0% VAT on solar panels and batteries ends 31 March 2027. What it means for you

07782 219224

Surrey

Solar panels in West Byfleet, Sheerwater and New Haw.

Twelve panels here make about 6,530 kWh a year for £6,360 installed, designed on a free 30-minute video call.

Get my free quote

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation. We call or text within one working day.

Your design call is with Niall or Vince, our residential energy consultants.

or call 07782 219224

  • Free 30-minute video design call
  • Priced before anyone visits
  • Installed by our MCS-certified, fully insured teams
Sunlight in West Byfleet, Sheerwater and New Haw

West Byfleet, Sheerwater and New Haw's solar year

West Byfleet, Sheerwater and New Haw's best month is July, at 126.7 kWh per kWp; December manages 36.1. Over the year that comes to 1,026 kWh per kWp, level with our Surrey county estimate.

Map showing West Byfleet, Sheerwater and New Haw in Surrey A simplified outline map of Surrey with neighbouring counties shown faintly, and a pin marking the location of West Byfleet, Sheerwater and New Haw.
West Byfleet, Sheerwater and New Haw in Surrey

Generation per kWp, month by month

West Byfleet, Sheerwater and New Haw, 1,026 kWh per kWp a year
West Byfleet, Sheerwater and New Haw, monthly generation per kWp Bar chart, twelve months January to December. Peak July at 127 kWh/kWp. Lowest December at 36.1 kWh/kWp. Full values are in the table below this chart. 146 0 JFMAMJJASOND 127
Show the monthly figures
West Byfleet, Sheerwater and New Haw, monthly generation per kWp - monthly figures (kWh/kWp)
MonthkWh/kWp
January39.2
February52.5
March87.7
April115
May123
June124
July127
August112
September96.2
October67.1
November46.3
December36.1

Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.

6,530kWh a year, 12 panels
810kWh in July, the peak
230kWh in December

Against Great Britain as a whole: West Byfleet, Sheerwater and New Haw makes 1,026 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so West Byfleet, Sheerwater and New Haw is 11% above it.

How West Byfleet, Sheerwater and New Haw compares

Among the places we publish figures for, West Byfleet, Sheerwater and New Haw is one of 47 Surrey towns we track, and it ranks 16th of 47 for solar yield. It is a medium town in the House of Commons Library classification, with 31,996 residents, and its roofs see 2.81 peak sun hours a day across the year. That drives the standard 12 panel model to 6,525 kWh of generation, of which around 5,589 kWh is exported at 12p for £671 a year, with £247 saved on electricity you would otherwise buy at 26.32p.

Treat these as calibration rather than a quote. The calculator below runs the same model, opened on West Byfleet, Sheerwater and New Haw's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.

Runnymede is the planning authority covering West Byfleet, Sheerwater and New Haw, which the House of Commons Library classes as a medium town.

12 panels
530W panels. Most semi-detached roofs take 10 to 16 on one pitch.
Add a battery?
Installed prices. The named packages are the ones running on our current offers; the Duracell prices are for an installation alongside solar.
Electricity use
Export rate scenario
EV charger?
Estimated benefit, year one
£917
£76 a month · payback 6.9 yrs
System price, installed
£6,360
Simple payback
6.9 yrs
Generates a year
6,525 kWh
Exported
5,589 kWh at 12p
Where the money comes from
Solar you use, Export income, Off-peak shifting,

Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.

Price this for your roof

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation, nobody visits your home. Prefer to talk? 07782 219224

Your design call is with Niall or Vince, our residential energy consultants.

Modelled for West Byfleet, Sheerwater and New Haw at 51.34261, -0.5129 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.

Local grid

Who runs the grid in West Byfleet, Sheerwater and New Haw

UK Power Networks owns and runs the local electricity network in West Byfleet, Sheerwater and New Haw, as part of its South East England licence area.

For a typical home the paperwork is light: a system of up to 3.68kW per phase goes through G98, which means UK Power Networks is notified within 28 days of switch-on rather than asked beforehand.

A bigger inverter or battery output needs a G99 application in advance. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.

Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Wide aerial view of a UK new-build housing estate with several homes already fitted with solar panels
A new-build estate where solar is already spreading, roof by roof.
Beyond solar

Heat pumps and EV charging in West Byfleet, Sheerwater and New Haw

A heat pump in West Byfleet, Sheerwater and New Haw

A heat pump does most of its work from November to February. Over those four months, 12 panels in West Byfleet, Sheerwater and New Haw make about 1,110 kWh, against 3,090 kWh from May to August, so winter heating runs mostly on grid electricity and the tariff matters more than the roof.

