Solar panels in Tadworth and Epsom Downs.
Twelve panels here make about 6,480 kWh a year for £6,360 installed, designed on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
What a roof in Tadworth and Epsom Downs can generate
Tadworth and Epsom Downs' best month is July, at 126.3 kWh per kWp; December manages 36.2. Over the year that comes to 1,019 kWh per kWp, level with our Surrey county estimate.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 38.1 |
| February | 51 |
| March | 87 |
| April | 116 |
| May | 122 |
| June | 124 |
| July | 126 |
| August | 111 |
| September | 95.7 |
| October | 65.9 |
| November | 46.1 |
| December | 36.2 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
For scale: 1,019 kWh per kWp in Tadworth and Epsom Downs against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Tadworth and Epsom Downs 10% above it.
How Tadworth and Epsom Downs compares
Among the places we publish figures for, Tadworth and Epsom Downs is one of 47 Surrey towns we track, and it ranks joint 33rd of 47 for solar yield. It is a medium town in the House of Commons Library classification, with 27,920 residents, and its roofs see 2.79 peak sun hours a day across the year. That drives the standard 12 panel model to 6,481 kWh of generation, of which around 5,544 kWh is exported at 12p for £665 a year, with £247 saved on electricity you would otherwise buy at 26.32p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Tadworth and Epsom Downs' own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Tadworth and Epsom Downs sits within Reigate and Banstead, its local planning authority, and the House of Commons Library classes it as a medium town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for Tadworth and Epsom Downs at 51.30621, -0.23179 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
Connecting solar to the Tadworth and Epsom Downs network
Tadworth and Epsom Downs is served by UK Power Networks: the town's centre falls inside its South East England licence area on NESO's boundary map.
What decides the paperwork is the inverter and battery output, not the number of panels. Up to 3.68kW per phase, a system follows G98: UK Power Networks is notified within 28 days of commissioning and nothing has to be approved first.
Anything bigger is a G99 case and is applied for first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Tadworth and Epsom Downs
A heat pump in Tadworth and Epsom Downs
Solar and a heat pump pull in opposite directions through the year: Tadworth and Epsom Downs' roofs make 1,090 kWh from November to February on a 12-panel system, and 3,070 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.
The Boiler Upgrade Scheme, open in England and Wales, takes £7,500 off an air source or ground source heat pump, or £2,500 off an air-to-air unit. Homes on oil or LPG with no mains gas get £1,500 more until March 2027 (gov.uk, checked 28 September 2026).
Charging an EV in Tadworth and Epsom Downs
From April to September, 68% of a Tadworth and Epsom Downs roof's yearly output arrives, peaking at about 800 kWh in July on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.
The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Tadworth and Epsom Downs
Guidance is nationwide, so the benchmarks hold in Tadworth and Epsom Downs: repair costs, service scope, and when the inverter is the real fault.
Solar in Tadworth and Epsom Downs: your questions answered
What could a roof in Tadworth and Epsom Downs generate?
PVGIS puts a roof in Tadworth and Epsom Downs at 1,019 kWh per kWp a year, 2.79 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 6,480 kWh a year, most of it between April and September.
How much are solar panels in Tadworth and Epsom Downs?
The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in Tadworth and Epsom Downs before a battery. What Tadworth and Epsom Downs changes is the return, about 6,480 kWh a year from that system, and your design call prices your actual roof.
Do I need permission from the DNO for solar in Tadworth and Epsom Downs?
Usually not in advance. UK Power Networks, the network operator for Tadworth and Epsom Downs, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator. "See our DNO explainer.
How much can I earn from exporting solar in Tadworth and Epsom Downs?
With typical use and no battery, a 12-panel system in Tadworth and Epsom Downs exports about 5,544 kWh a year. At 12p per kWh that is roughly £665; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.
Do solar panels work in winter in Tadworth and Epsom Downs?
Yes, at a lower level. PVGIS gives Tadworth and Epsom Downs 36.2 kWh per kWp in December and 38.1 in January, so a 12-panel system makes about 230 kWh and 240 kWh in those months, against 800 kWh in July. Winter output mostly covers daytime use rather than exporting.
How Tadworth and Epsom Downs compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs Tadworth and Epsom Downs |
|---|---|---|
| Tadworth and Epsom Downs | 1,019 | this town |
| Banstead | 1,016 | −3 kWh |
| Epsom | 1,018 | −1 kWh |
| Ashtead | 1,019 | level |
| Ewell | 1,017 | −2 kWh |
| Leatherhead | 1,030 | +11 kWh |
| Worcester Park and Stoneleigh | 1,017 | −2 kWh |
Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.
Also for Tadworth and Epsom Downs: Solar panels in Tadworth and Epsom Downs from OVO Solar & Battery
Also near Tadworth and Epsom Downs
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for Tadworth and Epsom Downs
Sourced, dated and written by us. The same ground we cover on your free call.
Aiko vs LONGi for a UK roof: Neostar 3 or Hi-MO X10?
Datasheet against datasheet, with a verdict by roof type and the warranty by series.
Read the guide →Inside a home battery: capacity, power and losses
Usable capacity, kW output, round trip losses and chemistry, in plain terms.
Read the guide →How time of use charging windows actually work
How a cheap overnight window is metered and billed, and what a battery does inside it.
Read the guide →Do you need to replace your radiators for a heat pump?
Some change, most do not. The room by room arithmetic that decides which.
Read the guide →Why the best export rates always carry conditions
The top export rates are acquisition offers. Here is how to price the condition.
Read the guide →What MCS certification actually is, and why your export payments depend on it
The badge that decides whether your solar earns export payments. It cannot be added later.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.