Solar panels in Maesteg, with the numbers shown.
About 6,070 kWh a year from 12 panels in Maesteg, £6,360 installed, with your system designed on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Maesteg's solar year
PVGIS puts Maesteg at 954 kWh per kWp a year, 1% above our Glamorgan county estimate. 69% of it arrives between April and September, peaking in May.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 31.7 |
| February | 50.5 |
| March | 85.1 |
| April | 113 |
| May | 122 |
| June | 117 |
| July | 116 |
| August | 100 |
| September | 88.5 |
| October | 58.2 |
| November | 40.5 |
| December | 30.7 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 954, Maesteg is 3% above it.
How Maesteg compares
Small towns rarely get published solar figures, so here are the numbers for Maesteg. It is one of 32 Glamorgan towns we track, and it ranks 26th of 32 for solar yield, a town of 18,278 people in the House of Commons Library settlement data. PVGIS gives its roofs 954 kWh per kWp a year, 2.61 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £863 of year one benefit, £247 of it from your own generation and £616 from export at 12p.
These are starting numbers, not a quote. The calculator below opens on Maesteg's own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.
Bridgend is the planning authority covering Maesteg, which the House of Commons Library classes as a small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Generation is modelled from PVGIS satellite data for Maesteg's own coordinates (51.61143, -3.65381), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.
Who runs the grid in Maesteg
Maesteg is served by National Grid Electricity Distribution (NGED): the town's centre falls inside its South Wales licence area on NESO's boundary map.
What decides the paperwork is the inverter and battery output, not the number of panels. Up to 3.68kW per phase, a system follows G98: NGED is notified within 28 days of commissioning and nothing has to be approved first.
A bigger inverter or battery output needs a G99 application in advance. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.
Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Adding a heat pump or an EV charger in Maesteg
A heat pump in Maesteg
A heat pump does most of its work from November to February. Over those four months, 12 panels in Maesteg make about 980 kWh, against 2,900 kWh from May to August, so winter heating runs mostly on grid electricity and the tariff matters more than the roof.
In Wales, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).
Charging an EV in Maesteg
From April to September, 69% of a Maesteg roof's yearly output arrives, peaking at about 780 kWh in May on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.
Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.
The packages, priced before anyone visits
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Maesteg
Faults, servicing and ageing inverters follow the same economics in Maesteg as anywhere else, and the guides below price them plainly.
Maesteg solar questions
What does a solar panel system produce in Maesteg?
Each kWp of panels in Maesteg makes 954 kWh a year on PVGIS figures, so a typical 12-panel system produces around 6,070 kWh, from about 200 kWh in December up to 780 kWh in May.
How much are solar panels in Maesteg?
The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in Maesteg before a battery. What Maesteg changes is the return, about 6,070 kWh a year from that system, and your design call prices your actual roof.
Would a system in Maesteg need approval from the network operator?
Maesteg is on National Grid Electricity Distribution's network (South Wales licence area). Systems up to 3.68kW per phase of inverter output follow G98: NGED is notified within 28 days of commissioning, with no approval needed first. Anything larger needs a G99 application before installation. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late. Our G98 vs G99 guide explains both routes.
How much can I earn from exporting solar in Maesteg?
With typical use and no battery, a 12-panel system in Maesteg exports about 5,131 kWh a year. At 12p per kWh that is roughly £616; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.
Is solar worth it in Maesteg in winter?
It works, but the year is lopsided. 69% of a Maesteg roof's output lands between April and September; the four months from November to February give about 980 kWh on a 12-panel system. Payback is worked out on the whole year, not the winter.
How Maesteg compares with its neighbours
How the towns nearest Maesteg compare on the same PVGIS settings, closest first.
| Town | kWh per kWp a year | vs Maesteg |
|---|---|---|
| Maesteg | 954 | this town |
| Sarn, Tondu and Bryncethin | 1,058 | +104 kWh |
| Port Talbot | 1,026 | +72 kWh |
| North Cornelly and Kenfig Hill | 1,059 | +105 kWh |
| Treorchy | 925 | −29 kWh |
| Baglan | 1,027 | +73 kWh |
| Neath | 996 | +42 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
Also for Maesteg: Solar panels in Maesteg from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Maesteg homeowners
Sourced, dated and written by us. The same ground we cover on your free call.
Do solar panels work in winter? Yes, just less than summer
Panels run on light, not sunshine. Cloud turns them down, not off. What that means for an awkward roof.
Read the guide →How much a battery saves by charging on cheap night rates
What charging at 8.5p and using at 26.32p is actually worth over a year.
Read the guide →How time of use charging windows actually work
How a cheap overnight window is metered and billed, and what a battery does inside it.
Read the guide →Sizing a heat pump: what a proper survey covers
Sized by calculation, not by rule of thumb. What the survey covers, and what guessing costs.
Read the guide →What the Smart Export Guarantee actually is
The scheme obliges suppliers to pay above zero, and leaves the rate to them.
Read the guide →Your MCS certificate: what it shows, when it arrives, and how a Smart Export Guarantee supplier uses it
The document your export payments hang on. Who issues it, what it shows, and how to get a copy.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.