Solar panels in Weybourne, with the numbers shown.
Twelve panels (6.36 kWp) here make about 6,490 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Weybourne's solar year
Weybourne's best month is July, at 125.6 kWh per kWp; December manages 36.9. Over the year that comes to 1,020 kWh per kWp, level with our Surrey county estimate.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 39.6 |
| February | 52.3 |
| March | 87.8 |
| April | 115 |
| May | 122 |
| June | 123 |
| July | 126 |
| August | 111 |
| September | 95.5 |
| October | 65.8 |
| November | 45.9 |
| December | 36.9 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
For scale: 1,020 kWh per kWp in Weybourne against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Weybourne 10% above it.
How Weybourne compares
Small towns rarely get published solar figures, so here are the numbers for Weybourne. It is one of 47 Surrey towns we track, and it ranks joint 31st of 47 for solar yield, a town of 11,723 people in the House of Commons Library settlement data. PVGIS gives its roofs 1,020 kWh per kWp a year, 2.80 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £913 of year one benefit, £247 of it from your own generation and £666 from export at 12p.
These are starting numbers, not a quote. The calculator below opens on Weybourne's own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.
Waverley is the planning authority covering Weybourne, which the House of Commons Library classes as a small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Generation is modelled from PVGIS satellite data for Weybourne's own coordinates (51.23391, -0.79128), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.
Who runs the grid in Weybourne
Scottish and Southern Electricity Networks (SSEN) owns and runs the local electricity network in Weybourne, as part of its Southern England licence area.
What decides the paperwork is the inverter and battery output, not the number of panels. Up to 3.68kW per phase, a system follows G98: SSEN is notified within 28 days of commissioning and nothing has to be approved first.
Anything bigger is a G99 case and is applied for first. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW.
Sources: NESO DNO licence areas (3 May 2024); SSEN, micro-generation connections page, checked 25 September 2026. G98 vs G99, explained.

Adding a heat pump or an EV charger in Weybourne
A heat pump in Weybourne
A heat pump does most of its work from November to February. Over those four months, 12 panels in Weybourne make about 1,110 kWh, against 3,060 kWh from May to August, so winter heating runs mostly on grid electricity and the tariff matters more than the roof.
In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).
Charging an EV in Weybourne
From April to September, 68% of a Weybourne roof's yearly output arrives, peaking at about 800 kWh in July on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
The packages, priced before anyone visits
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Weybourne
Faults, servicing and ageing inverters follow the same economics in Weybourne as anywhere else, and the guides below price them plainly.
Weybourne solar questions
What does a solar panel system produce in Weybourne?
Each kWp of panels in Weybourne makes 1,020 kWh a year on PVGIS figures, so a typical 12-panel system produces around 6,490 kWh, from about 230 kWh in December up to 800 kWh in July.
How much are solar panels in Weybourne?
The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in Weybourne before a battery. What Weybourne changes is the return, about 6,490 kWh a year from that system, and your design call prices your actual roof.
Would a system in Weybourne need approval from the network operator?
Weybourne is on Scottish and Southern Electricity Networks' network (Southern England licence area). Systems up to 3.68kW per phase of inverter output follow G98: SSEN is notified within 28 days of commissioning, with no approval needed first. Anything larger needs a G99 application before installation. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW. Our G98 vs G99 guide explains both routes.
How much can I earn from exporting solar in Weybourne?
With typical use and no battery, a 12-panel system in Weybourne exports about 5,551 kWh a year. At 12p per kWh that is roughly £666; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.
Is solar worth it in Weybourne in winter?
It works, but the year is lopsided. 68% of a Weybourne roof's output lands between April and September; the four months from November to February give about 1,110 kWh on a 12-panel system. Payback is worked out on the whole year, not the winter.
How Weybourne compares with its neighbours
How the towns nearest Weybourne compare on the same PVGIS settings, closest first.
| Town | kWh per kWp a year | vs Weybourne |
|---|---|---|
| Weybourne | 1,020 | this town |
| Aldershot | 1,021 | +1 kWh |
| Farnham | 1,020 | level |
| Wrecclesham | 1,014 | −6 kWh |
| Ash and Ash Vale | 1,024 | +4 kWh |
| Fleet | 1,023 | +3 kWh |
| Farnborough | 1,022 | +2 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
Also for Weybourne: Solar panels in Weybourne from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Weybourne homeowners
Sourced, dated and written by us. The same ground we cover on your free call.
Are solar panels worth it in 2026? Here is the actual maths
Roughly £1,000 per kWp installed, offsetting electricity at 26.32p a unit. The real arithmetic.
Read the guide →Sigenergy SigenStor review: the 5-in-1 tower examined
The 5-in-1 tower reviewed by a site that does not sell it, warranty arithmetic included.
Read the guide →How solar aware EV charging actually works
The CT clamp, the surplus tracking and the 1.4kW floor that catches people out.
Read the guide →Are air source heat pumps any good? What owners actually report
The UK's largest survey found 80% of heat pump owners satisfied, against 70% for gas boilers.
Read the guide →What the Smart Export Guarantee actually is
The scheme obliges suppliers to pay above zero, and leaves the rate to them.
Read the guide →G98 or G99: which one applies, what the application involves, and how long it takes
The G98 line sits at 3.68kW per phase. Above it, your network operator has to say yes first.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.