The Boiler Upgrade Scheme, open in England and Wales, takes £7,500 off an air source or ground source heat pump, or £2,500 off an air-to-air unit. Homes on oil or LPG with no mains gas get £1,500 more until March 2027 (gov.uk, checked 28 September 2026).

How heat pumps work

Charging an EV in West Byfleet, Sheerwater and New Haw

From April to September, 68% of a West Byfleet, Sheerwater and New Haw roof's yearly output arrives, peaking at about 810 kWh in July on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.

The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).

EV charging explained

Already got panels?

Solar panel servicing and repair in West Byfleet, Sheerwater and New Haw

Faults, servicing and ageing inverters follow the same economics in West Byfleet, Sheerwater and New Haw as anywhere else, and the guides below price them plainly.

FAQs

West Byfleet, Sheerwater and New Haw solar questions

What does a solar panel system produce in West Byfleet, Sheerwater and New Haw?

Each kWp of panels in West Byfleet, Sheerwater and New Haw makes 1,026 kWh a year on PVGIS figures, so a typical 12-panel system produces around 6,530 kWh, from about 230 kWh in December up to 810 kWh in July.

How much are solar panels in West Byfleet, Sheerwater and New Haw?

The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in West Byfleet, Sheerwater and New Haw before a battery. What West Byfleet, Sheerwater and New Haw changes is the return, about 6,530 kWh a year from that system, and your design call prices your actual roof.

Would a system in West Byfleet, Sheerwater and New Haw need approval from the network operator?

West Byfleet, Sheerwater and New Haw is on UK Power Networks' network (South East England licence area). Systems up to 3.68kW per phase of inverter output follow G98: UK Power Networks is notified within 28 days of commissioning, with no approval needed first. Anything larger needs a G99 application before installation. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator. Our G98 vs G99 guide explains both routes.

How much can I earn from exporting solar in West Byfleet, Sheerwater and New Haw?

With typical use and no battery, a 12-panel system in West Byfleet, Sheerwater and New Haw exports about 5,589 kWh a year. At 12p per kWh that is roughly £671; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.

Is solar worth it in West Byfleet, Sheerwater and New Haw in winter?

It works, but the year is lopsided. 68% of a West Byfleet, Sheerwater and New Haw roof's output lands between April and September; the four months from November to February give about 1,110 kWh on a 12-panel system. Payback is worked out on the whole year, not the winter.

How West Byfleet, Sheerwater and New Haw compares with its neighbours

How the towns nearest West Byfleet, Sheerwater and New Haw compare on the same PVGIS settings, closest first.

TownkWh per kWp a yearvs West Byfleet, Sheerwater and New Haw
West Byfleet, Sheerwater and New Haw1,026this town
Addlestone1,024−2 kWh
Byfleet1,024−2 kWh
Chertsey1,025−1 kWh
Woking1,019−7 kWh
Weybridge1,025−1 kWh
Hersham1,025−1 kWh

PVGIS v5.2 for each town centroid, identical assumptions throughout. A few kWh either way is weather-year noise; a spread beyond about 30 kWh per kWp is real geography.

Also for West Byfleet, Sheerwater and New Haw: Solar panels in West Byfleet, Sheerwater and New Haw from OVO Solar & Battery

All of Surrey

Also near West Byfleet, Sheerwater and New Haw

Instant estimate

See a number before you speak to anyone

Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.

Free, no obligation

Get my free quote

Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.

Installations can only go ahead for homeowners, as the system is fixed to the property. Do carry on if you own it, or you are about to.
Flats and apartments usually share a roof, which rules most installations out. Send your details anyway and we will tell you honestly what is possible.
1 Where is your home?
Please add your full postcode
Please add your house number
2 About you
Please add your first name
Please add your last name
Please add a UK number
Please add a valid email
3 Your property
Do you own your home?
Please let us know
Property type
Please choose your property type
4 What are you after?
Please pick one, "not sure" is fine
Roughly is fine
Please choose a timeframe
5 When shall we call?
Best time for you (optional, but it helps)

We never call after 8pm.

We call or text within one working day to book your free 30-minute video design call. Free, no obligation, wherever you are in West Byfleet, Sheerwater and New Haw. No home visit needed.

Your design call is with Niall or Vince, our residential energy consultants.

Call 07782 219224

By submitting you agree we can contact you about your enquiry. We never sell your details and never pass them to a panel of companies to ring you. See our privacy notice.