Solar panels in Bingley, with the numbers shown.
Twelve panels (6.36 kWp) here make about 5,880 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Bingley's solar year
Bingley's best month is May, at 119 kWh per kWp; December manages 27.7. Over the year that comes to 924 kWh per kWp, 4% below our Yorkshire county estimate.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 30.5 |
| February | 48.1 |
| March | 81.5 |
| April | 106 |
| May | 119 |
| June | 110 |
| July | 116 |
| August | 105 |
| September | 85.1 |
| October | 56.6 |
| November | 38.6 |
| December | 27.7 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Against Great Britain as a whole: Bingley makes 924 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so Bingley is level with it.
How Bingley compares
Small towns rarely get published solar figures, so here are the numbers for Bingley. It is one of 122 Yorkshire towns we track, and it ranks joint 105th of 122 for solar yield, a town of 21,676 people in the House of Commons Library settlement data. PVGIS gives its roofs 924 kWh per kWp a year, 2.53 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £840 of year one benefit, £247 of it from your own generation and £593 from export at 12p.
These are starting numbers, not a quote. The calculator below opens on Bingley's own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.
Bradford is the planning authority covering Bingley, which the House of Commons Library classes as a small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
The figures use PVGIS for the centre of Bingley (53.84886, -1.82918), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.
Who runs the grid in Bingley
The distribution network operator (DNO) for Bingley is Northern Powergrid, which runs the Yorkshire licence area.
G98 is the simple route. If the inverter, plus any battery, stays at or under 3.68kW per phase, Northern Powergrid only has to be told within 28 days after the system is commissioned.
A bigger inverter or battery output needs a G99 application in advance. Northern Powergrid publishes a guaranteed standard of 45 working days to quote for a low voltage generation connection.
Sources: NESO DNO licence areas (3 May 2024); Northern Powergrid, generation connections page, checked 25 September 2026. G98 vs G99, explained.

Adding a heat pump or an EV charger in Bingley
A heat pump in Bingley
A heat pump does most of its work from November to February. Over those four months, 12 panels in Bingley make about 920 kWh, against 2,860 kWh from May to August, so winter heating runs mostly on grid electricity and the tariff matters more than the roof.
The Boiler Upgrade Scheme, open in England and Wales, takes £7,500 off an air source or ground source heat pump, or £2,500 off an air-to-air unit. Homes on oil or LPG with no mains gas get £1,500 more until March 2027 (gov.uk, checked 28 September 2026).
Charging an EV in Bingley
From April to September, 69% of a Bingley roof's yearly output arrives, peaking at about 760 kWh in May on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.
The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).
The packages, priced before anyone visits
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Bingley
Faults, servicing and ageing inverters follow the same economics in Bingley as anywhere else, and the guides below price them plainly.
Bingley solar questions
What does a solar panel system produce in Bingley?
Each kWp of panels in Bingley makes 924 kWh a year on PVGIS figures, so a typical 12-panel system produces around 5,880 kWh, from about 180 kWh in December up to 760 kWh in May.
How much are solar panels in Bingley?
The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in Bingley before a battery. What Bingley changes is the return, about 5,880 kWh a year from that system, and your design call prices your actual roof.
Would a system in Bingley need approval from the network operator?
Bingley is on Northern Powergrid's network (Yorkshire licence area). Systems up to 3.68kW per phase of inverter output follow G98: Northern Powergrid is notified within 28 days of commissioning, with no approval needed first. Anything larger needs a G99 application before installation. Northern Powergrid publishes a guaranteed standard of 45 working days to quote for a low voltage generation connection. Our G98 vs G99 guide explains both routes.
How much can I earn from exporting solar in Bingley?
With typical use and no battery, a 12-panel system in Bingley exports about 4,940 kWh a year. At 12p per kWh that is roughly £593; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.
Is solar worth it in Bingley in winter?
It works, but the year is lopsided. 69% of a Bingley roof's output lands between April and September; the four months from November to February give about 920 kWh on a 12-panel system. Payback is worked out on the whole year, not the winter.
How Bingley compares with its neighbours
The six closest towns we publish, run through the identical PVGIS query as Bingley.
| Town | kWh per kWp a year | vs Bingley |
|---|---|---|
| Bingley | 924 | this town |
| Shipley | 929 | +5 kWh |
| Baildon | 931 | +7 kWh |
| Keighley | 900 | −24 kWh |
| Bradford | 926 | +2 kWh |
| Guiseley | 935 | +11 kWh |
| Ilkley | 913 | −11 kWh |
PVGIS v5.2 for each town centroid, identical assumptions throughout. A few kWh either way is weather-year noise; a spread beyond about 30 kWh per kWp is real geography.
Also for Bingley: Solar panels in Bingley from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Guides worth reading before your call
Sourced, dated and written by us. The same ground we cover on your free call.
Solar installation day: exactly what happens, hour by hour
The week before, the day itself hour by hour, and the paperwork that follows.
Read the guide →Tesla Powerwall 3 vs Duracell Dura16: which fits your home?
The two packages we actually price, compared on the numbers that decide it.
Read the guide →The main home EV chargers, compared on what actually differs
Eight popular UK home chargers on cable, connectivity, warranty and tariff integration.
Read the guide →Are heat pumps noisy? The 37 dB(A) answer, in plain terms
The 1 metre boundary rule is gone. A 37 dB(A) sound test replaced it.
Read the guide →The price cap explained, and what it does to solar payback
The cap limits unit rates, not bills. That changes what solar payback means.
Read the guide →NAPIT, NICEIC and competent person schemes: who tells building control about your solar
Solar work is notifiable. A competent person scheme means your installation team notifies, not you.
Read the guide →Get my free quote