Solar panels in Ashtead, with the numbers shown.
About 6,480 kWh a year from 12 panels in Ashtead, £6,360 installed, with your system designed on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
What a roof in Ashtead can generate
Ashtead's best month is July, at 125.8 kWh per kWp; December manages 35.6. Over the year that comes to 1,019 kWh per kWp, level with our Surrey county estimate.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 38.5 |
| February | 51.1 |
| March | 87.1 |
| April | 115 |
| May | 123 |
| June | 124 |
| July | 126 |
| August | 111 |
| September | 96 |
| October | 66.1 |
| November | 46.2 |
| December | 35.6 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
For scale: 1,019 kWh per kWp in Ashtead against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Ashtead 10% above it.
How Ashtead compares
Small towns rarely get published solar figures, so here are the numbers for Ashtead. It is one of 47 Surrey towns we track, and it ranks joint 33rd of 47 for solar yield, a town of 14,897 people in the House of Commons Library settlement data. PVGIS gives its roofs 1,019 kWh per kWp a year, 2.79 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £912 of year one benefit, £247 of it from your own generation and £665 from export at 12p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Ashtead's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Ashtead sits within Mole Valley, its local planning authority, and the House of Commons Library classes it as a small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for Ashtead at 51.30989, -0.30283 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
Connecting solar to the Ashtead network
The distribution network operator (DNO) for Ashtead is UK Power Networks, which runs the South East England licence area.
G98 is the simple route. If the inverter, plus any battery, stays at or under 3.68kW per phase, UK Power Networks only has to be told within 28 days after the system is commissioned.
Anything bigger is a G99 case and is applied for first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Ashtead
A heat pump in Ashtead
Solar and a heat pump pull in opposite directions through the year: Ashtead's roofs make 1,090 kWh from November to February on a 12-panel system, and 3,070 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.
The Boiler Upgrade Scheme, open in England and Wales, takes £7,500 off an air source or ground source heat pump, or £2,500 off an air-to-air unit. Homes on oil or LPG with no mains gas get £1,500 more until March 2027 (gov.uk, checked 28 September 2026).
Charging an EV in Ashtead
From April to September, 68% of a Ashtead roof's yearly output arrives, peaking at about 800 kWh in July on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Ashtead
Guidance is nationwide, so the benchmarks hold in Ashtead: repair costs, service scope, and when the inverter is the real fault.
Solar in Ashtead: your questions answered
What could a roof in Ashtead generate?
PVGIS puts a roof in Ashtead at 1,019 kWh per kWp a year, 2.79 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 6,480 kWh a year, most of it between April and September.
What would 12 solar panels cost in Ashtead?
£6,360 for 12 panels (6.36 kWp), the same as in every other place we cover, because solar is priced at £1,000 per kWp installed rather than by area. A battery adds its own installed price on top. Where Ashtead differs is output: about 6,480 kWh a year from that system.
Do I need permission from the DNO for solar in Ashtead?
Usually not in advance. UK Power Networks, the network operator for Ashtead, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator. "See our DNO explainer.
How much would export pay on a system in Ashtead?
It is exported. With typical use and no battery, about 5,544 kWh of the 6,480 kWh a 12-panel system makes in Ashtead goes to the grid, around £665 a year at 12p. A battery keeps more of it for the evening; the export rates table shows what suppliers pay.
Do solar panels work in winter in Ashtead?
Yes, at a lower level. PVGIS gives Ashtead 35.6 kWh per kWp in December and 38.5 in January, so a 12-panel system makes about 230 kWh and 240 kWh in those months, against 800 kWh in July. Winter output mostly covers daytime use rather than exporting.
How Ashtead compares with its neighbours
How the towns nearest Ashtead compare on the same PVGIS settings, closest first.
| Town | kWh per kWp a year | vs Ashtead |
|---|---|---|
| Ashtead | 1,019 | this town |
| Leatherhead | 1,030 | +11 kWh |
| Epsom | 1,018 | −1 kWh |
| Tadworth and Epsom Downs | 1,019 | level |
| Great Bookham and Fetcham | 1,024 | +5 kWh |
| Ewell | 1,017 | −2 kWh |
| Cobham | 1,025 | +6 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
Also for Ashtead: Solar panels in Ashtead from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Ashtead homeowners
Sourced, dated and written by us. The same ground we cover on your free call.
Best solar panels UK 2026: what the datasheets actually say
One pick per job, the specs behind each, and what moves payback more than the badge.
Read the guide →Inside a home battery: capacity, power and losses
Usable capacity, kW output, round trip losses and chemistry, in plain terms.
Read the guide →Home EV charger types and speeds, explained properly
Granny cable, 7kW wall unit or 22kW three phase. What each adds per hour, and which you need.
Read the guide →The Boiler Upgrade Scheme, explained
A fixed amount, claimed on your behalf by our installation teams, with a real deadline on the £9,000 version.
Read the guide →Which tariffs are actually built for battery charging
A battery buys cheap and uses dear. The tariff decides how much that is worth.
Read the guide →HIES explained: what the badge actually protects, and when
What HIES protects: deposits up to 25 percent capped at 5,000 pounds, and your workmanship guarantee.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.