Solar panels in Middleton, with the numbers shown.

Twelve panels (6.36 kWp) here make about 5,500 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.

Get my free quote

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation. We call or text within one working day.

Your design call is with Niall or Vince, our residential energy consultants.

or call 07782 219224

  • Free 30-minute video design call
  • Priced before anyone visits
  • Installed by our MCS-certified, fully insured teams
Sunlight in Middleton

What a roof in Middleton can generate

From 25 kWh per kWp in January to 112.9 in May: a roof in Middleton makes 4.5 times as much in its best month as in its darkest, and 865 kWh per kWp across the year.

Map showing Middleton in Lancashire A simplified outline map of Lancashire with neighbouring counties shown faintly, and a pin marking the location of Middleton.
Middleton in Lancashire

Generation per kWp, month by month

Middleton, 865 kWh per kWp a year
Middleton, monthly generation per kWp Bar chart, twelve months January to December. Peak May at 113 kWh/kWp. Lowest January at 25 kWh/kWp. Full values are in the table below this chart. 130 0 JFMAMJJASOND 113
Show the monthly figures
Middleton, monthly generation per kWp - monthly figures (kWh/kWp)
MonthkWh/kWp
January25
February44.8
March77.3
April102
May113
June107
July107
August93.8
September79.1
October53.4
November36.7
December25.9

Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.

5,500kWh a year, 12 panels
720kWh in May, the peak
160kWh in January

Against Great Britain as a whole: Middleton makes 865 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so Middleton is 6% below it.

How Middleton compares

Among the places we publish figures for, Middleton is one of 109 Lancashire towns we track, and it ranks 92nd of 109 for solar yield. It is a medium town in the House of Commons Library classification, with 50,141 residents, and its roofs see 2.37 peak sun hours a day across the year. That drives the standard 12 panel model to 5,501 kWh of generation, of which around 4,565 kWh is exported at 12p for £548 a year, with £247 saved on electricity you would otherwise buy at 26.32p.

Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on Middleton's own yield.

Middleton sits within Rochdale, its local planning authority, and the House of Commons Library classes it as a medium town.

12 panels
530W panels. Most semi-detached roofs take 10 to 16 on one pitch.
Add a battery?
Installed prices. The named packages are the ones running on our current offers; the Duracell prices are for an installation alongside solar.
Electricity use
Export rate scenario
EV charger?
Estimated benefit, year one
£794
£66 a month · payback 8.0 yrs
System price, installed
£6,360
Simple payback
8.0 yrs
Generates a year
5,501 kWh
Exported
4,565 kWh at 12p
Where the money comes from
Solar you use, Export income, Off-peak shifting,

Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.

Price this for your roof

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation, nobody visits your home. Prefer to talk? 07782 219224

Your design call is with Niall or Vince, our residential energy consultants.

Modelled for Middleton at 53.55114, -2.19575 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.

Local grid

Connecting solar to the Middleton network

Middleton sits in Electricity North West's North West England licence area, so Electricity North West is the network operator (DNO) any solar panels or battery here are registered with.

Below 3.68kW per phase of inverter and battery output, the G98 route applies: the installation is notified to Electricity North West within 28 days of commissioning, with no prior approval.

Anything bigger is a G99 case and is applied for first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds Electricity North West as it does every network operator.

Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Aerial view of a red-brick new-build home with a dark solar panel array on the front roof pitch
A dense panel array fitted to a new-build home's front roof pitch.
Beyond solar

Beyond the panels: heating and car charging in Middleton

A heat pump in Middleton

Solar and a heat pump pull in opposite directions through the year: Middleton's roofs make 840 kWh from November to February on a 12-panel system, and 2,680 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.

Grant support in England comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).

How heat pumps work

Charging an EV in Middleton

From April to September, 70% of a Middleton roof's yearly output arrives, peaking at about 720 kWh in May on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.

If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.

EV charging explained

Already got panels?

Solar panel servicing and repair in Middleton

Guidance is nationwide, so the benchmarks hold in Middleton: repair costs, service scope, and when the inverter is the real fault.

FAQs

Common questions about solar in Middleton

What could a roof in Middleton generate?

PVGIS puts a roof in Middleton at 865 kWh per kWp a year, 2.37 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 5,500 kWh a year, most of it between April and September.

What would 12 solar panels cost in Middleton?

£6,360 for 12 panels (6.36 kWp), the same as in every other place we cover, because solar is priced at £1,000 per kWp installed rather than by area. A battery adds its own installed price on top. Where Middleton differs is output: about 5,500 kWh a year from that system.

Do I need permission from the DNO for solar in Middleton?

Usually not in advance. Electricity North West, the network operator for Middleton, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds Electricity North West as it does every network operator. "See our DNO explainer.

How much would export pay on a system in Middleton?

It is exported. With typical use and no battery, about 4,565 kWh of the 5,500 kWh a 12-panel system makes in Middleton goes to the grid, around £548 a year at 12p. A battery keeps more of it for the evening; the export rates table shows what suppliers pay.

Do solar panels work in winter in Middleton?

Yes, at a lower level. PVGIS gives Middleton 25.9 kWh per kWp in December and 25 in January, so a 12-panel system makes about 160 kWh and 160 kWh in those months, against 720 kWh in May. Winter output mostly covers daytime use rather than exporting.

How Middleton compares with its neighbours

How the towns nearest Middleton compare on the same PVGIS settings, closest first.

TownkWh per kWp a yearvs Middleton
Middleton865this town
Chadderton876+11 kWh
Heywood878+13 kWh
Royton854−11 kWh
Failsworth875+10 kWh
Prestwich895+30 kWh
Oldham862−3 kWh

PVGIS v5.2 for each town centroid, identical assumptions throughout. A few kWh either way is weather-year noise; a spread beyond about 30 kWh per kWp is real geography.

Also for Middleton: Solar panels in Middleton from OVO Solar & Battery

All of Lancashire

Also near Middleton

Instant estimate

See a number before you speak to anyone

Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.

Free, no obligation

Get my free quote

Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.

Installations can only go ahead for homeowners, as the system is fixed to the property. Do carry on if you own it, or you are about to.
Flats and apartments usually share a roof, which rules most installations out. Send your details anyway and we will tell you honestly what is possible.
1 Where is your home?
Please add your full postcode
Please add your house number
2 About you
Please add your first name
Please add your last name
Please add a UK number
Please add a valid email
3 Your property
Do you own your home?
Please let us know
Property type
Please choose your property type
4 What are you after?
Please pick one, "not sure" is fine
Roughly is fine
Please choose a timeframe
5 When shall we call?
Best time for you (optional, but it helps)

We never call after 8pm.

We call or text within one working day to book your free 30-minute video design call. Free, no obligation, wherever you are in Middleton. No home visit needed.

Your design call is with Niall or Vince, our residential energy consultants.

Call 07782 219224

By submitting you agree we can contact you about your enquiry. We never sell your details and never pass them to a panel of companies to ring you. See our privacy notice.