Solar panels in Chandler's Ford, designed on a free call.
About 6,770 kWh a year from 12 panels in Chandler's Ford, £6,360 installed, with your system designed on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
How much a Chandler's Ford roof makes, month by month
PVGIS puts Chandler's Ford at 1,064 kWh per kWp a year, 2% above our Hampshire county estimate. 67% of it arrives between April and September, peaking in July.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 42.2 |
| February | 56 |
| March | 92.9 |
| April | 120 |
| May | 127 |
| June | 128 |
| July | 130 |
| August | 114 |
| September | 99 |
| October | 68.8 |
| November | 48.5 |
| December | 38 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
For scale: 1,064 kWh per kWp in Chandler's Ford against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Chandler's Ford 15% above it.
How Chandler's Ford compares
Among the places we publish figures for, Chandler's Ford is one of 45 Hampshire towns we track, and it ranks 32nd of 45 for solar yield. It is a medium town in the House of Commons Library classification, with 32,167 residents, and its roofs see 2.92 peak sun hours a day across the year. That drives the standard 12 panel model to 6,767 kWh of generation, of which around 5,830 kWh is exported at 12p for £700 a year, with £247 saved on electricity you would otherwise buy at 26.32p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Chandler's Ford's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Any planning application in Chandler's Ford sits with Eastleigh, and its official House of Commons Library settlement class is medium town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for Chandler's Ford at 50.9868, -1.38474 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
SSEN and your Chandler's Ford connection
The distribution network operator (DNO) for Chandler's Ford is Scottish and Southern Electricity Networks (SSEN), which runs the Southern England licence area.
G98 is the simple route. If the inverter, plus any battery, stays at or under 3.68kW per phase, SSEN only has to be told within 28 days after the system is commissioned.
Above that, G99 means applying before the work is booked. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW.
Sources: NESO DNO licence areas (3 May 2024); SSEN, micro-generation connections page, checked 25 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Chandler's Ford
A heat pump in Chandler's Ford
Heating demand peaks when solar is weakest. In Chandler's Ford, a 12-panel system makes about 240 kWh in December and 270 kWh in January, a fraction of its 830 kWh in July, which is why a heat pump here is costed on its tariff first.
In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).
Charging an EV in Chandler's Ford
Chandler's Ford's July output, about 830 kWh from 12 panels, is several times the 70 kWh or so a typical home uses in daylight that month on our calculator's settings. Daytime charging turns that surplus into miles.
Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Chandler's Ford
If a system in Chandler's Ford is underperforming, start with the guides below: repair benchmarks, service scope, and the inverter question.
Solar in Chandler's Ford: your questions answered
How much energy would 12 solar panels make in Chandler's Ford?
Chandler's Ford averages 2.92 peak sun hours a day, which PVGIS turns into 1,064 kWh per kWp a year. On a 12-panel, 6.36 kWp roof that is about 6,770 kWh, 67% of it between April and September.
Is solar more expensive in Chandler's Ford?
Prices on this site are the same everywhere: £1,000 per kWp installed, which puts a 12-panel system at £6,360 in Chandler's Ford, and a Duracell Dura16 installed with solar at £4,450 on top. The local part is generation, about 6,770 kWh a year here, which is what drives payback.
Who is the network operator in Chandler's Ford, and do I need a G99 application?
The operator is Scottish and Southern Electricity Networks (SSEN). Most home systems use the G98 route, a notification within 28 days of switch-on for up to 3.68kW per phase, so nothing waits on the network. Above that, G99 applies and has to be granted first. SSEN says it can take up to 45 working days to issue a quotation for a generation connection above 3.68kW per phase and up to 50kW. Your design call checks which route yours needs.
What could I earn from exporting in Chandler's Ford?
On the 12p export scenario, a 12-panel system in Chandler's Ford sends about 5,830 kWh a year to the grid, worth around £700. The export rates table compares what each supplier pays.
How does solar perform in Chandler's Ford in the winter months?
December is the weakest month in Chandler's Ford: about 240 kWh from 12 panels, against 830 kWh in July. The panels still generate on bright winter days; they just cover a smaller share of what the house uses.
How Chandler's Ford compares with its neighbours
How the towns nearest Chandler's Ford compare on the same PVGIS settings, closest first.
| Town | kWh per kWp a year | vs Chandler's Ford |
|---|---|---|
| Chandler's Ford | 1,064 | this town |
| Eastleigh | 1,070 | +6 kWh |
| Romsey | 1,063 | −1 kWh |
| West End | 1,085 | +21 kWh |
| Southampton | 1,080 | +16 kWh |
| Winchester | 1,037 | −27 kWh |
| Hedge End | 1,084 | +20 kWh |
Each row is a PVGIS v5.2 run at that town's centre with the same settings. Treat gaps of a few kWh as noise and gaps over about 30 kWh per kWp as real differences in sunshine.
Also for Chandler's Ford: Solar panels in Chandler's Ford from OVO Solar & Battery
Also near Chandler's Ford
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Chandler's Ford homeowners
Sourced, dated and written by us. The same ground we cover on your free call.
Are solar panels worth it in 2026? Here is the actual maths
Roughly £1,000 per kWp installed, offsetting electricity at 26.32p a unit. The real arithmetic.
Read the guide →GivEnergy in administration: what owners should do now
The sourced timeline, the warranty position, and the owner's checklist for this month.
Read the guide →Home EV charger types and speeds, explained properly
Granny cable, 7kW wall unit or 22kW three phase. What each adds per hour, and which you need.
Read the guide →Sizing a heat pump: what a proper survey covers
Sized by calculation, not by rule of thumb. What the survey covers, and what guessing costs.
Read the guide →The price cap explained, and what it does to solar payback
The cap limits unit rates, not bills. That changes what solar payback means.
Read the guide →Your MCS certificate: what it shows, when it arrives, and how a Smart Export Guarantee supplier uses it
The document your export payments hang on. Who issues it, what it shows, and how to get a copy.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.