Solar panels in Worcester Park and Stoneleigh.
Twelve panels here make about 6,470 kWh a year for £6,360 installed, designed on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
What a roof in Worcester Park and Stoneleigh can generate
From 35.4 kWh per kWp in December to 125.5 in July: a roof in Worcester Park and Stoneleigh makes 3.5 times as much in its best month as in its darkest, and 1,017 kWh per kWp across the year.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 37.5 |
| February | 50.6 |
| March | 87.2 |
| April | 115 |
| May | 123 |
| June | 124 |
| July | 126 |
| August | 111 |
| September | 96.2 |
| October | 66.5 |
| November | 46.3 |
| December | 35.4 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Against Great Britain as a whole: Worcester Park and Stoneleigh makes 1,017 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so Worcester Park and Stoneleigh is 10% above it.
How Worcester Park and Stoneleigh compares
Small towns rarely get published solar figures, so here are the numbers for Worcester Park and Stoneleigh. It is one of 47 Surrey towns we track, and it ranks joint 41st of 47 for solar yield, a town of 15,824 people in the House of Commons Library settlement data. PVGIS gives its roofs 1,017 kWh per kWp a year, 2.79 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £911 of year one benefit, £247 of it from your own generation and £664 from export at 12p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Worcester Park and Stoneleigh's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Worcester Park and Stoneleigh sits within Epsom and Ewell, its local planning authority, and the House of Commons Library classes it as a small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
The figures use PVGIS for the centre of Worcester Park and Stoneleigh (51.36833, -0.25156), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.
Connecting solar to the Worcester Park and Stoneleigh network
The distribution network operator (DNO) for Worcester Park and Stoneleigh is UK Power Networks, which runs the South East England licence area.
G98 is the simple route. If the inverter, plus any battery, stays at or under 3.68kW per phase, UK Power Networks only has to be told within 28 days after the system is commissioned.
Anything bigger is a G99 case and is applied for first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Worcester Park and Stoneleigh
A heat pump in Worcester Park and Stoneleigh
Solar and a heat pump pull in opposite directions through the year: Worcester Park and Stoneleigh's roofs make 1,080 kWh from November to February on a 12-panel system, and 3,070 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.
Grant support in England comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).
Charging an EV in Worcester Park and Stoneleigh
From April to September, 68% of a Worcester Park and Stoneleigh roof's yearly output arrives, peaking at about 800 kWh in July on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
Installed prices, the same in every town
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Worcester Park and Stoneleigh
Guidance is nationwide, so the benchmarks hold in Worcester Park and Stoneleigh: repair costs, service scope, and when the inverter is the real fault.
Worcester Park and Stoneleigh solar questions
What could a roof in Worcester Park and Stoneleigh generate?
PVGIS puts a roof in Worcester Park and Stoneleigh at 1,017 kWh per kWp a year, 2.79 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 6,470 kWh a year, most of it between April and September.
What would 12 solar panels cost in Worcester Park and Stoneleigh?
£6,360 for 12 panels (6.36 kWp), the same as in every other place we cover, because solar is priced at £1,000 per kWp installed rather than by area. A battery adds its own installed price on top. Where Worcester Park and Stoneleigh differs is output: about 6,470 kWh a year from that system.
Do I need permission from the DNO for solar in Worcester Park and Stoneleigh?
Usually not in advance. UK Power Networks, the network operator for Worcester Park and Stoneleigh, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator. "See our DNO explainer.
How much would export pay on a system in Worcester Park and Stoneleigh?
It is exported. With typical use and no battery, about 5,531 kWh of the 6,470 kWh a 12-panel system makes in Worcester Park and Stoneleigh goes to the grid, around £664 a year at 12p. A battery keeps more of it for the evening; the export rates table shows what suppliers pay.
Do solar panels work in winter in Worcester Park and Stoneleigh?
Yes, at a lower level. PVGIS gives Worcester Park and Stoneleigh 35.4 kWh per kWp in December and 37.5 in January, so a 12-panel system makes about 230 kWh and 240 kWh in those months, against 800 kWh in July. Winter output mostly covers daytime use rather than exporting.
How Worcester Park and Stoneleigh compares with its neighbours
The six closest towns we publish, run through the identical PVGIS query as Worcester Park and Stoneleigh.
| Town | kWh per kWp a year | vs Worcester Park and Stoneleigh |
|---|---|---|
| Worcester Park and Stoneleigh | 1,017 | this town |
| Ewell | 1,017 | level |
| Kingston upon Thames | 1,018 | +1 kWh |
| Epsom | 1,018 | +1 kWh |
| Sutton | 1,015 | −2 kWh |
| Merton | 1,022 | +5 kWh |
| Banstead | 1,016 | −1 kWh |
PVGIS v5.2 for each town centroid, identical assumptions throughout. A few kWh either way is weather-year noise; a spread beyond about 30 kWh per kWp is real geography.
Also for Worcester Park and Stoneleigh: Solar panels in Worcester Park and Stoneleigh from OVO Solar & Battery
Also near Worcester Park and Stoneleigh
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Guides worth reading before your call
Sourced, dated and written by us. The same ground we cover on your free call.
Solar panel types, and the four numbers that actually matter
TOPCon, HJT and back contact decoded, plus the four numbers worth comparing.
Read the guide →Tesla Powerwall 3 vs Duracell Dura16: which fits your home?
The two packages we actually price, compared on the numbers that decide it.
Read the guide →Charging an EV from your own solar
Every surplus kWh is 3.6 to 5 miles. Whether that beats a 7p overnight rate is arithmetic.
Read the guide →Do you need to replace your radiators for a heat pump?
Some change, most do not. The room by room arithmetic that decides which.
Read the guide →EV tariffs compared: the cheapest overnight windows
Overnight rates of 6.99p to 9p against a 26.32p capped average, compared.
Read the guide →G98 or G99: which one applies, what the application involves, and how long it takes
The G98 line sits at 3.68kW per phase. Above it, your network operator has to say yes first.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.