Solar panels in Stockton-on-Tees, priced before anyone visits.
Twelve panels (6.36 kWp) here make about 6,010 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
How much a Stockton-on-Tees roof makes, month by month
PVGIS puts Stockton-on-Tees at 945 kWh per kWp a year, 1% above our Durham county estimate. 69% of it arrives between April and September, peaking in May.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 32.9 |
| February | 49.9 |
| March | 83 |
| April | 109 |
| May | 121 |
| June | 112 |
| July | 117 |
| August | 104 |
| September | 86.6 |
| October | 59.4 |
| November | 41.1 |
| December | 30.6 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 945, Stockton-on-Tees is 2% above it.
How Stockton-on-Tees compares
Stockton-on-Tees is one of 35 Durham towns we track, and it ranks joint 17th of 35 for solar yield. The House of Commons Library settlement data classes it as a large town of 89,818 people. At 945 kWh per kWp a year, a typical 12 panel system here pays for itself in around 7.4 years on the 12p scenario: £855 of year one benefit against £6,360 installed, £247 of that benefit from cutting 26.32p imports with your own generation.
These are starting numbers, not a quote. The calculator below opens on Stockton-on-Tees' own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.
Stockton-on-Tees is its own local planning authority area, and its House of Commons Library settlement class is large town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Generation is modelled from PVGIS satellite data for Stockton-on-Tees' own coordinates (54.57214, -1.32944), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.
The network operator for Stockton-on-Tees
Northern Powergrid owns and runs the local electricity network in Stockton-on-Tees, as part of its North East England licence area.
For a typical home the paperwork is light: a system of up to 3.68kW per phase goes through G98, which means Northern Powergrid is notified within 28 days of switch-on rather than asked beforehand.
Larger systems go through G99 instead, applied for before installation. On timing: Northern Powergrid publishes a guaranteed standard of 45 working days to quote for a low voltage generation connection.
Sources: NESO DNO licence areas (3 May 2024); Northern Powergrid, generation connections page, checked 25 September 2026. G98 vs G99, explained.

Adding a heat pump or an EV charger in Stockton-on-Tees
A heat pump in Stockton-on-Tees
Heating demand peaks when solar is weakest. In Stockton-on-Tees, a 12-panel system makes about 190 kWh in December and 210 kWh in January, a fraction of its 770 kWh in May, which is why a heat pump here is costed on its tariff first.
In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).
Charging an EV in Stockton-on-Tees
Summer is where a car earns its place. In May, 12 panels in Stockton-on-Tees make about 770 kWh, against roughly 70 kWh a typical home uses in daylight that month on our calculator's typical-use settings, so there is surplus a smart charger can put into the car instead of exporting it.
Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Stockton-on-Tees
The same sourced benchmarks apply in Stockton-on-Tees as everywhere we cover: honest repair pricing and what a service should include.
Common questions about solar in Stockton-on-Tees
How much electricity do solar panels make in Stockton-on-Tees?
About 6,010 kWh a year from 12 panels (6.36 kWp), on PVGIS satellite data for Stockton-on-Tees: 945 kWh per kWp, or 2.59 peak sun hours a day on average. May is the strongest month, at about 770 kWh.
What does a typical solar system cost in Stockton-on-Tees?
Solar is priced at £1,000 per kWp installed wherever you live, so a 12-panel, 6.36 kWp system costs £6,360 in Stockton-on-Tees, exactly as it would anywhere else, before any battery. Location changes what the system makes, not what it costs: here that is about 6,010 kWh a year. The final figure comes from your roof on the design call.
Which DNO covers Stockton-on-Tees, and what does it need from me?
Northern Powergrid covers Stockton-on-Tees. A home system of up to 3.68kW per phase is notified to Northern Powergrid within 28 days of commissioning under G98, and nothing waits on approval. Larger outputs need a G99 application before work starts. Northern Powergrid publishes a guaranteed standard of 45 working days to quote for a low voltage generation connection.
What happens to the solar I do not use in Stockton-on-Tees?
Around £609 a year at 12p per kWh, for the roughly 5,074 kWh a 12-panel system in Stockton-on-Tees exports with typical use. Rates vary by supplier and some need their own tariff; the export rates table is dated and sourced.
How much solar does Stockton-on-Tees get in December?
December is the low point: about 190 kWh from a 12-panel system in Stockton-on-Tees, on PVGIS data, rising to 770 kWh in May. From November to February the same system makes about 980 kWh in total, which is why a battery charged off-peak does more of the work in winter.
How Stockton-on-Tees compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs Stockton-on-Tees |
|---|---|---|
| Stockton-on-Tees | 945 | this town |
| Thornaby-on-Tees | 938 | −7 kWh |
| Billingham | 947 | +2 kWh |
| Egglescliffe | 941 | −4 kWh |
| Ingleby Barwick | 942 | −3 kWh |
| Middlesbrough | 939 | −6 kWh |
| Yarm | 921 | −24 kWh |
Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.
Also for Stockton-on-Tees: Solar panels in Stockton-on-Tees from OVO Solar & Battery
Also near Stockton-on-Tees
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for Stockton-on-Tees
Sourced, dated and written by us. The same ground we cover on your free call.
Solar panel types, and the four numbers that actually matter
TOPCon, HJT and back contact decoded, plus the four numbers worth comparing.
Read the guide →Inside a home battery: capacity, power and losses
Usable capacity, kW output, round trip losses and chemistry, in plain terms.
Read the guide →How time of use charging windows actually work
How a cheap overnight window is metered and billed, and what a battery does inside it.
Read the guide →Do you need to replace your radiators for a heat pump?
Some change, most do not. The room by room arithmetic that decides which.
Read the guide →Why the best export rates always carry conditions
The top export rates are acquisition offers. Here is how to price the condition.
Read the guide →G98 or G99: which one applies, what the application involves, and how long it takes
The G98 line sits at 3.68kW per phase. Above it, your network operator has to say yes first.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.