Solar panels in Cambourne, sized to your roof.
About 6,590 kWh a year from 12 panels in Cambourne, £6,360 installed, with your system designed on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Cambourne's solar year
PVGIS puts Cambourne at 1,036 kWh per kWp a year, level with our Cambridgeshire county estimate. 67% of it arrives between April and September, peaking in July.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 39.7 |
| February | 55.5 |
| March | 89.7 |
| April | 115 |
| May | 123 |
| June | 123 |
| July | 125 |
| August | 111 |
| September | 98.1 |
| October | 68.9 |
| November | 48.8 |
| December | 37.4 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 1,036, Cambourne is 12% above it.
How Cambourne compares
Small towns rarely get published solar figures, so here are the numbers for Cambourne. It is one of 11 Cambridgeshire towns we track, and it ranks 6th of 11 for solar yield, a town of 12,143 people in the House of Commons Library settlement data. PVGIS gives its roofs 1,036 kWh per kWp a year, 2.84 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £925 of year one benefit, £247 of it from your own generation and £678 from export at 12p.
Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on Cambourne's own yield.
South Cambridgeshire is the planning authority covering Cambourne, which the House of Commons Library classes as a small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Generation is modelled from PVGIS satellite data for Cambourne's own coordinates (52.21779, -0.06822), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.
Who runs the grid in Cambourne
On NESO's licence-area map, Cambourne is in East England, which UK Power Networks operates. That makes UK Power Networks the network operator for any system fitted here.
Most home systems stay within 3.68kW per phase of inverter output, which puts them on G98, a notification to UK Power Networks within 28 days of switch-on. Panel count does not decide it; the inverter and any battery do.
A bigger inverter or battery output needs a G99 application in advance. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Beyond the panels: heating and car charging in Cambourne
A heat pump in Cambourne
A heat pump does most of its work from November to February. Over those four months, 12 panels in Cambourne make about 1,150 kWh, against 3,070 kWh from May to August, so winter heating runs mostly on grid electricity and the tariff matters more than the roof.
In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).
Charging an EV in Cambourne
A 12-panel roof in Cambourne makes about 790 kWh in July. A typical home uses around 70 kWh of that in daylight (the calculator's typical-use settings), which leaves most of the month's output for an EV or for export.
Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.
Installed prices, the same in every town
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Cambourne
Faults, servicing and ageing inverters follow the same economics in Cambourne as anywhere else, and the guides below price them plainly.
Common questions about solar in Cambourne
What does a solar panel system produce in Cambourne?
Each kWp of panels in Cambourne makes 1,036 kWh a year on PVGIS figures, so a typical 12-panel system produces around 6,590 kWh, from about 240 kWh in December up to 790 kWh in July.
What would 12 solar panels cost in Cambourne?
£6,360 for 12 panels (6.36 kWp), the same as in every other place we cover, because solar is priced at £1,000 per kWp installed rather than by area. A battery adds its own installed price on top. Where Cambourne differs is output: about 6,590 kWh a year from that system.
Would a system in Cambourne need approval from the network operator?
Cambourne is on UK Power Networks' network (East England licence area). Systems up to 3.68kW per phase of inverter output follow G98: UK Power Networks is notified within 28 days of commissioning, with no approval needed first. Anything larger needs a G99 application before installation. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator. Our G98 vs G99 guide explains both routes.
How much would export pay on a system in Cambourne?
It is exported. With typical use and no battery, about 5,652 kWh of the 6,590 kWh a 12-panel system makes in Cambourne goes to the grid, around £678 a year at 12p. A battery keeps more of it for the evening; the export rates table shows what suppliers pay.
Is solar worth it in Cambourne in winter?
It works, but the year is lopsided. 67% of a Cambourne roof's output lands between April and September; the four months from November to February give about 1,150 kWh on a 12-panel system. Payback is worked out on the whole year, not the winter.
How Cambourne compares with its neighbours
How the towns nearest Cambourne compare on the same PVGIS settings, closest first.
| Town | kWh per kWp a year | vs Cambourne |
|---|---|---|
| Cambourne | 1,036 | this town |
| Histon and Impington | 1,037 | +1 kWh |
| Godmanchester | 1,039 | +3 kWh |
| St Ives | 1,038 | +2 kWh |
| St Neots | 1,026 | −10 kWh |
| Cambridge | 1,037 | +1 kWh |
| Huntingdon | 1,039 | +3 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
Also for Cambourne: Solar panels in Cambourne from OVO Solar & Battery
Also near Cambourne
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Cambourne homeowners
Sourced, dated and written by us. The same ground we cover on your free call.
Solar installation day: exactly what happens, hour by hour
The week before, the day itself hour by hour, and the paperwork that follows.
Read the guide →Inside a home battery: capacity, power and losses
Usable capacity, kW output, round trip losses and chemistry, in plain terms.
Read the guide →Home EV charger types and speeds, explained properly
Granny cable, 7kW wall unit or 22kW three phase. What each adds per hour, and which you need.
Read the guide →Sizing a heat pump: what a proper survey covers
Sized by calculation, not by rule of thumb. What the survey covers, and what guessing costs.
Read the guide →Will energy prices keep rising, and by how much
The January forecasts jumped fast. What is confirmed, what is guessed, and whether solar is a real hedge.
Read the guide →G98 or G99: which one applies, what the application involves, and how long it takes
The G98 line sits at 3.68kW per phase. Above it, your network operator has to say yes first.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.