Solar panels in Fleet, with the numbers shown.
Twelve panels (6.36 kWp) here make about 6,510 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
What a roof in Fleet can generate
PVGIS puts Fleet at 1,023 kWh per kWp a year, 2% below our Hampshire county estimate. 68% of it arrives between April and September, peaking in July.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 40 |
| February | 52.9 |
| March | 88 |
| April | 115 |
| May | 123 |
| June | 124 |
| July | 125 |
| August | 111 |
| September | 95.5 |
| October | 66 |
| November | 46.5 |
| December | 36.8 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Against Great Britain as a whole: Fleet makes 1,023 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so Fleet is 11% above it.
How Fleet compares
Among the places we publish figures for, Fleet is one of 45 Hampshire towns we track, and it ranks 42nd of 45 for solar yield. It is a medium town in the House of Commons Library classification, with 38,967 residents, and its roofs see 2.80 peak sun hours a day across the year. That drives the standard 12 panel model to 6,506 kWh of generation, of which around 5,570 kWh is exported at 12p for £668 a year, with £247 saved on electricity you would otherwise buy at 26.32p.
These are starting numbers, not a quote. The calculator below opens on Fleet's own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.
Fleet sits within Hart, its local planning authority, and the House of Commons Library classes it as a medium town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for Fleet at 51.27401, -0.84069 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
Connecting solar to the Fleet network
The distribution network operator (DNO) for Fleet is Scottish and Southern Electricity Networks (SSEN), which runs the Southern England licence area.
For a typical home the paperwork is light: a system of up to 3.68kW per phase goes through G98, which means SSEN is notified within 28 days of switch-on rather than asked beforehand.
A bigger inverter or battery output needs a G99 application in advance. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW.
Sources: NESO DNO licence areas (3 May 2024); SSEN, micro-generation connections page, checked 25 September 2026. G98 vs G99, explained.

Adding a heat pump or an EV charger in Fleet
A heat pump in Fleet
Solar and a heat pump pull in opposite directions through the year: Fleet's roofs make 1,120 kWh from November to February on a 12-panel system, and 3,070 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.
Grant support in England comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).
Charging an EV in Fleet
From April to September, 68% of a Fleet roof's yearly output arrives, peaking at about 790 kWh in July on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.
The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Fleet
Guidance is nationwide, so the benchmarks hold in Fleet: repair costs, service scope, and when the inverter is the real fault.
Common questions about solar in Fleet
What could a roof in Fleet generate?
PVGIS puts a roof in Fleet at 1,023 kWh per kWp a year, 2.80 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 6,510 kWh a year, most of it between April and September.
How much are solar panels in Fleet?
The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in Fleet before a battery. What Fleet changes is the return, about 6,510 kWh a year from that system, and your design call prices your actual roof.
Do I need permission from the DNO for solar in Fleet?
Usually not in advance. SSEN, the network operator for Fleet, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW. "See our DNO explainer.
How much can I earn from exporting solar in Fleet?
With typical use and no battery, a 12-panel system in Fleet exports about 5,570 kWh a year. At 12p per kWh that is roughly £668; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.
Do solar panels work in winter in Fleet?
Yes, at a lower level. PVGIS gives Fleet 36.8 kWh per kWp in December and 40 in January, so a 12-panel system makes about 230 kWh and 250 kWh in those months, against 790 kWh in July. Winter output mostly covers daytime use rather than exporting.
How Fleet compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs Fleet |
|---|---|---|
| Fleet | 1,023 | this town |
| Farnborough | 1,022 | −1 kWh |
| Weybourne | 1,020 | −3 kWh |
| Aldershot | 1,021 | −2 kWh |
| Yateley | 1,017 | −6 kWh |
| Ash and Ash Vale | 1,024 | +1 kWh |
| Farnham | 1,020 | −3 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
Also for Fleet: Solar panels in Fleet from OVO Solar & Battery
Also near Fleet
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for Fleet
Sourced, dated and written by us. The same ground we cover on your free call.
How to clean solar panels, and whether you need to at all
Cleaning is oversold and pigeon mesh is undersold. The numbers behind both.
Read the guide →Sigenergy SigenStor review: the 5-in-1 tower examined
The 5-in-1 tower reviewed by a site that does not sell it, warranty arithmetic included.
Read the guide →The main home EV chargers, compared on what actually differs
Eight popular UK home chargers on cable, connectivity, warranty and tariff integration.
Read the guide →The Boiler Upgrade Scheme, explained
A fixed amount, claimed on your behalf by our installation teams, with a real deadline on the £9,000 version.
Read the guide →Will energy prices keep rising, and by how much
The January forecasts jumped fast. What is confirmed, what is guessed, and whether solar is a real hedge.
Read the guide →G98 or G99: which one applies, what the application involves, and how long it takes
The G98 line sits at 3.68kW per phase. Above it, your network operator has to say yes first.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.