Solar panels in Uttoxeter, with the numbers shown.
Twelve panels (6.36 kWp) here make about 6,110 kWh a year for £6,360 installed, designed around your roof on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
What a roof in Uttoxeter can generate
Uttoxeter's best month is May, at 120.4 kWh per kWp; December manages 30.8. Over the year that comes to 961 kWh per kWp, 1% above our Staffordshire county estimate.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 34 |
| February | 49.7 |
| March | 84.3 |
| April | 109 |
| May | 120 |
| June | 115 |
| July | 120 |
| August | 106 |
| September | 90.7 |
| October | 59.9 |
| November | 40.8 |
| December | 30.8 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Our GB average is 925 kWh per kWp a year, the mean of the 85 county PVGIS estimates we publish; at 961, Uttoxeter is 4% above it.
How Uttoxeter compares
Small towns rarely get published solar figures, so here are the numbers for Uttoxeter. It is one of 44 Staffordshire towns we track, and it ranks 14th of 44 for solar yield, a town of 14,598 people in the House of Commons Library settlement data. PVGIS gives its roofs 961 kWh per kWp a year, 2.63 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £868 of year one benefit, £247 of it from your own generation and £621 from export at 12p.
These are starting numbers, not a quote. The calculator below opens on Uttoxeter's own PVGIS figure; change the panels, the battery or the export rate and it reruns. The design call replaces every assumption with your roof and your bills.
Uttoxeter sits within East Staffordshire, its local planning authority, and the House of Commons Library classes it as a small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Generation is modelled from PVGIS satellite data for Uttoxeter's own coordinates (52.9002, -1.87148), using the same 26.32p/kWh import value and £1,000 per kWp installed pricing as every Clearline estimate; the methodology is on our help page.
Connecting solar to the Uttoxeter network
National Grid Electricity Distribution (NGED) owns and runs the local electricity network in Uttoxeter, as part of its East Midlands licence area.
What decides the paperwork is the inverter and battery output, not the number of panels. Up to 3.68kW per phase, a system follows G98: NGED is notified within 28 days of commissioning and nothing has to be approved first.
A bigger inverter or battery output needs a G99 application in advance. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late.
Sources: NESO DNO licence areas (3 May 2024); NGED, guaranteed standards of performance table, checked 25 September 2026. G98 vs G99, explained.

Adding a heat pump or an EV charger in Uttoxeter
A heat pump in Uttoxeter
Solar and a heat pump pull in opposite directions through the year: Uttoxeter's roofs make 990 kWh from November to February on a 12-panel system, and 2,930 kWh from May to August. The heating season leans on the grid, so off-peak rates do the heavy lifting.
In England, the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air one, with £1,500 more until March 2027 for homes heated by oil or LPG with no mains gas (gov.uk, checked 28 September 2026).
Charging an EV in Uttoxeter
From April to September, 69% of a Uttoxeter roof's yearly output arrives, peaking at about 770 kWh in May on 12 panels. A car parked at home in daylight can soak up what the house, at around 70 kWh of daytime use that month, cannot.
If you rent, or own a flat, and have private off-street parking, the government chargepoint grant covers 75% of the cost, capped at £500 a socket, until 31 March 2027 (gov.uk, checked 28 September 2026). The calculator above prices a 7.4kW smart charger from £1,100 installed.
What the named kit costs, installed
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Uttoxeter
Guidance is nationwide, so the benchmarks hold in Uttoxeter: repair costs, service scope, and when the inverter is the real fault.
Common questions about solar in Uttoxeter
What could a roof in Uttoxeter generate?
PVGIS puts a roof in Uttoxeter at 961 kWh per kWp a year, 2.63 peak sun hours a day averaged across the seasons. A 12-panel, 6.36 kWp system makes about 6,110 kWh a year, most of it between April and September.
How much are solar panels in Uttoxeter?
The price does not move by postcode. At £1,000 per kWp installed, 12 panels (6.36 kWp) come to £6,360 in Uttoxeter before a battery. What Uttoxeter changes is the return, about 6,110 kWh a year from that system, and your design call prices your actual roof.
Do I need permission from the DNO for solar in Uttoxeter?
Usually not in advance. NGED, the network operator for Uttoxeter, only needs a G98 notification within 28 days of commissioning for systems up to 3.68kW per phase. Bigger inverter or battery outputs need G99 approval first. NGED's guaranteed standards give 45 working days for a low voltage generation quotation, with £80 paid for each working day late. "See our DNO explainer.
How much can I earn from exporting solar in Uttoxeter?
With typical use and no battery, a 12-panel system in Uttoxeter exports about 5,175 kWh a year. At 12p per kWh that is roughly £621; a supplier paying more, or a battery that keeps more for the evening, changes the figure. See the export rates table.
Do solar panels work in winter in Uttoxeter?
Yes, at a lower level. PVGIS gives Uttoxeter 30.8 kWh per kWp in December and 34 in January, so a 12-panel system makes about 200 kWh and 220 kWh in those months, against 770 kWh in May. Winter output mostly covers daytime use rather than exporting.
How Uttoxeter compares with its neighbours
Same satellite dataset, same assumptions, so the differences are real geography rather than modelling noise.
| Town | kWh per kWp a year | vs Uttoxeter |
|---|---|---|
| Uttoxeter | 961 | this town |
| Cheadle (Staffordshire Moorlands) | 953 | −8 kWh |
| Ashbourne | 962 | +1 kWh |
| Hilton | 967 | +6 kWh |
| Rugeley | 971 | +10 kWh |
| Stone | 951 | −10 kWh |
| Burton upon Trent | 967 | +6 kWh |
Same PVGIS v5.2 query for every town. Small differences are within year-to-year weather; more than about 30 kWh per kWp apart is geography.
Also for Uttoxeter: Solar panels in Uttoxeter from OVO Solar & Battery
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Further reading for Uttoxeter
Sourced, dated and written by us. The same ground we cover on your free call.
Microinverters, optimisers or a plain string inverter: who needs what
Shade and roof layout decide this. An honest triage of the three approaches.
Read the guide →Does a standalone battery actually pay back?
No panels means one job: buy cheap, use later. The tariff decides whether it pays.
Read the guide →Smart charge point regulations, explained
Why your charger arrives pre-set to charge overnight, and why it waits before it starts.
Read the guide →How an air source heat pump actually works
It moves heat rather than making it. The cycle, the efficiency numbers and the trade-offs.
Read the guide →Which tariffs are actually built for battery charging
A battery buys cheap and uses dear. The tariff decides how much that is worth.
Read the guide →G98 or G99: which one applies, what the application involves, and how long it takes
The G98 line sits at 3.68kW per phase. Above it, your network operator has to say yes first.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.