Solar panels in Worksop, designed on a free call.
About 6,100 kWh a year from 12 panels in Worksop, £6,360 installed, with your system designed on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
How much a Worksop roof makes, month by month
From 33.9 kWh per kWp in December to 120.4 in May: a roof in Worksop makes 3.6 times as much in its best month as in its darkest, and 959 kWh per kWp across the year.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 34.1 |
| February | 51.5 |
| March | 83.2 |
| April | 106 |
| May | 120 |
| June | 112 |
| July | 118 |
| August | 108 |
| September | 90.2 |
| October | 60.4 |
| November | 42.5 |
| December | 33.9 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
For scale: 959 kWh per kWp in Worksop against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Worksop 4% above it.
How Worksop compares
Among the places we publish figures for, Worksop is one of 29 Nottinghamshire towns we track, and it ranks joint 28th of 29 for solar yield. It is a medium town in the House of Commons Library classification, with 46,069 residents, and its roofs see 2.63 peak sun hours a day across the year. That drives the standard 12 panel model to 6,099 kWh of generation, of which around 5,163 kWh is exported at 12p for £620 a year, with £247 saved on electricity you would otherwise buy at 26.32p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Worksop's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Any planning application in Worksop sits with Bassetlaw, and its official House of Commons Library settlement class is medium town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for Worksop at 53.31054, -1.11887 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
The network operator for Worksop
Worksop sits in National Grid Electricity Distribution's East Midlands licence area, so NGED is the network operator (DNO) any solar panels or battery here are registered with.
Below 3.68kW per phase of inverter and battery output, the G98 route applies: the installation is notified to NGED within 28 days of commissioning, with no prior approval.
Above that, G99 means applying before the work is booked. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.
Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Worksop
A heat pump in Worksop
Heating demand peaks when solar is weakest. In Worksop, a 12-panel system makes about 220 kWh in December and 220 kWh in January, a fraction of its 770 kWh in May, which is why a heat pump here is costed on its tariff first.
Grant support in England comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).
Charging an EV in Worksop
Worksop's May output, about 770 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Worksop
The same sourced benchmarks apply in Worksop as everywhere we cover: honest repair pricing and what a service should include.
Solar in Worksop: your questions answered
How much electricity do solar panels make in Worksop?
About 6,100 kWh a year from 12 panels (6.36 kWp), on PVGIS satellite data for Worksop: 959 kWh per kWp, or 2.63 peak sun hours a day on average. May is the strongest month, at about 770 kWh.
Is solar more expensive in Worksop?
Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Worksop, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,100 kWh a year here, which is what drives payback.
Which DNO covers Worksop, and what does it need from me?
National Grid Electricity Distribution (NGED) covers Worksop. A home system of up to 3.68kW per phase is notified to NGED within 28 days of commissioning under G98, and nothing waits on approval. Larger outputs need a G99 application before work starts. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.
What could I earn from exporting in Worksop?
On the 12p export scenario, a 12-panel system in Worksop sends about 5,163 kWh a year to the grid, worth around £620. The export rates table compares what each supplier pays.
How much solar does Worksop get in December?
December is the low point: about 220 kWh from a 12-panel system in Worksop, on PVGIS data, rising to 770 kWh in May. From November to February the same system makes about 1,030 kWh in total, which is why a battery charged off-peak does more of the work in winter.
How Worksop compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs Worksop |
|---|---|---|
| Worksop | 959 | this town |
| Dinnington | 976 | +17 kWh |
| Clowne | 972 | +13 kWh |
| Retford | 995 | +36 kWh |
| Harworth and Bircotes | 980 | +21 kWh |
| Killamarsh | 957 | −2 kWh |
| Shirebrook | 966 | +7 kWh |
Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.
Also for Worksop: Solar panels in Worksop from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for Worksop
Sourced, dated and written by us. The same ground we cover on your free call.
G98 vs G99: the 28-day form and the eight-week wait, in plain English
One number on your quote decides between a formality and an eight week wait.
Read the guide →Which battery size band does your home fall into?
Where UK homes actually land, why oversizing costs you, and what shifts the band.
Read the guide →Three phase and EV charging: what actually changes
Three phase buys 22kW charging. Most cars cannot use it, and load balancing usually solves the real problem.
Read the guide →Do you need to replace your radiators for a heat pump?
Some change, most do not. The room by room arithmetic that decides which.
Read the guide →Why tariff choice moves payback more than kit choice
Identical kit, five times the export income. The tariff decision worked through with August 2026 rates.
Read the guide →What MCS certification actually is, and why your export payments depend on it
The badge that decides whether your solar earns export payments. It cannot be added later.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.