0% VAT on solar panels and batteries ends 31 March 2027. What it means for you

07782 219224

Berkshire

Solar panels in Wantage, designed on a free call.

Twelve panels (6.36 kWp) here make about 6,560 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.

Get my free quote

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation. We call or text within one working day.

Your design call is with Niall or Vince, our residential energy consultants.

or call 07782 219224

  • Free 30-minute video design call
  • Priced before anyone visits
  • Installed by our MCS-certified, fully insured teams
Sunlight in Wantage

How much a Wantage roof makes, month by month

From 37.2 kWh per kWp in December to 125.4 in July: a roof in Wantage makes 3.4 times as much in its best month as in its darkest, and 1,031 kWh per kWp across the year.

Map showing Wantage in Berkshire A simplified outline map of Berkshire with neighbouring counties shown faintly, and a pin marking the location of Wantage.
Wantage in Berkshire

Generation per kWp, month by month

Wantage, 1,031 kWh per kWp a year
Wantage, monthly generation per kWp Bar chart, twelve months January to December. Peak July at 125 kWh/kWp. Lowest December at 37.2 kWh/kWp. Full values are in the table below this chart. 144 0 JFMAMJJASOND 125
Show the monthly figures
Wantage, monthly generation per kWp - monthly figures (kWh/kWp)
MonthkWh/kWp
January40.4
February52.8
March90.7
April116
May124
June123
July125
August112
September96.8
October67.1
November45.6
December37.2

Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.

6,560kWh a year, 12 panels
800kWh in July, the peak
240kWh in December

Against Great Britain as a whole: Wantage makes 1,031 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so Wantage is 11% above it.

How Wantage compares

Small towns rarely get published solar figures, so here are the numbers for Wantage. It is one of 20 Berkshire towns we track, and it ranks 4th of 20 for solar yield, a town of 14,568 people in the House of Commons Library settlement data. PVGIS gives its roofs 1,031 kWh per kWp a year, 2.82 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £921 of year one benefit, £247 of it from your own generation and £674 from export at 12p.

Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Wantage's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.

Any planning application in Wantage sits with Vale of White Horse, and its official House of Commons Library settlement class is small town.

12 panels
530W panels. Most semi-detached roofs take 10 to 16 on one pitch.
Add a battery?
Installed prices. The named packages are the ones running on our current offers; the Duracell prices are for an installation alongside solar.
Electricity use
Export rate scenario
EV charger?
Estimated benefit, year one
£921
£77 a month · payback 6.9 yrs
System price, installed
£6,360
Simple payback
6.9 yrs
Generates a year
6,557 kWh
Exported
5,620 kWh at 12p
Where the money comes from
Solar you use, Export income, Off-peak shifting,

Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.

Price this for your roof

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation, nobody visits your home. Prefer to talk? 07782 219224

Your design call is with Niall or Vince, our residential energy consultants.

The figures use PVGIS for the centre of Wantage (51.5914, -1.42383), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.

Local grid

The network operator for Wantage

The distribution network operator (DNO) for Wantage is Scottish and Southern Electricity Networks (SSEN), which runs the Southern England licence area.

For a typical home the paperwork is light: a system of up to 3.68kW per phase goes through G98, which means SSEN is notified within 28 days of switch-on rather than asked beforehand.

Above that, G99 means applying before the work is booked. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW.

Sources: NESO DNO licence areas (3 May 2024); SSEN, micro-generation connections page, checked 25 September 2026. G98 vs G99, explained.

Aerial view of a modern chalet-style house with black solar panels on two roof faces and a flat-roof array
Black panels across two roof faces and a flat-roof array on a modern chalet-style home.
Beyond solar

Heat pumps and EV charging in Wantage

A heat pump in Wantage

Heating demand peaks when solar is weakest. In Wantage, a 12-panel system makes about 240 kWh in December and 260 kWh in January, a fraction of its 800 kWh in July, which is why a heat pump here is costed on its tariff first.

The Boiler Upgrade Scheme, open in England and Wales, takes £7,500 off an air source or ground source heat pump, or £2,500 off an air-to-air unit. Homes on oil or LPG with no mains gas get £1,500 more until March 2027 (gov.uk, checked 28 September 2026).

How heat pumps work

Charging an EV in Wantage

Wantage's July output, about 800 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.

If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.

EV charging explained

FAQs

Solar in Wantage: your questions answered

How much electricity do solar panels make in Wantage?

About 6,560 kWh a year from 12 panels (6.36 kWp), on PVGIS satellite data for Wantage: 1,031 kWh per kWp, or 2.82 peak sun hours a day on average. July is the strongest month, at about 800 kWh.

Is solar more expensive in Wantage?

Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Wantage, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,560 kWh a year here, which is what drives payback.

Which DNO covers Wantage, and what does it need from me?

Scottish and Southern Electricity Networks (SSEN) covers Wantage. A home system of up to 3.68kW per phase is notified to SSEN within 28 days of commissioning under G98, and nothing waits on approval. Larger outputs need a G99 application before work starts. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW.

What could I earn from exporting in Wantage?

On the 12p export scenario, a 12-panel system in Wantage sends about 5,620 kWh a year to the grid, worth around £674. The export rates table compares what each supplier pays.

How much solar does Wantage get in December?

December is the low point: about 240 kWh from a 12-panel system in Wantage, on PVGIS data, rising to 800 kWh in July. From November to February the same system makes about 1,120 kWh in total, which is why a battery charged off-peak does more of the work in winter.

How Wantage compares with its neighbours

Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.

TownkWh per kWp a yearvs Wantage
Wantage1,031this town
Grove1,034+3 kWh
Didcot1,040+9 kWh
Faringdon1,030−1 kWh
Abingdon-on-Thames1,027−4 kWh
Wallingford1,017−14 kWh
Highworth1,018−13 kWh

Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.

Also for Wantage: Solar panels in Wantage from OVO Solar & Battery

All of Berkshire

Instant estimate

See a number before you speak to anyone

Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.

Free, no obligation

Get my free quote

Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.

Installations can only go ahead for homeowners, as the system is fixed to the property. Do carry on if you own it, or you are about to.
Flats and apartments usually share a roof, which rules most installations out. Send your details anyway and we will tell you honestly what is possible.
1 Where is your home?
Please add your full postcode
Please add your house number
2 About you
Please add your first name
Please add your last name
Please add a UK number
Please add a valid email
3 Your property
Do you own your home?
Please let us know
Property type
Please choose your property type
4 What are you after?
Please pick one, "not sure" is fine
Roughly is fine
Please choose a timeframe
5 When shall we call?
Best time for you (optional, but it helps)

We never call after 8pm.

We call or text within one working day to book your free 30-minute video design call. Free, no obligation, wherever you are in Wantage. No home visit needed.

Your design call is with Niall or Vince, our residential energy consultants.

Call 07782 219224

By submitting you agree we can contact you about your enquiry. We never sell your details and never pass them to a panel of companies to ring you. See our privacy notice.