Solar panels in Hook, designed on a free call.
A 12-panel roof in Hook makes about 6,590 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Sunlight in Hook, in numbers
PVGIS puts Hook at 1,036 kWh per kWp a year, 1% below our Hampshire county estimate. 68% of it arrives between April and September, peaking in July.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 40.4 |
| February | 53.4 |
| March | 89.8 |
| April | 117 |
| May | 124 |
| June | 125 |
| July | 126 |
| August | 113 |
| September | 97.7 |
| October | 66.6 |
| November | 46.5 |
| December | 36.4 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 1,036, Hook is 12% above it.
How Hook compares
Small towns rarely get published solar figures, so here are the numbers for Hook. It is one of 45 Hampshire towns we track, and it ranks 38th of 45 for solar yield, a town of 9,718 people in the House of Commons Library settlement data. PVGIS gives its roofs 1,036 kWh per kWp a year, 2.84 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £925 of year one benefit, £247 of it from your own generation and £678 from export at 12p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Hook's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Any planning application in Hook sits with Hart, and its official House of Commons Library settlement class is small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for Hook at 51.28349, -0.95953 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
SSEN and your Hook connection
Scottish and Southern Electricity Networks (SSEN) owns and runs the local electricity network in Hook, as part of its Southern England licence area.
What decides the paperwork is the inverter and battery output, not the number of panels. Up to 3.68kW per phase, a system follows G98: SSEN is notified within 28 days of commissioning and nothing has to be approved first.
Above that, G99 means applying before the work is booked. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW.
Sources: NESO DNO licence areas (3 May 2024); SSEN, micro-generation connections page, checked 25 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Hook
A heat pump in Hook
In December, the darkest month here, 12 panels in Hook make about 230 kWh. That is when a heat pump runs hardest, so its running cost in Hook comes down to the tariff and the flow temperature rather than the roof.
Grant support in England comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).
Charging an EV in Hook
Hook's July output, about 800 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.
The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).
Installed prices, the same in every town
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Hook
If a system in Hook is underperforming, start with the guides below: repair benchmarks, service scope, and the inverter question.
Hook solar questions
How much energy would 12 solar panels make in Hook?
Hook averages 2.84 peak sun hours a day, which PVGIS turns into 1,036 kWh per kWp a year. On a 12-panel, 6.36 kWp roof that is about 6,590 kWh, 68% of it between April and September.
Is solar more expensive in Hook?
Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Hook, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,590 kWh a year here, which is what drives payback.
Who is the network operator in Hook, and do I need a G99 application?
The operator is Scottish and Southern Electricity Networks (SSEN). Most home systems use the G98 route, a notification within 28 days of switch-on for up to 3.68kW per phase, so nothing waits on the network. Above that, G99 applies and has to be granted first. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW. Your design call checks which route yours needs.
What could I earn from exporting in Hook?
On the 12p export scenario, a 12-panel system in Hook sends about 5,652 kWh a year to the grid, worth around £678. The export rates table compares what each supplier pays.
How does solar perform in Hook in the winter months?
December is the weakest month in Hook: about 230 kWh from 12 panels, against 800 kWh in July. The panels still generate on bright winter days; they just cover a smaller share of what the house uses.
How Hook compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs Hook |
|---|---|---|
| Hook | 1,036 | this town |
| Fleet | 1,023 | −13 kWh |
| Basingstoke | 1,031 | −5 kWh |
| Yateley | 1,017 | −19 kWh |
| Weybourne | 1,020 | −16 kWh |
| Farnborough | 1,022 | −14 kWh |
| Sandhurst | 1,016 | −20 kWh |
Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.
Also for Hook: Solar panels in Hook from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for Hook
Sourced, dated and written by us. The same ground we cover on your free call.
How to size a solar and battery system, properly
Usage, storage, connection, array. Four decisions, and the order between them matters.
Read the guide →Sigenergy SigenStor review: the 5-in-1 tower examined
The 5-in-1 tower reviewed by a site that does not sell it, warranty arithmetic included.
Read the guide →What it really costs to charge an EV at home versus in public
Home off-peak charging costs a fraction of the public price. The arithmetic, and the tariff it depends on.
Read the guide →Heat pump running costs versus a gas boiler, assumptions shown
Four numbers decide it: seasonal efficiency, flow temperature, tariff and heat demand.
Read the guide →Why tariff choice moves payback more than kit choice
Identical kit, five times the export income. The tariff decision worked through with August 2026 rates.
Read the guide →NAPIT, NICEIC and competent person schemes: who tells building control about your solar
Solar work is notifiable. A competent person scheme means your installation team notifies, not you.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.