Solar panels in Coseley, with the numbers shown.
A 12-panel roof in Coseley makes about 6,090 kWh a year and costs £6,360 installed; a free 30-minute video call sizes it to yours.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
What a roof in Coseley can generate
PVGIS puts Coseley at 957 kWh per kWp a year, 1% above our Staffordshire county estimate. 68% of it arrives between April and September, peaking in July.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 35 |
| February | 49.2 |
| March | 84.4 |
| April | 108 |
| May | 118 |
| June | 116 |
| July | 118 |
| August | 104 |
| September | 89.2 |
| October | 61.6 |
| November | 40.8 |
| December | 33 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
For scale: 957 kWh per kWp in Coseley against 925, our GB average (the mean of our 85 county PVGIS estimates), which puts Coseley 3% above it.
How Coseley compares
Among the places we publish figures for, Coseley is one of 44 Staffordshire towns we track, and it ranks joint 21st of 44 for solar yield. It is a medium town in the House of Commons Library classification, with 26,047 residents, and its roofs see 2.62 peak sun hours a day across the year. That drives the standard 12 panel model to 6,087 kWh of generation, of which around 5,150 kWh is exported at 12p for £618 a year, with £247 saved on electricity you would otherwise buy at 26.32p.
These are starting numbers, not a quote. The calculator below opens on Coseley's own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.
Coseley sits within Dudley, its local planning authority, and the House of Commons Library classes it as a medium town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
The figures use PVGIS for the centre of Coseley (52.53937, -2.09194), a 26.32p/kWh import price and £1,000 per kWp installed; see the help page for the full method.
Connecting solar to the Coseley network
Coseley is served by National Grid Electricity Distribution (NGED): the town's centre falls inside its West Midlands licence area on NESO's boundary map.
Most home systems stay within 3.68kW per phase of inverter output, which puts them on G98, a notification to NGED within 28 days of switch-on. Panel count does not decide it; the inverter and any battery do.
A bigger inverter or battery output needs a G99 application in advance. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.
Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Adding a heat pump or an EV charger in Coseley
A heat pump in Coseley
Solar and a heat pump pull in opposite directions through the year: Coseley's roofs make 1,000 kWh from November to February on a 12-panel system, and 2,900 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.
Grant support in England comes from the Boiler Upgrade Scheme: £7,500 for an air source or ground source heat pump, £2,500 for air-to-air, and an extra £1,500 until March 2027 where the home is heated by oil or LPG off the gas grid (gov.uk, checked 28 September 2026).
Charging an EV in Coseley
From April to September, 68% of a Coseley roof's yearly output arrives, peaking at about 750 kWh in July on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.
The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).
The packages, priced before anyone visits
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Coseley
Guidance is nationwide, so the benchmarks hold in Coseley: repair costs, service scope, and when the inverter is the real fault.
Coseley solar questions
What could a roof in Coseley generate?
PVGIS puts a roof in Coseley at 957 kWh per kWp a year, 2.62 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 6,090 kWh a year, most of it between April and September.
How much are solar panels in Coseley?
The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in Coseley before a battery. What Coseley changes is the return, about 6,090 kWh a year from that system, and your design call prices your actual roof.
Do I need permission from the DNO for solar in Coseley?
Usually not in advance. NGED, the network operator for Coseley, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late. "See our DNO explainer.
How much can I earn from exporting solar in Coseley?
With typical use and no battery, a 12-panel system in Coseley exports about 5,150 kWh a year. At 12p per kWh that is roughly £618; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.
Do solar panels work in winter in Coseley?
Yes, at a lower level. PVGIS gives Coseley 33 kWh per kWp in December and 35 in January, so a 12-panel system makes about 210 kWh and 220 kWh in those months, against 750 kWh in July. Winter output mostly covers daytime use rather than exporting.
How Coseley compares with its neighbours
How the towns nearest Coseley compare on the same PVGIS settings, closest first.
| Town | kWh per kWp a year | vs Coseley |
|---|---|---|
| Coseley | 957 | this town |
| Sedgley | 948 | −9 kWh |
| Tipton | 957 | level |
| Bilston | 955 | −2 kWh |
| Dudley | 956 | −1 kWh |
| Darlaston | 962 | +5 kWh |
| Rowley Regis | 965 | +8 kWh |
PVGIS v5.2 for each town centroid, identical assumptions throughout. A few kWh either way is weather-year noise; a spread beyond about 30 kWh per kWp is real geography.
Also near Coseley
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Coseley homeowners
Sourced, dated and written by us. The same ground we cover on your free call.
Microinverters, optimisers or a plain string inverter: who needs what
Shade and roof layout decide this. An honest triage of the three approaches.
Read the guide →Tesla Powerwall 3 vs Duracell Dura16: which fits your home?
The two packages we actually price, compared on the numbers that decide it.
Read the guide →What an EV charger installation actually involves
Main fuse, DNO notification, load balancing and the paperwork. What really happens.
Read the guide →The Boiler Upgrade Scheme, explained
A fixed amount, claimed on your behalf by our installation teams, with a real deadline on the £9,000 version.
Read the guide →What the Smart Export Guarantee actually is
The scheme obliges suppliers to pay above zero, and leaves the rate to them.
Read the guide →What MCS certification actually is, and why your export payments depend on it
The badge that decides whether your solar earns export payments. It cannot be added later.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.