Solar panels in Redhill, with the numbers shown.
About 6,570 kWh a year from 12 panels in Redhill, £6,360 installed, with your system designed on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
What a roof in Redhill can generate
PVGIS puts Redhill at 1,033 kWh per kWp a year, 1% above our Surrey county estimate. 68% of it arrives between April and September, peaking in July.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 38.3 |
| February | 52.6 |
| March | 88.6 |
| April | 117 |
| May | 125 |
| June | 126 |
| July | 128 |
| August | 112 |
| September | 96.8 |
| October | 66.3 |
| November | 46.6 |
| December | 34.9 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 1,033, Redhill is 12% above it.
How Redhill compares
Among the places we publish figures for, Redhill is one of 47 Surrey towns we track, and it ranks 7th of 47 for solar yield. It is a medium town in the House of Commons Library classification, with 35,416 residents, and its roofs see 2.83 peak sun hours a day across the year. That drives the standard 12 panel model to 6,570 kWh of generation, of which around 5,633 kWh is exported at 12p for £676 a year, with £247 saved on electricity you would otherwise buy at 26.32p.
These are starting numbers, not a quote. The calculator below opens on Redhill's own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.
Redhill sits within Reigate and Banstead, its local planning authority, and the House of Commons Library classes it as a medium town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Generation is modelled from PVGIS satellite data for Redhill's own coordinates (51.23455, -0.17057), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.
Connecting solar to the Redhill network
UK Power Networks owns and runs the local electricity network in Redhill, as part of its South East England licence area.
For a typical home the paperwork is light: a system of up to 3.68kW per phase goes through G98, which means UK Power Networks is notified within 28 days of switch-on rather than asked beforehand.
Anything bigger is a G99 case and is applied for first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Adding a heat pump or an EV charger in Redhill
A heat pump in Redhill
Solar and a heat pump pull in opposite directions through the year: Redhill's roofs make 1,100 kWh from November to February on a 12-panel system, and 3,120 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.
In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).
Charging an EV in Redhill
From April to September, 68% of a Redhill roof's yearly output arrives, peaking at about 820 kWh in July on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.
Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.
The packages, priced before anyone visits
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Redhill
Guidance is nationwide, so the benchmarks hold in Redhill: repair costs, service scope, and when the inverter is the real fault.
Redhill solar questions
What could a roof in Redhill generate?
PVGIS puts a roof in Redhill at 1,033 kWh per kWp a year, 2.83 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 6,570 kWh a year, most of it between April and September.
How much are solar panels in Redhill?
The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in Redhill before a battery. What Redhill changes is the return, about 6,570 kWh a year from that system, and your design call prices your actual roof.
Do I need permission from the DNO for solar in Redhill?
Usually not in advance. UK Power Networks, the network operator for Redhill, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator. "See our DNO explainer.
How much can I earn from exporting solar in Redhill?
With typical use and no battery, a 12-panel system in Redhill exports about 5,633 kWh a year. At 12p per kWh that is roughly £676; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.
Do solar panels work in winter in Redhill?
Yes, at a lower level. PVGIS gives Redhill 34.9 kWh per kWp in December and 38.3 in January, so a 12-panel system makes about 220 kWh and 240 kWh in those months, against 820 kWh in July. Winter output mostly covers daytime use rather than exporting.
How Redhill compares with its neighbours
The six closest towns we publish, run through the identical PVGIS query as Redhill.
| Town | kWh per kWp a year | vs Redhill |
|---|---|---|
| Redhill | 1,033 | this town |
| Reigate | 1,040 | +7 kWh |
| South Merstham | 1,029 | −4 kWh |
| Horley | 1,032 | −1 kWh |
| Caterham | 1,031 | −2 kWh |
| Tadworth and Epsom Downs | 1,019 | −14 kWh |
| Banstead | 1,016 | −17 kWh |
Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.
Also for Redhill: Solar panels in Redhill from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Guides worth reading before your call
Sourced, dated and written by us. The same ground we cover on your free call.
The 0% VAT deadline: what ends on 31 March 2027, and what it costs to miss it
The install deadline is still 31 March 2027. Electricity's 0% VAT was extended to the end of June.
Read the guide →How much a battery saves by charging on cheap night rates
What charging at 8.5p and using at 26.32p is actually worth over a year.
Read the guide →Three phase and EV charging: what actually changes
Three phase buys 22kW charging. Most cars cannot use it, and load balancing usually solves the real problem.
Read the guide →Which homes suit a heat pump, and which need work first
The trial data says no property type is unsuitable. Design quality decides the outcome.
Read the guide →What the Smart Export Guarantee actually is
The scheme obliges suppliers to pay above zero, and leaves the rate to them.
Read the guide →G98 or G99: which one applies, what the application involves, and how long it takes
The G98 line sits at 3.68kW per phase. Above it, your network operator has to say yes first.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.