Solar panels in Berwickshire, priced before anyone visits.
A 12-panel roof in Berwickshire makes about 5,970 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
What a roof in Berwickshire can generate
PVGIS puts Berwickshire at 939 kWh per kWp a year, 2% above the mean of our 85 county estimates. 70% of it arrives between April and September, peaking in May.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 29 |
| February | 48.9 |
| March | 80.6 |
| April | 111 |
| May | 125 |
| June | 113 |
| July | 118 |
| August | 105 |
| September | 86.9 |
| October | 59 |
| November | 39.7 |
| December | 24.5 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Against Great Britain as a whole: Berwickshire makes 939 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so Berwickshire is 2% above it.
How Berwickshire compares
Berwickshire ranks 41st of the 85 counties we track for solar yield, 12% above the Scotland average of our estimates. At 2.57 peak sun hours a day the sums lean on a healthy mix: £247 of the year one benefit here comes from solar you use yourself, with export at 12p adding £604.
Treat these as calibration rather than a quote. The calculator below opens on Berwickshire's own PVGIS yield and prices a 12 panel system at £6,360 installed before any battery; your free design call reworks every number for your roof.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Generation from PVGIS v5.2 (European Commission JRC, SARAH3), retrieved August 2026 for a representative point in Berwickshire (55.7678, -2.4475), assuming 1 kWp, 14% system loss, 35 degree pitch, due south. Import valued at 26.32p/kWh (Ofgem price cap average, Oct to Dec 2026); off-peak charging at 8.5p/kWh where used (a supplier's published off-peak rate, checked September 2026); export at the scenario you pick, from the dated tariff table. Prices are installed pricing, August 2026, standard installations; 530W LONGi panels at £1,000 per kWp. Estimates for illustration, not a quote: your free design call prices your actual roof.
Connecting solar to the Berwickshire network
On NESO's licence-area map, the middle of Berwickshire falls in South and Central Scotland, which SP Energy Networks operates, and so do all the towns we cover in the county.
Most home systems stay within 3.68kW per phase of inverter output, which puts them on G98, a notification to SP Energy Networks within 28 days of switch-on. Panel count does not decide it; the inverter and any battery do.
A bigger inverter or battery output needs a G99 application in advance. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Berwickshire
A heat pump in Berwickshire
Solar and a heat pump pull in opposite directions through the year: Berwickshire's roofs make 900 kWh from November to February on a 12-panel system, and 2,920 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.
Scottish homes apply through Home Energy Scotland rather than the Boiler Upgrade Scheme: up to £7,500 in grant for a heat pump, up to £7,500 more as an optional interest-free loan, and a £1,500 uplift for rural and island homes (checked 28 September 2026).
Charging an EV in Berwickshire
A 12-panel roof in Berwickshire makes about 790 kWh in May. A typical home uses around 70 kWh of that in daylight (the calculator's typical-use settings), which leaves most of the month's output for an EV or for export.
The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar in Berwickshire: your questions answered
What could a roof in Berwickshire generate?
PVGIS puts a roof in Berwickshire at 939 kWh per kWp a year, 2.57 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 5,970 kWh a year, most of it between April and September.
How much are solar panels in Berwickshire?
The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in Berwickshire before a battery. What Berwickshire changes is the return, about 5,970 kWh a year from that system, and your design call prices your actual roof.
Do I need permission from the DNO for solar in Berwickshire?
Usually not in advance. SP Energy Networks, the network operator for Berwickshire, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds SP Energy Networks as it does every network operator. "See our DNO explainer.
How much can I earn from exporting solar in Berwickshire?
With typical use and no battery, a 12-panel system in Berwickshire exports about 5,035 kWh a year. At 12p per kWh that is roughly £604; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.
Do solar panels work in winter in Berwickshire?
Yes, at a lower level. PVGIS gives Berwickshire 24.5 kWh per kWp in December and 29 in January, so a 12-panel system makes about 160 kWh and 180 kWh in those months, against 790 kWh in May. Winter output mostly covers daytime use rather than exporting.
Nearby in Scotland
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Berwickshire homeowners
The same guidance we would talk through on your call, written down and sourced.
Solar installation day: exactly what happens, hour by hour
The week before, the day itself hour by hour, and the paperwork that follows.
Read the guide →GivEnergy in administration: what owners should do now
The sourced timeline, the warranty position, and the owner's checklist for this month.
Read the guide →What an EV charger installation actually involves
Main fuse, DNO notification, load balancing and the paperwork. What really happens.
Read the guide →How an air source heat pump actually works
It moves heat rather than making it. The cycle, the efficiency numbers and the trade-offs.
Read the guide →The price cap explained, and what it does to solar payback
The cap limits unit rates, not bills. That changes what solar payback means.
Read the guide →What MCS certification actually is, and why your export payments depend on it
The badge that decides whether your solar earns export payments. It cannot be added later.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.