Solar panels in St Neots, designed on a free call.
Twelve panels (6.36 kWp) here make about 6,530 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
How much a St Neots roof makes, month by month
St Neots' best month is July, at 124 kWh per kWp; December manages 37.4. Over the year that comes to 1,026 kWh per kWp, 1% below our Huntingdonshire county estimate.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 38.9 |
| February | 54.5 |
| March | 88.8 |
| April | 114 |
| May | 123 |
| June | 123 |
| July | 124 |
| August | 111 |
| September | 96.2 |
| October | 67.6 |
| November | 47.7 |
| December | 37.4 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Against Great Britain as a whole: St Neots makes 1,026 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so St Neots is 11% above it.
How St Neots compares
Among the places we publish figures for, St Neots is one of 5 Huntingdonshire towns we track, and it ranks 5th of 5 for solar yield. It is a medium town in the House of Commons Library classification, with 34,758 residents, and its roofs see 2.81 peak sun hours a day across the year. That drives the standard 12 panel model to 6,525 kWh of generation, of which around 5,589 kWh is exported at 12p for £671 a year, with £247 saved on electricity you would otherwise buy at 26.32p.
These are starting numbers, not a quote. The calculator below opens on St Neots' own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.
Planning applications here go through Huntingdonshire; nationally, the House of Commons Library classes St Neots as a medium town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Generation is modelled from PVGIS satellite data for St Neots' own coordinates (52.2229, -0.27067), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.
The network operator for St Neots
St Neots sits in UK Power Networks' East England licence area, so UK Power Networks is the network operator (DNO) any solar panels or battery here are registered with.
G98 is the simple route. If the inverter, plus any battery, stays at or under 3.68kW per phase, UK Power Networks only has to be told within 28 days after the system is commissioned.
Above that, G99 means applying before the work is booked. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Adding a heat pump or an EV charger in St Neots
A heat pump in St Neots
Heating demand peaks when solar is weakest. In St Neots, a 12-panel system makes about 240 kWh in December and 250 kWh in January, a fraction of its 790 kWh in July, which is why a heat pump here is costed on its tariff first.
In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).
Charging an EV in St Neots
St Neots' July output, about 790 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
The packages, priced before anyone visits
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in St Neots
The same sourced benchmarks apply in St Neots as everywhere we cover: honest repair pricing and what a service should include.
St Neots solar questions
How much electricity do solar panels make in St Neots?
About 6,530 kWh a year from 12 panels (6.36 kWp), on PVGIS satellite data for St Neots: 1,026 kWh per kWp, or 2.81 peak sun hours a day on average. July is the strongest month, at about 790 kWh.
Is solar more expensive in St Neots?
Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in St Neots, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,530 kWh a year here, which is what drives payback.
Which DNO covers St Neots, and what does it need from me?
UK Power Networks covers St Neots. A home system of up to 3.68kW per phase is notified to UK Power Networks within 28 days of commissioning under G98, and nothing waits on approval. Larger outputs need a G99 application before work starts. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.
What could I earn from exporting in St Neots?
On the 12p export scenario, a 12-panel system in St Neots sends about 5,589 kWh a year to the grid, worth around £671. The export rates table compares what each supplier pays.
How much solar does St Neots get in December?
December is the low point: about 240 kWh from a 12-panel system in St Neots, on PVGIS data, rising to 790 kWh in July. From November to February the same system makes about 1,140 kWh in total, which is why a battery charged off-peak does more of the work in winter.
How St Neots compares with its neighbours
How the towns nearest St Neots compare on the same PVGIS settings, closest first.
| Town | kWh per kWp a year | vs St Neots |
|---|---|---|
| St Neots | 1,026 | this town |
| Sandy | 1,029 | +3 kWh |
| Godmanchester | 1,039 | +13 kWh |
| Cambourne | 1,036 | +10 kWh |
| Huntingdon | 1,039 | +13 kWh |
| Biggleswade | 1,029 | +3 kWh |
| Bedford | 1,028 | +2 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
Also for St Neots: Solar panels in St Neots from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for St Neots homeowners
Sourced, dated and written by us. The same ground we cover on your free call.
Do solar panels increase home value? What the actual data shows
The largest UK study found a 6.1% to 7.1% sale price premium. Here is the full picture.
Read the guide →Sigenergy SigenStor review: the 5-in-1 tower examined
The 5-in-1 tower reviewed by a site that does not sell it, warranty arithmetic included.
Read the guide →Three phase and EV charging: what actually changes
Three phase buys 22kW charging. Most cars cannot use it, and load balancing usually solves the real problem.
Read the guide →Are heat pumps noisy? The 37 dB(A) answer, in plain terms
The 1 metre boundary rule is gone. A 37 dB(A) sound test replaced it.
Read the guide →The price cap explained, and what it does to solar payback
The cap limits unit rates, not bills. That changes what solar payback means.
Read the guide →G98 or G99: which one applies, what the application involves, and how long it takes
The G98 line sits at 3.68kW per phase. Above it, your network operator has to say yes first.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.