing costs.
Read the guide →The price cap explained, and what it does to solar payback
The cap limits unit rates, not bills. That changes what solar payback means.
Read the guide →How to check an MCS certificate is genuine, before the deposit leaves your account
A logo proves nothing. Certification is business specific, technology specific and checkable.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.