Solar panels in Croydon, with the numbers shown.
A 12-panel roof in Croydon makes about 6,460 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
What a roof in Croydon can generate
Croydon's best month is July, at 125.5 kWh per kWp; December manages 35.8. Over the year that comes to 1,015 kWh per kWp, 1% below our Surrey county estimate.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 37.1 |
| February | 50.5 |
| March | 86.3 |
| April | 115 |
| May | 123 |
| June | 124 |
| July | 126 |
| August | 111 |
| September | 95.9 |
| October | 65.8 |
| November | 45.9 |
| December | 35.8 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
For scale: 1,015 kWh per kWp in Croydon against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Croydon 10% above it.
How Croydon compares
Croydon is one of 47 Surrey towns we track, and it ranks joint 45th of 47 for solar yield. The House of Commons Library settlement classification puts it in the core city class, with a population of 407,821, which makes it one of the largest places we publish figures for. Scale changes nothing about the physics: PVGIS gives a roof here 1,015 kWh per kWp a year, 2.78 peak sun hours a day averaged across the seasons, and on the 12p scenario about £247 of the year one benefit comes from solar you use yourself, with export income adding £662.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Croydon's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Planning applications in Croydon go to its own council, and the House of Commons Library classes it as a core city.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
The figures use PVGIS for the centre of Croydon (51.36106, -0.08916), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.
Connecting solar to the Croydon network
Croydon is served by UK Power Networks: the town's centre falls inside its South East England licence area on NESO's boundary map.
Most home systems stay within 3.68kW per phase of inverter output, which puts them on G98, a notification to UK Power Networks within 28 days of switch-on. Panel count does not decide it; the inverter and any battery do.
A bigger inverter or battery output needs a G99 application in advance. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Croydon
A heat pump in Croydon
Solar and a heat pump pull in opposite directions through the year: Croydon's roofs make 1,080 kWh from November to February on a 12-panel system, and 3,070 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.
In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).
Charging an EV in Croydon
From April to September, 68% of a Croydon roof's yearly output arrives, peaking at about 800 kWh in July on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Croydon
Guidance is nationwide, so the benchmarks hold in Croydon: repair costs, service scope, and when the inverter is the real fault.
Solar in Croydon: your questions answered
What could a roof in Croydon generate?
PVGIS puts a roof in Croydon at 1,015 kWh per kWp a year, 2.78 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 6,460 kWh a year, most of it between April and September.
How much are solar panels in Croydon?
The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in Croydon before a battery. What Croydon changes is the return, about 6,460 kWh a year from that system, and your design call prices your actual roof.
Do I need permission from the DNO for solar in Croydon?
Usually not in advance. UK Power Networks, the network operator for Croydon, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator. "See our DNO explainer.
How much can I earn from exporting solar in Croydon?
With typical use and no battery, a 12-panel system in Croydon exports about 5,519 kWh a year. At 12p per kWh that is roughly £662; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.
Do solar panels work in winter in Croydon?
Yes, at a lower level. PVGIS gives Croydon 35.8 kWh per kWp in December and 37.1 in January, so a 12-panel system makes about 230 kWh and 240 kWh in those months, against 800 kWh in July. Winter output mostly covers daytime use rather than exporting.
How Croydon compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs Croydon |
|---|---|---|
| Croydon | 1,015 | this town |
| Warlingham | 1,017 | +2 kWh |
| Sutton | 1,015 | level |
| Caterham | 1,031 | +16 kWh |
| Banstead | 1,016 | +1 kWh |
| Merton | 1,022 | +7 kWh |
| Bromley | 1,023 | +8 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
Also for Croydon: Solar panels in Croydon from OVO Solar & Battery
Also near Croydon
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for Croydon
Sourced, dated and written by us. The same ground we cover on your free call.
Best solar panels UK 2026: what the datasheets actually say
One pick per job, the specs behind each, and what moves payback more than the badge.
Read the guide →GivEnergy in administration: what owners should do now
The sourced timeline, the warranty position, and the owner's checklist for this month.
Read the guide →Three phase and EV charging: what actually changes
Three phase buys 22kW charging. Most cars cannot use it, and load balancing usually solves the real problem.
Read the guide →The Boiler Upgrade Scheme, explained
A fixed amount, claimed on your behalf by our installation teams, with a real deadline on the £9,000 version.
Read the guide →What the Smart Export Guarantee actually is
The scheme obliges suppliers to pay above zero, and leaves the rate to them.
Read the guide →What MCS certification actually is, and why your export payments depend on it
The badge that decides whether your solar earns export payments. It cannot be added later.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.