0% VAT on solar panels and batteries ends 31 March 2027. What it means for you

07782 219224

Surrey

Solar panels in Woking, designed on a free call.

Twelve panels (6.36 kWp) here make about 6,480 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.

Get my free quote

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation. We call or text within one working day.

Your design call is with Niall or Vince, our residential energy consultants.

or call 07782 219224

  • Free 30-minute video design call
  • Priced before anyone visits
  • Installed by our MCS-certified, fully insured teams
Sunlight in Woking

Sunlight in Woking, in numbers

PVGIS puts Woking at 1,019 kWh per kWp a year, level with our Surrey county estimate. 68% of it arrives between April and September, peaking in July.

Map showing Woking in Surrey A simplified outline map of Surrey with neighbouring counties shown faintly, and a pin marking the location of Woking.
Woking in Surrey

Generation per kWp, month by month

Woking, 1,019 kWh per kWp a year
Woking, monthly generation per kWp Bar chart, twelve months January to December. Peak July at 126 kWh/kWp. Lowest December at 34.7 kWh/kWp. Full values are in the table below this chart. 145 0 JFMAMJJASOND 126
Show the monthly figures
Woking, monthly generation per kWp - monthly figures (kWh/kWp)
MonthkWh/kWp
January38.6
February52.1
March87.6
April115
May123
June124
July126
August112
September96
October66.6
November45.1
December34.7

Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.

6,480kWh a year, 12 panels
800kWh in July, the peak
220kWh in December

Against Great Britain as a whole: Woking makes 1,019 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so Woking is 10% above it.

How Woking compares

Woking is one of 47 Surrey towns we track, and it ranks joint 33rd of 47 for solar yield. The House of Commons Library settlement data classes it as a large town of 77,056 people. At 1,019 kWh per kWp a year, a typical 12 panel system here pays for itself in around 7.0 years on the 12p scenario: £912 of year one benefit against £6,360 installed, £247 of that benefit from cutting 26.32p imports with your own generation.

Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on Woking's own yield.

Woking is its own local planning authority area, and its House of Commons Library settlement class is large town.

12 panels
530W panels. Most semi-detached roofs take 10 to 16 on one pitch.
Add a battery?
Installed prices. The named packages are the ones running on our current offers; the Duracell prices are for an installation alongside solar.
Electricity use
Export rate scenario
EV charger?
Estimated benefit, year one
£912
£76 a month · payback 7.0 yrs
System price, installed
£6,360
Simple payback
7.0 yrs
Generates a year
6,481 kWh
Exported
5,544 kWh at 12p
Where the money comes from
Solar you use, Export income, Off-peak shifting,

Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.

Price this for your roof

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation, nobody visits your home. Prefer to talk? 07782 219224

Your design call is with Niall or Vince, our residential energy consultants.

The figures use PVGIS for the centre of Woking (51.3137, -0.57611), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.

Local grid

UK Power Networks and your Woking connection

On NESO's licence-area map, Woking is in South East England, which UK Power Networks operates. That makes UK Power Networks the network operator for any system fitted here.

Below 3.68kW per phase of inverter and battery output, the G98 route applies: the installation is notified to UK Power Networks within 28 days of commissioning, with no prior approval.

Above that, G99 means applying before the work is booked. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.

Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Aerial view of a large flat-roof solar array of around ninety panels on a modern brick home
A flat-roof array of around 90 panels, fitted for a large modern home.
Beyond solar

Beyond the panels: heating and car charging in Woking

A heat pump in Woking

Heating demand peaks when solar is weakest. In Woking, a 12-panel system makes about 220 kWh in December and 250 kWh in January, a fraction of its 800 kWh in July, which is why a heat pump here is costed on its tariff first.

Grant support in England comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).

How heat pumps work

Charging an EV in Woking

Woking's July output, about 800 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.

The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).

EV charging explained

Already got panels?

Solar panel servicing and repair in Woking

If a system in Woking is underperforming, start with the guides below: repair benchmarks, service scope, and the inverter question.

FAQs

Solar in Woking: your questions answered

How much energy would 12 solar panels make in Woking?

Woking averages 2.79 peak sun hours a day, which PVGIS turns into 1,019 kWh per kWp a year. On a 12-panel, 6.36 kWp roof that is about 6,480 kWh, 68% of it between April and September.

Is solar more expensive in Woking?

Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Woking, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,480 kWh a year here, which is what drives payback.

Who is the network operator in Woking, and do I need a G99 application?

The operator is UK Power Networks. Most home systems use the G98 route, a notification within 28 days of switch-on for up to 3.68kW per phase, so nothing waits on the network. Above that, G99 applies and has to be granted first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator. Your design call checks which route yours needs.

What could I earn from exporting in Woking?

On the 12p export scenario, a 12-panel system in Woking sends about 5,544 kWh a year to the grid, worth around £665. The export rates table compares what each supplier pays.

How does solar perform in Woking in the winter months?

December is the weakest month in Woking: about 220 kWh from 12 panels, against 800 kWh in July. The panels still generate on bright winter days; they just cover a smaller share of what the house uses.

How Woking compares with its neighbours

The six closest towns we publish, run through the identical PVGIS query as Woking.

TownkWh per kWp a yearvs Woking
Woking1,019this town
West End and Chobham1,025+6 kWh
West Byfleet, Sheerwater and New Haw1,026+7 kWh
Guildford1,028+9 kWh
Addlestone1,024+5 kWh
Byfleet1,024+5 kWh
Chertsey1,025+6 kWh

PVGIS v5.2 for each town centroid, identical assumptions throughout. A few kWh either way is weather-year noise; a spread beyond about 30 kWh per kWp is real geography.

Also for Woking: Solar panels in Woking from OVO Solar & Battery

All of Surrey

Instant estimate

See a number before you speak to anyone

Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.

Free, no obligation

Get my free quote

Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.

Installations can only go ahead for homeowners, as the system is fixed to the property. Do carry on if you own it, or you are about to.
Flats and apartments usually share a roof, which rules most installations out. Send your details anyway and we will tell you honestly what is possible.
1 Where is your home?
Please add your full postcode
Please add your house number
2 About you
Please add your first name
Please add your last name
Please add a UK number
Please add a valid email
3 Your property
Do you own your home?
Please let us know
Property type
Please choose your property type
4 What are you after?
Please pick one, "not sure" is fine
Roughly is fine
Please choose a timeframe
5 When shall we call?
Best time for you (optional, but it helps)

We never call after 8pm.

We call or text within one working day to book your free 30-minute video design call. Free, no obligation, wherever you are in Woking. No home visit needed.

Your design call is with Niall or Vince, our residential energy consultants.

Call 07782 219224

By submitting you agree we can contact you about your enquiry. We never sell your details and never pass them to a panel of companies to ring you. See our privacy notice.