Solar panels in Barrow-in-Furness, sized to your roof.
A 12-panel roof in Barrow-in-Furness makes about 6,510 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Barrow-in-Furness' solar year
PVGIS puts Barrow-in-Furness at 1,023 kWh per kWp a year, 18% above our Lancashire county estimate. 71% of it arrives between April and September, peaking in May.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 29.8 |
| February | 52.8 |
| March | 89.2 |
| April | 121 |
| May | 140 |
| June | 132 |
| July | 132 |
| August | 117 |
| September | 90.6 |
| October | 57.9 |
| November | 35.7 |
| December | 26.5 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
For scale: 1,023 kWh per kWp in Barrow-in-Furness against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Barrow-in-Furness 11% above it.
How Barrow-in-Furness compares
Among the places we publish figures for, Barrow-in-Furness is one of 109 Lancashire towns we track, and it ranks 5th of 109 for solar yield. It is a medium town in the House of Commons Library classification, with 55,778 residents, and its roofs see 2.80 peak sun hours a day across the year. That drives the standard 12 panel model to 6,506 kWh of generation, of which around 5,570 kWh is exported at 12p for £668 a year, with £247 saved on electricity you would otherwise buy at 26.32p.
Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on Barrow-in-Furness' own yield.
Westmorland and Furness is the planning authority covering Barrow-in-Furness, which the House of Commons Library classes as a medium town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for Barrow-in-Furness at 54.11809, -3.22175 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
Who runs the grid in Barrow-in-Furness
On NESO's licence-area map, Barrow-in-Furness is in North West England, which Electricity North West operates. That makes Electricity North West the network operator for any system fitted here.
Most home systems stay within 3.68kW per phase of inverter output, which puts them on G98, a notification to Electricity North West within 28 days of switch-on. Panel count does not decide it; the inverter and any battery do.
A bigger inverter or battery output needs a G99 application in advance. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds Electricity North West as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Beyond the panels: heating and car charging in Barrow-in-Furness
A heat pump in Barrow-in-Furness
A heat pump does most of its work from November to February. Over those four months, 12 panels in Barrow-in-Furness make about 920 kWh, against 3,300 kWh from May to August, so winter heating runs mostly on grid electricity and the tariff matters more than the roof.
In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).
Charging an EV in Barrow-in-Furness
A 12-panel roof in Barrow-in-Furness makes about 890 kWh in May. A typical home uses around 70 kWh of that in daylight (the calculator's typical-use settings), which leaves most of the month's output for an EV or for export.
Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.
Installed prices, the same in every town
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Barrow-in-Furness
Faults, servicing and ageing inverters follow the same economics in Barrow-in-Furness as anywhere else, and the guides below price them plainly.
Common questions about solar in Barrow-in-Furness
What does a solar panel system produce in Barrow-in-Furness?
Each kWp of panels in Barrow-in-Furness makes 1,023 kWh a year on PVGIS figures, so a typical 12-panel system produces around 6,510 kWh, from about 170 kWh in December up to 890 kWh in May.
What would 12 solar panels cost in Barrow-in-Furness?
£6,360 for 12 panels (6.36 kWp), the same as in every other place we cover, because solar is priced at £1,000 per kWp installed rather than by area. A battery adds its own installed price on top. Where Barrow-in-Furness differs is output: about 6,510 kWh a year from that system.
Would a system in Barrow-in-Furness need approval from the network operator?
Barrow-in-Furness is on Electricity North West's network (North West England licence area). Systems up to 3.68kW per phase of inverter output follow G98: Electricity North West is notified within 28 days of commissioning, with no approval needed first. Anything larger needs a G99 application before installation. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds Electricity North West as it does every network operator. Our G98 vs G99 guide explains both routes.
How much would export pay on a system in Barrow-in-Furness?
It is exported. With typical use and no battery, about 5,570 kWh of the 6,510 kWh a 12-panel system makes in Barrow-in-Furness goes to the grid, around £668 a year at 12p. A battery keeps more of it for the evening; the export rates table shows what suppliers pay.
Is solar worth it in Barrow-in-Furness in winter?
It works, but the year is lopsided. 71% of a Barrow-in-Furness roof's output lands between April and September; the four months from November to February give about 920 kWh on a 12-panel system. Payback is worked out on the whole year, not the winter.
How Barrow-in-Furness compares with its neighbours
How the towns nearest Barrow-in-Furness compare on the same PVGIS settings, closest first.
| Town | kWh per kWp a year | vs Barrow-in-Furness |
|---|---|---|
| Barrow-in-Furness | 1,023 | this town |
| Dalton-in-Furness | 1,005 | −18 kWh |
| Ulverston | 967 | −56 kWh |
| Heysham | 976 | −47 kWh |
| Morecambe | 942 | −81 kWh |
| Fleetwood | 1,024 | +1 kWh |
| Lancaster | 900 | −123 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
Also for Barrow-in-Furness: Solar panels in Barrow-in-Furness from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Barrow-in-Furness homeowners
Sourced, dated and written by us. The same ground we cover on your free call.
Do solar panels increase home value? What the actual data shows
The largest UK study found a 6.1% to 7.1% sale price premium. Here is the full picture.
Read the guide →Adding a battery to solar panels you already own
Retrofitting a battery to working solar is straightforward. The paperwork is where people trip up.
Read the guide →Home EV charger types and speeds, explained properly
Granny cable, 7kW wall unit or 22kW three phase. What each adds per hour, and which you need.
Read the guide →Sizing a heat pump: what a proper survey covers
Sized by calculation, not by rule of thumb. What the survey covers, and what guessing costs.
Read the guide →Will energy prices keep rising, and by how much
The January forecasts jumped fast. What is confirmed, what is guessed, and whether solar is a real hedge.
Read the guide →What MCS certification actually is, and why your export payments depend on it
The badge that decides whether your solar earns export payments. It cannot be added later.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.