Solar panels in Haringey, priced before anyone visits.
A 12-panel roof in Haringey makes about 6,510 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Sunlight in Haringey, in numbers
From 38 kWh per kWp in December to 124.2 in July: a roof in Haringey makes 3.3 times as much in its best month as in its darkest, and 1,024 kWh per kWp across the year.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 40.5 |
| February | 53.5 |
| March | 88.5 |
| April | 115 |
| May | 121 |
| June | 122 |
| July | 124 |
| August | 110 |
| September | 96.2 |
| October | 67 |
| November | 48.5 |
| December | 38 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Against Great Britain as a whole: Haringey makes 1,024 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so Haringey is 11% above it.
How Haringey compares
Haringey is one of 23 Middlesex towns we track, and it ranks joint 15th of 23 for solar yield. The House of Commons Library settlement classification puts it in the core city class, with a population of 263,886, which makes it one of the largest places we publish figures for. Scale changes nothing about the physics: PVGIS gives a roof here 1,024 kWh per kWp a year, 2.81 peak sun hours a day averaged across the seasons, and on the 12p scenario about £247 of the year one benefit comes from solar you use yourself, with export income adding £669.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Haringey's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Haringey is its own local planning authority area, and its House of Commons Library settlement class is core city.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for Haringey at 51.59013, -0.10745 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
UK Power Networks and your Haringey connection
Haringey is served by UK Power Networks: the town's centre falls inside its East England licence area on NESO's boundary map.
What decides the paperwork is the inverter and battery output, not the number of panels. Up to 3.68kW per phase, a system follows G98: UK Power Networks is notified within 28 days of commissioning and nothing has to be approved first.
Larger systems go through G99 instead, applied for before installation. On timing: Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Haringey
A heat pump in Haringey
Heating demand peaks when solar is weakest. In Haringey, a 12-panel system makes about 240 kWh in December and 260 kWh in January, a fraction of its 790 kWh in July, which is why a heat pump here is costed on its tariff first.
Grant support in England comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).
Charging an EV in Haringey
Summer is where a car earns its place. In July, 12 panels in Haringey make about 790 kWh, against roughly 70 kWh a typical home uses in daylight that month on our calculator's typical-use settings, so there is surplus a smart charger can put into the car instead of exporting it.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Haringey
The same sourced benchmarks apply in Haringey as everywhere we cover: honest repair pricing and what a service should include.
Solar in Haringey: your questions answered
How much electricity do solar panels make in Haringey?
About 6,510 kWh a year from 12 panels (6.36 kWp), on PVGIS satellite data for Haringey: 1,024 kWh per kWp, or 2.81 peak sun hours a day on average. July is the strongest month, at about 790 kWh.
What does a typical solar system cost in Haringey?
Solar is priced at £1,000 per kWp installed wherever you live, so a 12-panel, 6.36 kWp system costs £6,360 in Haringey, exactly as it would anywhere else, before any battery. Location changes what the system makes, not what it costs: here that is about 6,510 kWh a year. The final figure comes from your roof on the design call.
Which DNO covers Haringey, and what does it need from me?
UK Power Networks covers Haringey. A home system of up to 3.68kW per phase is notified to UK Power Networks within 28 days of commissioning under G98, and nothing waits on approval. Larger outputs need a G99 application before work starts. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.
What happens to the solar I do not use in Haringey?
Around £669 a year at 12p per kWh, for the roughly 5,576 kWh a 12-panel system in Haringey exports with typical use. Rates vary by supplier and some need their own tariff; the export rates table is dated and sourced.
How much solar does Haringey get in December?
December is the low point: about 240 kWh from a 12-panel system in Haringey, on PVGIS data, rising to 790 kWh in July. From November to February the same system makes about 1,150 kWh in total, which is why a battery charged off-peak does more of the work in winter.
How Haringey compares with its neighbours
How the towns nearest Haringey compare on the same PVGIS settings, closest first.
| Town | kWh per kWp a year | vs Haringey |
|---|---|---|
| Haringey | 1,024 | this town |
| Islington | 1,026 | +2 kWh |
| Hackney | 1,025 | +1 kWh |
| Camden | 1,026 | +2 kWh |
| Enfield | 1,025 | +1 kWh |
| Waltham Forest | 1,022 | −2 kWh |
| Barnet | 1,016 | −8 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
Also for Haringey: Solar panels in Haringey from OVO Solar & Battery
Also near Haringey
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Haringey homeowners
Sourced, dated and written by us. The same ground we cover on your free call.
Do you need planning permission for solar panels? Usually not
Usually not, provided the installation stays within the limits updated on 27 August 2026.
Read the guide →Whole home backup or partial backup? The runtime arithmetic
Whole home backup sounds obvious until you do the runtime maths. Here is how to choose the right tier.
Read the guide →Smart charge point regulations, explained
Why your charger arrives pre-set to charge overnight, and why it waits before it starts.
Read the guide →Do you need to replace your radiators for a heat pump?
Some change, most do not. The room by room arithmetic that decides which.
Read the guide →Why the best export rates always carry conditions
The top export rates are acquisition offers. Here is how to price the condition.
Read the guide →Your MCS certificate: what it shows, when it arrives, and how a Smart Export Guarantee supplier uses it
The document your export payments hang on. Who issues it, what it shows, and how to get a copy.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.