0% VAT on solar panels and batteries ends 31 March 2027. What it means for you

07782 219224

Leicestershire

Solar panels in Kibworth Beauchamp and Kibworth Harcourt.

Twelve panels here make about 6,450 kWh a year for £6,360 installed, designed on a free 30-minute video call.

Get my free quote

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation. We call or text within one working day.

Your design call is with Niall or Vince, our residential energy consultants.

or call 07782 219224

  • Free 30-minute video design call
  • Priced before anyone visits
  • Installed by our MCS-certified, fully insured teams
Sunlight in Kibworth Beauchamp and Kibworth Harcourt

Sunlight in Kibworth Beauchamp and Kibworth Harcourt, in numbers

Kibworth Beauchamp and Kibworth Harcourt's best month is July, at 124.3 kWh per kWp; December manages 35.8. Over the year that comes to 1,014 kWh per kWp, 3% above our Leicestershire county estimate.

Map showing Kibworth Beauchamp and Kibworth Harcourt in Leicestershire A simplified outline map of Leicestershire with neighbouring counties shown faintly, and a pin marking the location of Kibworth Beauchamp and Kibworth Harcourt.
Kibworth Beauchamp and Kibworth Harcourt in Leicestershire

Generation per kWp, month by month

Kibworth Beauchamp and Kibworth Harcourt, 1,014 kWh per kWp a year
Kibworth Beauchamp and Kibworth Harcourt, monthly generation per kWp Bar chart, twelve months January to December. Peak July at 124 kWh/kWp. Lowest December at 35.8 kWh/kWp. Full values are in the table below this chart. 143 0 JFMAMJJASOND 124
Show the monthly figures
Kibworth Beauchamp and Kibworth Harcourt, monthly generation per kWp - monthly figures (kWh/kWp)
MonthkWh/kWp
January37.9
February52
March88.4
April114
May124
June120
July124
August111
September95.4
October66.5
November45.5
December35.8

Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.

6,450kWh a year, 12 panels
790kWh in July, the peak
230kWh in December

For scale: 1,014 kWh per kWp in Kibworth Beauchamp and Kibworth Harcourt against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Kibworth Beauchamp and Kibworth Harcourt 10% above it.

How Kibworth Beauchamp and Kibworth Harcourt compares

Small towns rarely get published solar figures, so here are the numbers for Kibworth Beauchamp and Kibworth Harcourt. It is one of 26 Leicestershire towns we track, and it ranks 2nd of 26 for solar yield, a town of 7,642 people in the House of Commons Library settlement data. PVGIS gives its roofs 1,014 kWh per kWp a year, 2.78 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £908 of year one benefit, £247 of it from your own generation and £661 from export at 12p.

Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Kibworth Beauchamp and Kibworth Harcourt's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.

Planning applications here go through Harborough; nationally, the House of Commons Library classes Kibworth Beauchamp and Kibworth Harcourt as a small town.

12 panels
530W panels. Most semi-detached roofs take 10 to 16 on one pitch.
Add a battery?
Installed prices. The named packages are the ones running on our current offers; the Duracell prices are for an installation alongside solar.
Electricity use
Export rate scenario
EV charger?
Estimated benefit, year one
£908
£76 a month · payback 7.0 yrs
System price, installed
£6,360
Simple payback
7.0 yrs
Generates a year
6,449 kWh
Exported
5,512 kWh at 12p
Where the money comes from
Solar you use, Export income, Off-peak shifting,

Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.

Price this for your roof

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation, nobody visits your home. Prefer to talk? 07782 219224

Your design call is with Niall or Vince, our residential energy consultants.

Modelled for Kibworth Beauchamp and Kibworth Harcourt at 52.53937, -0.99709 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.

Local grid

NGED and your Kibworth Beauchamp and Kibworth Harcourt connection

The distribution network operator (DNO) for Kibworth Beauchamp and Kibworth Harcourt is National Grid Electricity Distribution (NGED), which runs the East Midlands licence area.

For a typical home the paperwork is light: a system of up to 3.68kW per phase goes through G98, which means NGED is notified within 28 days of switch-on rather than asked beforehand.

Above that, G99 means applying before the work is booked. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.

Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Aerial view of a flat-roof garden building with a black solar panel array, on a residential street
A flat-roof garden building fitted with its own solar array.
Beyond solar

Heat pumps and EV charging in Kibworth Beauchamp and Kibworth Harcourt

A heat pump in Kibworth Beauchamp and Kibworth Harcourt

In December, the darkest month here, 12 panels in Kibworth Beauchamp and Kibworth Harcourt make about 230 kWh. That is when a heat pump runs hardest, so its running cost in Kibworth Beauchamp and Kibworth Harcourt comes down to the tariff and the flow temperature rather than the roof.

In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).

How heat pumps work

Charging an EV in Kibworth Beauchamp and Kibworth Harcourt

Kibworth Beauchamp and Kibworth Harcourt's July output, about 790 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.

If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.

EV charging explained

Already got panels?

Solar panel servicing and repair in Kibworth Beauchamp and Kibworth Harcourt

If a system in Kibworth Beauchamp and Kibworth Harcourt is underperforming, start with the guides below: repair benchmarks, service scope, and the inverter question.

FAQs

Kibworth Beauchamp and Kibworth Harcourt solar questions

How much energy would 12 solar panels make in Kibworth Beauchamp and Kibworth Harcourt?

Kibworth Beauchamp and Kibworth Harcourt averages 2.78 peak sun hours a day, which PVGIS turns into 1,014 kWh per kWp a year. On a 12-panel, 6.36 kWp roof that is about 6,450 kWh, 68% of it between April and September.

Is solar more expensive in Kibworth Beauchamp and Kibworth Harcourt?

Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Kibworth Beauchamp and Kibworth Harcourt, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,450 kWh a year here, which is what drives payback.

Who is the network operator in Kibworth Beauchamp and Kibworth Harcourt, and do I need a G99 application?

The operator is National Grid Electricity Distribution (NGED). Most home systems use the G98 route, a notification within 28 days of switch-on for up to 3.68kW per phase, so nothing waits on the network. Above that, G99 applies and has to be granted first. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late. Your design call checks which route yours needs.

What could I earn from exporting in Kibworth Beauchamp and Kibworth Harcourt?

On the 12p export scenario, a 12-panel system in Kibworth Beauchamp and Kibworth Harcourt sends about 5,512 kWh a year to the grid, worth around £661. The export rates table compares what each supplier pays.

How does solar perform in Kibworth Beauchamp and Kibworth Harcourt in the winter months?

December is the weakest month in Kibworth Beauchamp and Kibworth Harcourt: about 230 kWh from 12 panels, against 790 kWh in July. The panels still generate on bright winter days; they just cover a smaller share of what the house uses.

How Kibworth Beauchamp and Kibworth Harcourt compares with its neighbours

Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.

TownkWh per kWp a yearvs Kibworth Beauchamp and Kibworth Harcourt
Kibworth Beauchamp and Kibworth Harcourt1,014this town
Market Harborough1,015+1 kWh
Oadby1,005−9 kWh
Wigston997−17 kWh
Countesthorpe996−18 kWh
Blaby and Whetstone993−21 kWh
Leicester994−20 kWh

Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.

All of Leicestershire

Also near Kibworth Beauchamp and Kibworth Harcourt

Instant estimate

See a number before you speak to anyone

Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.

Free, no obligation

Get my free quote

Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.

Installations can only go ahead for homeowners, as the system is fixed to the property. Do carry on if you own it, or you are about to.
Flats and apartments usually share a roof, which rules most installations out. Send your details anyway and we will tell you honestly what is possible.
1 Where is your home?
Please add your full postcode
Please add your house number
2 About you
Please add your first name
Please add your last name
Please add a UK number
Please add a valid email
3 Your property
Do you own your home?
Please let us know
Property type
Please choose your property type
4 What are you after?
Please pick one, "not sure" is fine
Roughly is fine
Please choose a timeframe
5 When shall we call?
Best time for you (optional, but it helps)

We never call after 8pm.

We call or text within one working day to book your free 30-minute video design call. Free, no obligation, wherever you are in Kibworth Beauchamp and Kibworth Harcourt. No home visit needed.

Your design call is with Niall or Vince, our residential energy consultants.

Call 07782 219224

By submitting you agree we can contact you about your enquiry. We never sell your details and never pass them to a panel of companies to ring you. See our privacy notice.