Solar panels in New Ollerton and Ollerton.
Twelve panels here make about 6,280 kWh a year for £6,360 installed, designed on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
What a roof in New Ollerton and Ollerton can generate
PVGIS puts New Ollerton and Ollerton at 988 kWh per kWp a year, level with our Nottinghamshire county estimate. 68% of it arrives between April and September, peaking in May.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 35.2 |
| February | 52.2 |
| March | 86.5 |
| April | 110 |
| May | 123 |
| June | 115 |
| July | 121 |
| August | 111 |
| September | 93.8 |
| October | 63.5 |
| November | 43.5 |
| December | 33.5 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 988, New Ollerton and Ollerton is 7% above it.
How New Ollerton and Ollerton compares
Small towns rarely get published solar figures, so here are the numbers for New Ollerton and Ollerton. It is one of 29 Nottinghamshire towns we track, and it ranks 7th of 29 for solar yield, a town of 11,494 people in the House of Commons Library settlement data. PVGIS gives its roofs 988 kWh per kWp a year, 2.71 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £889 of year one benefit, £247 of it from your own generation and £642 from export at 12p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on New Ollerton and Ollerton's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
New Ollerton and Ollerton sits within Newark and Sherwood, its local planning authority, and the House of Commons Library classes it as a small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for New Ollerton and Ollerton at 53.2044, -1.00617 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
Connecting solar to the New Ollerton and Ollerton network
New Ollerton and Ollerton sits in National Grid Electricity Distribution's East Midlands licence area, so NGED is the network operator (DNO) any solar panels or battery here are registered with.
Below 3.68kW per phase of inverter and battery output, the G98 route applies: the installation is notified to NGED within 28 days of commissioning, with no prior approval.
Anything bigger is a G99 case and is applied for first. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.
Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in New Ollerton and Ollerton
A heat pump in New Ollerton and Ollerton
Solar and a heat pump pull in opposite directions through the year: New Ollerton and Ollerton's roofs make 1,050 kWh from November to February on a 12-panel system, and 2,990 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.
In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).
Charging an EV in New Ollerton and Ollerton
From April to September, 68% of a New Ollerton and Ollerton roof's yearly output arrives, peaking at about 780 kWh in May on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.
Renters and flat owners with private off-street parking can get 75% off a chargepoint and its installation, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above adds a 7.4kW smart charger from £1,100 installed.
Installed prices, the same in every town
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in New Ollerton and Ollerton
Guidance is nationwide, so the benchmarks hold in New Ollerton and Ollerton: repair costs, service scope, and when the inverter is the real fault.
New Ollerton and Ollerton solar questions
What could a roof in New Ollerton and Ollerton generate?
PVGIS puts a roof in New Ollerton and Ollerton at 988 kWh per kWp a year, 2.71 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 6,280 kWh a year, most of it between April and September.
How much are solar panels in New Ollerton and Ollerton?
The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in New Ollerton and Ollerton before a battery. What New Ollerton and Ollerton changes is the return, about 6,280 kWh a year from that system, and your design call prices your actual roof.
Do I need permission from the DNO for solar in New Ollerton and Ollerton?
Usually not in advance. NGED, the network operator for New Ollerton and Ollerton, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late. "See our DNO explainer.
How much can I earn from exporting solar in New Ollerton and Ollerton?
With typical use and no battery, a 12-panel system in New Ollerton and Ollerton exports about 5,347 kWh a year. At 12p per kWh that is roughly £642; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.
Do solar panels work in winter in New Ollerton and Ollerton?
Yes, at a lower level. PVGIS gives New Ollerton and Ollerton 33.5 kWh per kWp in December and 35.2 in January, so a 12-panel system makes about 210 kWh and 220 kWh in those months, against 780 kWh in May. Winter output mostly covers daytime use rather than exporting.
How New Ollerton and Ollerton compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs New Ollerton and Ollerton |
|---|---|---|
| New Ollerton and Ollerton | 988 | this town |
| Forest Town | 971 | −17 kWh |
| Rainworth | 979 | −9 kWh |
| Mansfield Woodhouse | 967 | −21 kWh |
| Retford | 995 | +7 kWh |
| Worksop | 959 | −29 kWh |
| Shirebrook | 966 | −22 kWh |
Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.
Also for New Ollerton and Ollerton: Solar panels in New Ollerton and Ollerton from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for New Ollerton and Ollerton
Sourced, dated and written by us. The same ground we cover on your free call.
What solar actually costs in 2026, and where every pound goes
Around £8,677 average, £1,550 to £1,800 per kW. Where every pound actually goes.
Read the guide →How much a battery saves by charging on cheap night rates
What charging at 8.5p and using at 26.32p is actually worth over a year.
Read the guide →Home EV charger types and speeds, explained properly
Granny cable, 7kW wall unit or 22kW three phase. What each adds per hour, and which you need.
Read the guide →Are heat pumps worth it? The real 2026 numbers
Electricity costs 3.3x gas per kWh. A heat pump is about 3x as efficient. The numbers nearly cancel out.
Read the guide →EV tariffs compared: the cheapest overnight windows
Overnight rates of 6.99p to 9p against a 26.32p capped average, compared.
Read the guide →Your MCS certificate: what it shows, when it arrives, and how a Smart Export Guarantee supplier uses it
The document your export payments hang on. Who issues it, what it shows, and how to get a copy.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.