Solar panels in Radstock, priced before anyone visits.
Twelve panels (6.36 kWp) here make about 6,380 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
How much a Radstock roof makes, month by month
PVGIS puts Radstock at 1,003 kWh per kWp a year, 3% below our Somerset county estimate. 68% of it arrives between April and September, peaking in July.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 37.6 |
| February | 52 |
| March | 88.5 |
| April | 115 |
| May | 124 |
| June | 121 |
| July | 125 |
| August | 108 |
| September | 93.5 |
| October | 63.3 |
| November | 43.9 |
| December | 31.7 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Against Great Britain as a whole: Radstock makes 1,003 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so Radstock is 8% above it.
How Radstock compares
Small towns rarely get published solar figures, so here are the numbers for Radstock. It is one of 21 Somerset towns we track, and it ranks 21st of 21 for solar yield, a town of 10,216 people in the House of Commons Library settlement data. PVGIS gives its roofs 1,003 kWh per kWp a year, 2.75 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £900 of year one benefit, £247 of it from your own generation and £653 from export at 12p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Radstock's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Any planning application in Radstock sits with Bath and North East Somerset, and its official House of Commons Library settlement class is small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Generation is modelled from PVGIS satellite data for Radstock's own coordinates (51.28974, -2.45121), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.
NGED and your Radstock connection
The distribution network operator (DNO) for Radstock is National Grid Electricity Distribution (NGED), which runs the South West England licence area.
For a typical home the paperwork is light: a system of up to 3.68kW per phase goes through G98, which means NGED is notified within 28 days of switch-on rather than asked beforehand.
Larger systems go through G99 instead, applied for before installation. On timing: NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.
Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Radstock
A heat pump in Radstock
In December, the darkest month here, 12 panels in Radstock make about 200 kWh. That is when a heat pump runs hardest, so its running cost in Radstock comes down to the tariff and the flow temperature rather than the roof.
Grant support in England comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).
Charging an EV in Radstock
Summer is where a car earns its place. In July, 12 panels in Radstock make about 790 kWh, against roughly 70 kWh a typical home uses in daylight that month on our calculator's typical-use settings, so there is surplus a smart charger can put into the car instead of exporting it.
The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).
Installed prices, the same in every town
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Radstock
The same sourced benchmarks apply in Radstock as everywhere we cover: honest repair pricing and what a service should include.
Radstock solar questions
How much electricity do solar panels make in Radstock?
About 6,380 kWh a year from 12 panels (6.36 kWp), on PVGIS satellite data for Radstock: 1,003 kWh per kWp, or 2.75 peak sun hours a day on average. July is the strongest month, at about 790 kWh.
What does a typical solar system cost in Radstock?
Solar is priced at £1,000 per kWp installed wherever you live, so a 12-panel, 6.36 kWp system costs £6,360 in Radstock, exactly as it would anywhere else, before any battery. Location changes what the system makes, not what it costs: here that is about 6,380 kWh a year. The final figure comes from your roof on the design call.
Which DNO covers Radstock, and what does it need from me?
National Grid Electricity Distribution (NGED) covers Radstock. A home system of up to 3.68kW per phase is notified to NGED within 28 days of commissioning under G98, and nothing waits on approval. Larger outputs need a G99 application before work starts. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.
What happens to the solar I do not use in Radstock?
Around £653 a year at 12p per kWh, for the roughly 5,442 kWh a 12-panel system in Radstock exports with typical use. Rates vary by supplier and some need their own tariff; the export rates table is dated and sourced.
How much solar does Radstock get in December?
December is the low point: about 200 kWh from a 12-panel system in Radstock, on PVGIS data, rising to 790 kWh in July. From November to February the same system makes about 1,050 kWh in total, which is why a battery charged off-peak does more of the work in winter.
How Radstock compares with its neighbours
The six closest towns we publish, run through the identical PVGIS query as Radstock.
| Town | kWh per kWp a year | vs Radstock |
|---|---|---|
| Radstock | 1,003 | this town |
| Midsomer Norton | 1,005 | +2 kWh |
| Frome | 1,008 | +5 kWh |
| Bath | 1,018 | +15 kWh |
| Shepton Mallet | 1,015 | +12 kWh |
| Keynsham | 1,020 | +17 kWh |
| Bradford-on-Avon | 1,020 | +17 kWh |
Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.
Also for Radstock: Solar panels in Radstock from OVO Solar & Battery
Also near Radstock
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Guides worth reading before your call
Sourced, dated and written by us. The same ground we cover on your free call.
Single phase or three phase? The sixty-second check that decides your system size
One look at your fuse board sets the ceiling on how much solar you can connect.
Read the guide →Adding a battery to solar panels you already own
Retrofitting a battery to working solar is straightforward. The paperwork is where people trip up.
Read the guide →What it really costs to charge an EV at home versus in public
Home off-peak charging costs a fraction of the public price. The arithmetic, and the tariff it depends on.
Read the guide →What MCS certification actually buys you on a heat pump job
The gate on the £7,500 grant, the design standard behind your running costs, and the noise sign-off.
Read the guide →EV tariffs compared: the cheapest overnight windows
Overnight rates of 6.99p to 9p against a 26.32p capped average, compared.
Read the guide →How to check an MCS certificate is genuine, before the deposit leaves your account
A logo proves nothing. Certification is business specific, technology specific and checkable.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.