Solar panels in Great Harwood, sized to your roof.
A 12-panel roof in Great Harwood makes about 5,550 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
What a roof in Great Harwood can generate
PVGIS puts Great Harwood at 872 kWh per kWp a year, 1% above our Lancashire county estimate. 71% of it arrives between April and September, peaking in May.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 24.4 |
| February | 44.1 |
| March | 77.2 |
| April | 105 |
| May | 116 |
| June | 109 |
| July | 111 |
| August | 95.6 |
| September | 79.1 |
| October | 52.8 |
| November | 36 |
| December | 22.7 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 872, Great Harwood is 6% below it.
How Great Harwood compares
Small towns rarely get published solar figures, so here are the numbers for Great Harwood. It is one of 109 Lancashire towns we track, and it ranks 90th of 109 for solar yield, a town of 11,468 people in the House of Commons Library settlement data. PVGIS gives its roofs 872 kWh per kWp a year, 2.39 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £800 of year one benefit, £247 of it from your own generation and £553 from export at 12p.
Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on Great Harwood's own yield.
Great Harwood sits within Hyndburn, its local planning authority, and the House of Commons Library classes it as a small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
The figures use PVGIS for the centre of Great Harwood (53.78775, -2.40027), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.
Connecting solar to the Great Harwood network
Great Harwood is served by Electricity North West: the town's centre falls inside its North West England licence area on NESO's boundary map.
Most home systems stay within 3.68kW per phase of inverter output, which puts them on G98, a notification to Electricity North West within 28 days of switch-on. Panel count does not decide it; the inverter and any battery do.
A bigger inverter or battery output needs a G99 application in advance. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds Electricity North West as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Beyond the panels: heating and car charging in Great Harwood
A heat pump in Great Harwood
Solar and a heat pump pull in opposite directions through the year: Great Harwood's roofs make 810 kWh from November to February on a 12-panel system, and 2,740 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.
Grant support in England comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).
Charging an EV in Great Harwood
A 12-panel roof in Great Harwood makes about 740 kWh in May. A typical home uses around 70 kWh of that in daylight (the calculator's typical-use settings), which leaves most of the month's output for an EV or for export.
The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).
The packages, priced before anyone visits
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Great Harwood
Guidance is nationwide, so the benchmarks hold in Great Harwood: repair costs, service scope, and when the inverter is the real fault.
Solar in Great Harwood: your questions answered
What could a roof in Great Harwood generate?
PVGIS puts a roof in Great Harwood at 872 kWh per kWp a year, 2.39 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 5,550 kWh a year, most of it between April and September.
How much are solar panels in Great Harwood?
The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in Great Harwood before a battery. What Great Harwood changes is the return, about 5,550 kWh a year from that system, and your design call prices your actual roof.
Do I need permission from the DNO for solar in Great Harwood?
Usually not in advance. Electricity North West, the network operator for Great Harwood, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds Electricity North West as it does every network operator. "See our DNO explainer.
How much can I earn from exporting solar in Great Harwood?
With typical use and no battery, a 12-panel system in Great Harwood exports about 4,609 kWh a year. At 12p per kWh that is roughly £553; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.
Do solar panels work in winter in Great Harwood?
Yes, at a lower level. PVGIS gives Great Harwood 22.7 kWh per kWp in December and 24.4 in January, so a 12-panel system makes about 140 kWh and 160 kWh in those months, against 740 kWh in May. Winter output mostly covers daytime use rather than exporting.
How Great Harwood compares with its neighbours
The six closest towns we publish, run through the identical PVGIS query as Great Harwood.
| Town | kWh per kWp a year | vs Great Harwood |
|---|---|---|
| Great Harwood | 872 | this town |
| Clayton-le-Moors | 874 | +2 kWh |
| Accrington | 875 | +3 kWh |
| Oswaldtwistle | 876 | +4 kWh |
| Padiham | 864 | −8 kWh |
| Blackburn | 875 | +3 kWh |
| Clitheroe | 878 | +6 kWh |
PVGIS v5.2 for each town centroid, identical assumptions throughout. A few kWh either way is weather-year noise; a spread beyond about 30 kWh per kWp is real geography.
Also for Great Harwood: Solar panels in Great Harwood from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Guides worth reading before your call
Sourced, dated and written by us. The same ground we cover on your free call.
Aiko vs LONGi for a UK roof: Neostar 3 or Hi-MO X10?
Datasheet against datasheet, with a verdict by roof type and the warranty by series.
Read the guide →Tesla Powerwall 3 vs Duracell Dura16: which fits your home?
The two packages we actually price, compared on the numbers that decide it.
Read the guide →Charging an EV from your own solar
Every surplus kWh is 3.6 to 5 miles. Whether that beats a 7p overnight rate is arithmetic.
Read the guide →How much does a heat pump cost? The 2026 numbers, before and after the grant
UK median installed cost around £12,908, before the up to £7,500 grant comes off.
Read the guide →Why tariff choice moves payback more than kit choice
Identical kit, five times the export income. The tariff decision worked through with August 2026 rates.
Read the guide →G98 or G99: which one applies, what the application involves, and how long it takes
The G98 line sits at 3.68kW per phase. Above it, your network operator has to say yes first.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.