Solar panels in North Cornelly and Kenfig Hill.
Twelve panels here make about 6,740 kWh a year for £6,360 installed, designed on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
How much a North Cornelly and Kenfig Hill roof makes, month by month
PVGIS puts North Cornelly and Kenfig Hill at 1,059 kWh per kWp a year, 13% above our Glamorgan county estimate. 69% of it arrives between April and September, peaking in May.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 36.2 |
| February | 56.7 |
| March | 93.3 |
| April | 124 |
| May | 135 |
| June | 130 |
| July | 130 |
| August | 115 |
| September | 97.5 |
| October | 64.1 |
| November | 44.7 |
| December | 33.2 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Against Great Britain as a whole: North Cornelly and Kenfig Hill makes 1,059 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so North Cornelly and Kenfig Hill is 14% above it.
How North Cornelly and Kenfig Hill compares
Small towns rarely get published solar figures, so here are the numbers for North Cornelly and Kenfig Hill. It is one of 32 Glamorgan towns we track, and it ranks joint 3rd of 32 for solar yield, a town of 14,138 people in the House of Commons Library settlement data. PVGIS gives its roofs 1,059 kWh per kWp a year, 2.90 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £943 of year one benefit, £247 of it from your own generation and £696 from export at 12p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on North Cornelly and Kenfig Hill's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Planning applications here go through Bridgend; nationally, the House of Commons Library classes North Cornelly and Kenfig Hill as a small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Generation is modelled from PVGIS satellite data for North Cornelly and Kenfig Hill's own coordinates (51.52676, -3.69206), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.
NGED and your North Cornelly and Kenfig Hill connection
On NESO's licence-area map, North Cornelly and Kenfig Hill is in South Wales, which National Grid Electricity Distribution (NGED) operates. That makes NGED the network operator for any system fitted here.
Below 3.68kW per phase of inverter and battery output, the G98 route applies: the installation is notified to NGED within 28 days of commissioning, with no prior approval.
Above that, G99 means applying before the work is booked. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.
Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in North Cornelly and Kenfig Hill
A heat pump in North Cornelly and Kenfig Hill
Heating demand peaks when solar is weakest. In North Cornelly and Kenfig Hill, a 12-panel system makes about 210 kWh in December and 230 kWh in January, a fraction of its 860 kWh in May, which is why a heat pump here is costed on its tariff first.
Grant support in Wales comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).
Charging an EV in North Cornelly and Kenfig Hill
North Cornelly and Kenfig Hill's May output, about 860 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.
The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in North Cornelly and Kenfig Hill
The same sourced benchmarks apply in North Cornelly and Kenfig Hill as everywhere we cover: honest repair pricing and what a service should include.
Solar in North Cornelly and Kenfig Hill: your questions answered
How much electricity do solar panels make in North Cornelly and Kenfig Hill?
About 6,740 kWh a year from 12 panels (6.36 kWp), on PVGIS satellite data for North Cornelly and Kenfig Hill: 1,059 kWh per kWp, or 2.90 peak sun hours a day on average. May is the strongest month, at about 860 kWh.
Is solar more expensive in North Cornelly and Kenfig Hill?
Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in North Cornelly and Kenfig Hill, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,740 kWh a year here, which is what drives payback.
Which DNO covers North Cornelly and Kenfig Hill, and what does it need from me?
National Grid Electricity Distribution (NGED) covers North Cornelly and Kenfig Hill. A home system of up to 3.68kW per phase is notified to NGED within 28 days of commissioning under G98, and nothing waits on approval. Larger outputs need a G99 application before work starts. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.
What could I earn from exporting in North Cornelly and Kenfig Hill?
On the 12p export scenario, a 12-panel system in North Cornelly and Kenfig Hill sends about 5,799 kWh a year to the grid, worth around £696. The export rates table compares what each supplier pays.
How much solar does North Cornelly and Kenfig Hill get in December?
December is the low point: about 210 kWh from a 12-panel system in North Cornelly and Kenfig Hill, on PVGIS data, rising to 860 kWh in May. From November to February the same system makes about 1,090 kWh in total, which is why a battery charged off-peak does more of the work in winter.
How North Cornelly and Kenfig Hill compares with its neighbours
The six closest towns we publish, run through the identical PVGIS query as North Cornelly and Kenfig Hill.
| Town | kWh per kWp a year | vs North Cornelly and Kenfig Hill |
|---|---|---|
| North Cornelly and Kenfig Hill | 1,059 | this town |
| Porthcawl | 1,059 | level |
| Sarn, Tondu and Bryncethin | 1,058 | −1 kWh |
| Bridgend | 1,057 | −2 kWh |
| Port Talbot | 1,026 | −33 kWh |
| Maesteg | 954 | −105 kWh |
| Pencoed | 1,051 | −8 kWh |
Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.
Also for North Cornelly and Kenfig Hill: Solar panels in North Cornelly and Kenfig Hill from OVO Solar & Battery
Also near North Cornelly and Kenfig Hill
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Guides worth reading before your call
Sourced, dated and written by us. The same ground we cover on your free call.
DNO application timescales, network by network: from a G98 notification to a G99 approval
Fit and notify within 28 days, or wait ten working days to 45 for a yes. System size decides which.
Read the guide →How much a battery saves by charging on cheap night rates
What charging at 8.5p and using at 26.32p is actually worth over a year.
Read the guide →How time of use charging windows actually work
How a cheap overnight window is metered and billed, and what a battery does inside it.
Read the guide →What MCS certification actually buys you on a heat pump job
The gate on the £7,500 grant, the design standard behind your running costs, and the noise sign-off.
Read the guide →Choosing a tariff when you have solar, a battery and an EV
Solar, battery and EV want different tariffs. How to work out which one to protect.
Read the guide →Your MCS certificate: what it shows, when it arrives, and how a Smart Export Guarantee supplier uses it
The document your export payments hang on. Who issues it, what it shows, and how to get a copy.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.