Home › Coverage › Cambridgeshire › Histon and Impington
CambridgeshireSolar panels in Histon and Impington,
priced honestly.
Independent guidance on solar and battery storage for Histon and Impington homes in Cambridgeshire: a free remote design call first, then an MCS-certified installation team for your area if you decide to go ahead. PVGIS puts a roof in Histon and Impington at 1,037 kWh per kWp a year, level with our Cambridgeshire county estimate.
Start with your postcode
Free, no obligation. Takes about two minutes, and nobody visits your home.
What a roof in Histon and Impington can generate
Real satellite data for Histon and Impington, real installed pricing, and the same honest model we run for every place we cover.
How Histon and Impington compares
Small towns rarely get published solar figures, so here are the numbers for Histon and Impington. It is one of 11 Cambridgeshire towns we track, and it ranks joint 2nd of 11 for solar yield, a town of 7,904 people in the House of Commons Library settlement data. PVGIS gives its roofs 1,037 kWh per kWp a year, 2.84 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £926 of year one benefit, £247 of it from your own generation and £679 from export at 12p.
Treat these as calibration rather than a quote. The calculator below runs the same model, defaulted to Histon and Impington's own yield, and at Histon and Impington's 1,037 kWh per kWp it prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Any planning application in Histon and Impington sits with South Cambridgeshire, and its official House of Commons Library settlement class is small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Price this properly, free →Your real roof, your real usage, on a free video call. No obligation.
A 12 panel, 6.36 kWp system in Histon and Impington generates around 6,595 kWh a year, worth around £926 in year one on the 12p export scenario.
Generation is modelled from PVGIS satellite data for Histon and Impington's own coordinates (52.24975, 0.10871), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate, with the full methodology, sourcing and assumptions set out on our help page.
Solar panel servicing and repair in Histon and Impington
The same sourced benchmarks apply in Histon and Impington as everywhere we cover: honest repair pricing and what a service should include.
Common questions about solar in Histon and Impington
What could a roof in Histon and Impington generate?
PVGIS puts a roof in Histon and Impington at 1,037 kWh per kWp a year, 2.84 peak sun hours a day averaged across the seasons.
What does a typical solar system cost in Histon and Impington?
A typical 12 panel, 6.36 kWp system in Histon and Impington costs around £6,360 installed, at £1,000 per kWp before any battery.
Would a system in Histon and Impington need a G99 application?
Most home solar and battery systems qualify for the simpler G98 notification, made to the network operator (DNO) after installation rather than before. A minority, usually larger systems, need the fuller G99 process instead. Your design call checks which applies in Histon and Impington before anything is booked; our G98 vs G99 guide explains the difference in full.
What could I earn from exporting in Histon and Impington?
On the 12p export scenario, that 12 panel system sends about 5,659 kWh a year to the grid, worth around £679. The tariff guide compares the export rates that could apply to your setup.
Get your free quote
Takes about two minutes. We work out your options, then confirm your free remote design call, on video, at a time that suits you. It starts with your roof and your numbers, and the design is built around them rather than around a product someone needs to shift.
Reading for Histon and Impington homeowners
Independent, sourced and dated. The same ground we cover on your free call.
How to size a solar and battery system, properly
Usage, storage, connection, array. Four decisions, and the order between them matters.
Read the guide →Adding a battery to solar panels you already own
Retrofitting a battery to working solar is straightforward. The paperwork is where people trip up.
Read the guide →The main home EV chargers, compared on what actually differs
Eight popular UK home chargers on cable, connectivity, warranty and tariff integration.
Read the guide →What MCS certification actually buys you on a heat pump job
The gate on the £7,500 grant, the design standard behind your running costs, and the noise sign-off.
Read the guide →EV tariffs compared: the cheapest overnight windows
Overnight rates of 6.99p to 9p against a 26.11p capped average, compared.
Read the guide →G98 or G99: which one applies, what the application involves, and how long it takes
The G98 line sits at 3.68kW per phase. Above it, your network operator has to say yes first.
Read the guide →How Histon and Impington compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp | Peak sun hours | vs Histon and Impington |
|---|---|---|---|
| Histon and Impington | 1,037 | 2.84 | — |
| Cambridge | 1,037 | 2.84 | level |
| Cambourne | 1,036 | 2.84 | -1 kWh |
| St Ives (Huntingdonshire) | 1,038 | 2.84 | +1 kWh |
| Soham | 1,037 | 2.84 | level |
| Ely | 1,029 | 2.82 | -8 kWh |
| Newmarket | 1,032 | 2.83 | -5 kWh |
PVGIS v5.2 for each town centroid, identical assumptions throughout. A few kWh either way is weather-year noise; a spread beyond about 30 kWh per kWp is real geography.
Also for Histon and Impington: Solar panels in Histon and Impington from OVO Solar & Battery