0% VAT on solar panels and batteries ends 31 March 2027. What it means for you

07782 219224

Staffordshire

Solar panels in Newcastle-under-Lyme, designed on a free call.

Twelve panels (6.36 kWp) here make about 5,930 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.

Get my free quote

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation. We call or text within one working day.

Your design call is with Niall or Vince, our residential energy consultants.

or call 07782 219224

  • Free 30-minute video design call
  • Priced before anyone visits
  • Installed by our MCS-certified, fully insured teams
Sunlight in Newcastle-under-Lyme

Sunlight in Newcastle-under-Lyme, in numbers

Newcastle-under-Lyme's best month is May, at 117.2 kWh per kWp; December manages 30.3. Over the year that comes to 932 kWh per kWp, 2% below our Staffordshire county estimate.

Map showing Newcastle-under-Lyme in Staffordshire A simplified outline map of Staffordshire with neighbouring counties shown faintly, and a pin marking the location of Newcastle-under-Lyme.
Newcastle-under-Lyme in Staffordshire

Generation per kWp, month by month

Newcastle-under-Lyme, 932 kWh per kWp a year
Newcastle-under-Lyme, monthly generation per kWp Bar chart, twelve months January to December. Peak May at 117 kWh/kWp. Lowest December at 30.3 kWh/kWp. Full values are in the table below this chart. 135 0 JFMAMJJASOND 117
Show the monthly figures
Newcastle-under-Lyme, monthly generation per kWp - monthly figures (kWh/kWp)
MonthkWh/kWp
January30.8
February48.4
March81.2
April108
May117
June113
July115
August103
September87.8
October57.7
November39.2
December30.3

Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.

5,930kWh a year, 12 panels
750kWh in May, the peak
190kWh in December

Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 932, Newcastle-under-Lyme is 1% above it.

How Newcastle-under-Lyme compares

Newcastle-under-Lyme is one of 44 Staffordshire towns we track, and it ranks 40th of 44 for solar yield. The House of Commons Library settlement data classes it as a large town of 79,601 people. At 932 kWh per kWp a year, a typical 12 panel system here pays for itself in around 7.5 years on the 12p scenario: £845 of year one benefit against £6,360 installed, £247 of that benefit from cutting 26.32p imports with your own generation.

Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Newcastle-under-Lyme's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.

Newcastle-under-Lyme is its own local planning authority area, and its House of Commons Library settlement class is large town.

12 panels
530W panels. Most semi-detached roofs take 10 to 16 on one pitch.
Add a battery?
Installed prices. The named packages are the ones running on our current offers; the Duracell prices are for an installation alongside solar.
Electricity use
Export rate scenario
EV charger?
Estimated benefit, year one
£845
£70 a month · payback 7.5 yrs
System price, installed
£6,360
Simple payback
7.5 yrs
Generates a year
5,928 kWh
Exported
4,991 kWh at 12p
Where the money comes from
Solar you use, Export income, Off-peak shifting,

Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.

Price this for your roof

Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.

Please add your full postcode
Please add your first name
Please enter a UK mobile or landline

Free, no obligation, nobody visits your home. Prefer to talk? 07782 219224

Your design call is with Niall or Vince, our residential energy consultants.

The figures use PVGIS for the centre of Newcastle-under-Lyme (53.01956, -2.23708), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.

Local grid

NGED and your Newcastle-under-Lyme connection

On NESO's licence-area map, Newcastle-under-Lyme is in West Midlands, which National Grid Electricity Distribution (NGED) operates. That makes NGED the network operator for any system fitted here.

Below 3.68kW per phase of inverter and battery output, the G98 route applies: the installation is notified to NGED within 28 days of commissioning, with no prior approval.

Above that, G99 means applying before the work is booked. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.

Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Aerial view of a red-brick new-build home with a dark solar panel array on the front roof pitch
A dense panel array fitted to a new-build home's front roof pitch.
Beyond solar

Heat pumps and EV charging in Newcastle-under-Lyme

A heat pump in Newcastle-under-Lyme

In December, the darkest month here, 12 panels in Newcastle-under-Lyme make about 190 kWh. That is when a heat pump runs hardest, so its running cost in Newcastle-under-Lyme comes down to the tariff and the flow temperature rather than the roof.

In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).

How heat pumps work

Charging an EV in Newcastle-under-Lyme

Newcastle-under-Lyme's May output, about 750 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.

If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.

EV charging explained

Already got panels?

Solar panel servicing and repair in Newcastle-under-Lyme

If a system in Newcastle-under-Lyme is underperforming, start with the guides below: repair benchmarks, service scope, and the inverter question.

FAQs

Newcastle-under-Lyme solar questions

How much energy would 12 solar panels make in Newcastle-under-Lyme?

Newcastle-under-Lyme averages 2.55 peak sun hours a day, which PVGIS turns into 932 kWh per kWp a year. On a 12-panel, 6.36 kWp roof that is about 5,930 kWh, 69% of it between April and September.

Is solar more expensive in Newcastle-under-Lyme?

Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Newcastle-under-Lyme, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 5,930 kWh a year here, which is what drives payback.

Who is the network operator in Newcastle-under-Lyme, and do I need a G99 application?

The operator is National Grid Electricity Distribution (NGED). Most home systems use the G98 route, a notification within 28 days of switch-on for up to 3.68kW per phase, so nothing waits on the network. Above that, G99 applies and has to be granted first. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late. Your design call checks which route yours needs.

What could I earn from exporting in Newcastle-under-Lyme?

On the 12p export scenario, a 12-panel system in Newcastle-under-Lyme sends about 4,991 kWh a year to the grid, worth around £599. The export rates table compares what each supplier pays.

How does solar perform in Newcastle-under-Lyme in the winter months?

December is the weakest month in Newcastle-under-Lyme: about 190 kWh from 12 panels, against 750 kWh in May. The panels still generate on bright winter days; they just cover a smaller share of what the house uses.

How Newcastle-under-Lyme compares with its neighbours

How the towns nearest Newcastle-under-Lyme compare on the same PVGIS settings, closest first.

TownkWh per kWp a yearvs Newcastle-under-Lyme
Newcastle-under-Lyme932this town
Stoke-on-Trent925−7 kWh
Kidsgrove917−15 kWh
Alsager930−2 kWh
Biddulph910−22 kWh
Stone951+19 kWh
Sandbach931−1 kWh

PVGIS v5.2 for each town centroid, identical assumptions throughout. A few kWh either way is weather-year noise; a spread beyond about 30 kWh per kWp is real geography.

Also for Newcastle-under-Lyme: Solar panels in Newcastle-under-Lyme from OVO Solar & Battery

All of Staffordshire

Also near Newcastle-under-Lyme

Instant estimate

See a number before you speak to anyone

Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.

Free, no obligation

Get my free quote

Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.

Installations can only go ahead for homeowners, as the system is fixed to the property. Do carry on if you own it, or you are about to.
Flats and apartments usually share a roof, which rules most installations out. Send your details anyway and we will tell you honestly what is possible.
1 Where is your home?
Please add your full postcode
Please add your house number
2 About you
Please add your first name
Please add your last name
Please add a UK number
Please add a valid email
3 Your property
Do you own your home?
Please let us know
Property type
Please choose your property type
4 What are you after?
Please pick one, "not sure" is fine
Roughly is fine
Please choose a timeframe
5 When shall we call?
Best time for you (optional, but it helps)

We never call after 8pm.

We call or text within one working day to book your free 30-minute video design call. Free, no obligation, wherever you are in Newcastle-under-Lyme. No home visit needed.

Your design call is with Niall or Vince, our residential energy consultants.

Call 07782 219224

By submitting you agree we can contact you about your enquiry. We never sell your details and never pass them to a panel of companies to ring you. See our privacy notice.