Solar panels in West Molesey, with the numbers shown.
A 12-panel roof in West Molesey makes about 6,480 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
What a roof in West Molesey can generate
From 35.5 kWh per kWp in December to 125.8 in July: a roof in West Molesey makes 3.5 times as much in its best month as in its darkest, and 1,019 kWh per kWp across the year.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 38.4 |
| February | 51.3 |
| March | 87.2 |
| April | 115 |
| May | 123 |
| June | 124 |
| July | 126 |
| August | 111 |
| September | 96 |
| October | 66.4 |
| November | 46.1 |
| December | 35.5 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
For scale: 1,019 kWh per kWp in West Molesey against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts West Molesey 10% above it.
How West Molesey compares
Among the places we publish figures for, West Molesey is one of 47 Surrey towns we track, and it ranks joint 33rd of 47 for solar yield. It is a medium town in the House of Commons Library classification, with 46,837 residents, and its roofs see 2.79 peak sun hours a day across the year. That drives the standard 12 panel model to 6,481 kWh of generation, of which around 5,544 kWh is exported at 12p for £665 a year, with £247 saved on electricity you would otherwise buy at 26.32p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on West Molesey's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
West Molesey sits within Elmbridge, its local planning authority, and the House of Commons Library classes it as a medium town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for West Molesey at 51.38569, -0.34453 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
Connecting solar to the West Molesey network
West Molesey sits in UK Power Networks' South East England licence area, so UK Power Networks is the network operator (DNO) any solar panels or battery here are registered with.
G98 is the simple route. If the inverter, plus any battery, stays at or under 3.68kW per phase, UK Power Networks only has to be told within 28 days after the system is commissioned.
A bigger inverter or battery output needs a G99 application in advance. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in West Molesey
A heat pump in West Molesey
Solar and a heat pump pull in opposite directions through the year: West Molesey's roofs make 1,090 kWh from November to February on a 12-panel system, and 3,070 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.
The Boiler Upgrade Scheme, open in England and Wales, takes £7,500 off an air source or ground source heat pump, or £2,500 off an air-to-air unit. Homes on oil or LPG with no mains gas get £1,500 more until March 2027 (gov.uk, checked 28 September 2026).
Charging an EV in West Molesey
From April to September, 68% of a West Molesey roof's yearly output arrives, peaking at about 800 kWh in July on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in West Molesey
Guidance is nationwide, so the benchmarks hold in West Molesey: repair costs, service scope, and when the inverter is the real fault.
Solar in West Molesey: your questions answered
What could a roof in West Molesey generate?
PVGIS puts a roof in West Molesey at 1,019 kWh per kWp a year, 2.79 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 6,480 kWh a year, most of it between April and September.
What would 12 solar panels cost in West Molesey?
£6,360 for 12 panels (6.36 kWp), the same as in every other place we cover, because solar is priced at £1,000 per kWp installed rather than by area. A battery adds its own installed price on top. Where West Molesey differs is output: about 6,480 kWh a year from that system.
Do I need permission from the DNO for solar in West Molesey?
Usually not in advance. UK Power Networks, the network operator for West Molesey, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator. "See our DNO explainer.
How much would export pay on a system in West Molesey?
It is exported. With typical use and no battery, about 5,544 kWh of the 6,480 kWh a 12-panel system makes in West Molesey goes to the grid, around £665 a year at 12p. A battery keeps more of it for the evening; the export rates table shows what suppliers pay.
Do solar panels work in winter in West Molesey?
Yes, at a lower level. PVGIS gives West Molesey 35.5 kWh per kWp in December and 38.4 in January, so a 12-panel system makes about 230 kWh and 240 kWh in those months, against 800 kWh in July. Winter output mostly covers daytime use rather than exporting.
How West Molesey compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs West Molesey |
|---|---|---|
| West Molesey | 1,019 | this town |
| Esher | 1,024 | +5 kWh |
| Kingston upon Thames | 1,018 | −1 kWh |
| Walton-on-Thames | 1,025 | +6 kWh |
| Hersham | 1,025 | +6 kWh |
| Sunbury-on-Thames | 1,024 | +5 kWh |
| Cobham | 1,025 | +6 kWh |
Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.
Also for West Molesey: Solar panels in West Molesey from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for West Molesey
Sourced, dated and written by us. The same ground we cover on your free call.
Do solar panels need direct sunlight? Not really, and here is why
No. Solar cells respond to light hitting them, not to a clear line of sight to the sun.
Read the guide →How much a battery saves by charging on cheap night rates
What charging at 8.5p and using at 26.32p is actually worth over a year.
Read the guide →What an EV charger installation actually involves
Main fuse, DNO notification, load balancing and the paperwork. What really happens.
Read the guide →Do you need to replace your radiators for a heat pump?
Some change, most do not. The room by room arithmetic that decides which.
Read the guide →Why tariff choice moves payback more than kit choice
Identical kit, five times the export income. The tariff decision worked through with August 2026 rates.
Read the guide →NAPIT, NICEIC and competent person schemes: who tells building control about your solar
Solar work is notifiable. A competent person scheme means your installation team notifies, not you.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.