Solar panels in Wallingford, designed on a free call.
A 12-panel roof in Wallingford makes about 6,470 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Sunlight in Wallingford, in numbers
Wallingford's best month is July, at 124.7 kWh per kWp; December manages 34.3. Over the year that comes to 1,017 kWh per kWp, level with our Berkshire county estimate.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 40 |
| February | 52.5 |
| March | 88.7 |
| April | 116 |
| May | 122 |
| June | 122 |
| July | 125 |
| August | 110 |
| September | 95.5 |
| October | 65.7 |
| November | 45.2 |
| December | 34.3 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Against Great Britain as a whole: Wallingford makes 1,017 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so Wallingford is 10% above it.
How Wallingford compares
Small towns rarely get published solar figures, so here are the numbers for Wallingford. It is one of 20 Berkshire towns we track, and it ranks joint 15th of 20 for solar yield, a town of 8,735 people in the House of Commons Library settlement data. PVGIS gives its roofs 1,017 kWh per kWp a year, 2.79 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £911 of year one benefit, £247 of it from your own generation and £664 from export at 12p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Wallingford's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Any planning application in Wallingford sits with South Oxfordshire, and its official House of Commons Library settlement class is small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
The figures use PVGIS for the centre of Wallingford (51.60038, -1.13196), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.
SSEN and your Wallingford connection
Wallingford sits in Scottish and Southern Electricity Networks' Southern England licence area, so SSEN is the network operator (DNO) any solar panels or battery here are registered with.
G98 is the simple route. If the inverter, plus any battery, stays at or under 3.68kW per phase, SSEN only has to be told within 28 days after the system is commissioned.
Above that, G99 means applying before the work is booked. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW.
Sources: NESO DNO licence areas (3 May 2024); SSEN, micro-generation connections page, checked 25 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Wallingford
A heat pump in Wallingford
In December, the darkest month here, 12 panels in Wallingford make about 220 kWh. That is when a heat pump runs hardest, so its running cost in Wallingford comes down to the tariff and the flow temperature rather than the roof.
In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).
Charging an EV in Wallingford
Wallingford's July output, about 790 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
Installed prices, the same in every town
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Wallingford
The same sourced benchmarks apply in Wallingford as everywhere we cover: honest repair pricing and what a service should include.
Wallingford solar questions
How much electricity do solar panels make in Wallingford?
About 6,470 kWh a year from 12 panels (6.36 kWp), on PVGIS satellite data for Wallingford: 1,017 kWh per kWp, or 2.79 peak sun hours a day on average. July is the strongest month, at about 790 kWh.
Is solar more expensive in Wallingford?
Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Wallingford, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,470 kWh a year here, which is what drives payback.
Which DNO covers Wallingford, and what does it need from me?
Scottish and Southern Electricity Networks (SSEN) covers Wallingford. A home system of up to 3.68kW per phase is notified to SSEN within 28 days of commissioning under G98, and nothing waits on approval. Larger outputs need a G99 application before work starts. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW.
What could I earn from exporting in Wallingford?
On the 12p export scenario, a 12-panel system in Wallingford sends about 5,531 kWh a year to the grid, worth around £664. The export rates table compares what each supplier pays.
How much solar does Wallingford get in December?
December is the low point: about 220 kWh from a 12-panel system in Wallingford, on PVGIS data, rising to 790 kWh in July. From November to February the same system makes about 1,090 kWh in total, which is why a battery charged off-peak does more of the work in winter.
How Wallingford compares with its neighbours
The six closest towns we publish, run through the identical PVGIS query as Wallingford.
| Town | kWh per kWp a year | vs Wallingford |
|---|---|---|
| Wallingford | 1,017 | this town |
| Didcot | 1,040 | +23 kWh |
| Abingdon-on-Thames | 1,027 | +10 kWh |
| Henley-on-Thames | 1,019 | +2 kWh |
| Caversham | 1,025 | +8 kWh |
| Oxford | 1,022 | +5 kWh |
| Chinnor | 1,005 | −12 kWh |
PVGIS v5.2 for each town centroid, identical assumptions throughout. A few kWh either way is weather-year noise; a spread beyond about 30 kWh per kWp is real geography.
Also for Wallingford: Solar panels in Wallingford from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Guides worth reading before your call
Sourced, dated and written by us. The same ground we cover on your free call.
DNO application timescales, network by network: from a G98 notification to a G99 approval
Fit and notify within 28 days, or wait ten working days to 45 for a yes. System size decides which.
Read the guide →Tesla Powerwall 3 vs Duracell Dura16: which fits your home?
The two packages we actually price, compared on the numbers that decide it.
Read the guide →What it really costs to charge an EV at home versus in public
Home off-peak charging costs a fraction of the public price. The arithmetic, and the tariff it depends on.
Read the guide →Are heat pumps worth it? The real 2026 numbers
Electricity costs 3.3x gas per kWh. A heat pump is about 3x as efficient. The numbers nearly cancel out.
Read the guide →Why tariff choice moves payback more than kit choice
Identical kit, five times the export income. The tariff decision worked through with August 2026 rates.
Read the guide →NAPIT, NICEIC and competent person schemes: who tells building control about your solar
Solar work is notifiable. A competent person scheme means your installation team notifies, not you.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.