Solar panels in Histon and Impington, designed on a free call.
Twelve panels (6.36 kWp) here make about 6,600 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
How much a Histon and Impington roof makes, month by month
From 38 kWh per kWp in December to 124.8 in July: a roof in Histon and Impington makes 3.3 times as much in its best month as in its darkest, and 1,037 kWh per kWp across the year.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 39.6 |
| February | 55 |
| March | 89.5 |
| April | 116 |
| May | 124 |
| June | 123 |
| July | 125 |
| August | 112 |
| September | 97.7 |
| October | 68.7 |
| November | 49 |
| December | 38 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
For scale: 1,037 kWh per kWp in Histon and Impington against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Histon and Impington 12% above it.
How Histon and Impington compares
Small towns rarely get published solar figures, so here are the numbers for Histon and Impington. It is one of 11 Cambridgeshire towns we track, and it ranks joint 2nd of 11 for solar yield, a town of 7,904 people in the House of Commons Library settlement data. PVGIS gives its roofs 1,037 kWh per kWp a year, 2.84 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £926 of year one benefit, £247 of it from your own generation and £679 from export at 12p.
Every figure here assumes a clear, south-facing roof at 35 degrees. Yours will differ, which is what the free design call is for; until then, the calculator below tests panels, batteries and export rates on Histon and Impington's own yield.
Any planning application in Histon and Impington sits with South Cambridgeshire, and its official House of Commons Library settlement class is small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
The figures use PVGIS for the centre of Histon and Impington (52.24975, 0.10871), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.
UK Power Networks and your Histon and Impington connection
On NESO's licence-area map, Histon and Impington is in East England, which UK Power Networks operates. That makes UK Power Networks the network operator for any system fitted here.
Most home systems stay within 3.68kW per phase of inverter output, which puts them on G98, a notification to UK Power Networks within 28 days of switch-on. Panel count does not decide it; the inverter and any battery do.
Above that, G99 means applying before the work is booked. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.
Sources: NESO DNO licence areas (3 May 2024); Ofgem, Distributed Generation Standards Direction guidance, checked 27 September 2026. G98 vs G99, explained.

Beyond the panels: heating and car charging in Histon and Impington
A heat pump in Histon and Impington
In December, the darkest month here, 12 panels in Histon and Impington make about 240 kWh. That is when a heat pump runs hardest, so its running cost in Histon and Impington comes down to the tariff and the flow temperature rather than the roof.
Grant support in England comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).
Charging an EV in Histon and Impington
Histon and Impington's July output, about 790 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
Installed prices, the same in every town
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Histon and Impington
The same sourced benchmarks apply in Histon and Impington as everywhere we cover: honest repair pricing and what a service should include.
Common questions about solar in Histon and Impington
How much electricity do solar panels make in Histon and Impington?
About 6,600 kWh a year from 12 panels (6.36 kWp), on PVGIS satellite data for Histon and Impington: 1,037 kWh per kWp, or 2.84 peak sun hours a day on average. July is the strongest month, at about 790 kWh.
Is solar more expensive in Histon and Impington?
Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Histon and Impington, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,600 kWh a year here, which is what drives payback.
Which DNO covers Histon and Impington, and what does it need from me?
UK Power Networks covers Histon and Impington. A home system of up to 3.68kW per phase is notified to UK Power Networks within 28 days of commissioning under G98, and nothing waits on approval. Larger outputs need a G99 application before work starts. Ofgem's guaranteed standard for a low voltage generation connection quotation is 45 working days, with £80 paid for each working day late, and it binds UK Power Networks as it does every network operator.
What could I earn from exporting in Histon and Impington?
On the 12p export scenario, a 12-panel system in Histon and Impington sends about 5,659 kWh a year to the grid, worth around £679. The export rates table compares what each supplier pays.
How much solar does Histon and Impington get in December?
December is the low point: about 240 kWh from a 12-panel system in Histon and Impington, on PVGIS data, rising to 790 kWh in July. From November to February the same system makes about 1,150 kWh in total, which is why a battery charged off-peak does more of the work in winter.
How Histon and Impington compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs Histon and Impington |
|---|---|---|
| Histon and Impington | 1,037 | this town |
| Cambridge | 1,037 | level |
| Cambourne | 1,036 | −1 kWh |
| St Ives | 1,038 | +1 kWh |
| Soham | 1,037 | level |
| Ely | 1,029 | −8 kWh |
| Newmarket | 1,032 | −5 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
Also for Histon and Impington: Solar panels in Histon and Impington from OVO Solar & Battery
Also near Histon and Impington
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for Histon and Impington
Sourced, dated and written by us. The same ground we cover on your free call.
What the January price cap means for solar, and what it does not
The whole-bill forecast is gas-led. What solar actually competes with is smaller, and mostly unpublished.
Read the guide →Adding a battery to solar panels you already own
Retrofitting a battery to working solar is straightforward. The paperwork is where people trip up.
Read the guide →The main home EV chargers, compared on what actually differs
Eight popular UK home chargers on cable, connectivity, warranty and tariff integration.
Read the guide →What MCS certification actually buys you on a heat pump job
The gate on the £7,500 grant, the design standard behind your running costs, and the noise sign-off.
Read the guide →Why the best export rates always carry conditions
The top export rates are acquisition offers. Here is how to price the condition.
Read the guide →G98 or G99: which one applies, what the application involves, and how long it takes
The G98 line sits at 3.68kW per phase. Above it, your network operator has to say yes first.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.